My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-11-2017 Council Packet
Orono
>
City Council
>
2017
>
09-11-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 8:02:13 AM
Creation date
5/29/2019 7:49:04 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Orchard Hill of Orono - Project Narrative <br />06/27/2017 <br />the jurisdiction of the Metropolitan Council Environmental Services (MCES). The MCES operates and <br />maintains the large inter -community wastewater sewer system which transports sewage from <br />community systems to regional treatment facilities. Separate approvals from both the MCES and the <br />Metropolitan Council will be needed to connect to the regional system to move this project forward. <br />The development is proposed to drill well(s) to serve the development's water needs. <br />The proposed lots will range in size from just under an acre to over one and one half acres. All but one of <br />the homes is configured as a walk -out residential structure in order to take full advantage of the <br />topography of the site. Lot 15, located at the entry to the site, is configured as a look -out home to <br />preserve the grading profile in this area. All of the homes will have between approximately 4,000 to <br />6,000 square feet in finished floor area and include multi -car, attached garages. It is anticipated that the <br />property's rich environmental amenities and desirable location along with the builder's high-end custom <br />home credentials will provide strong marketing features which position this project in the approximately <br />$1.4M to $3.5M range. <br />City Approvals <br />Comprehensive Plan Amendment In order for the project to proceed, the YMCA and Gordon James <br />Construction are seeking comprehensive plan and zoning classification amendments from the City. <br />Currently the property is guided as "Rural -Residential" in the City's 2030 Comprehensive Land Use Plan <br />(see attached 2030 Land Use Plan). This classification is a low density single-family classification which <br />limits development to not more than one unit per two -acres. The proposed development will require a <br />reclassification to "Low -Density Residential" (LDR), which allows from 0.5 to 2.0 units per acre. <br />The City's MUSA line (Metropolitan Urban Service Area) will also need to be amended to include the <br />subject property so that the proposed neighborhood has access the regional sewer main which abuts <br />the property. The MUSA reclassification is consistent with current Comprehensive Plan identification of <br />the subject parcel as "potentially furthersub-dividablefor residential use" (see Map 313-4). The adjacent <br />Metropolitan trunk sewer line located in the Orono Orchard Road right-of-way has more than sufficient <br />capacity to facilitate this connection. The requested comprehensive plan amendment includes the <br />addition of the subject parcel to the city's MUSA which we recognize will require Metropolitan Council <br />authorization. <br />We are also aware that the Metropolitan Council seeks to have a reasonable amount of density in each <br />development it allows to enter into the MUSA and to connect to regional sewer system. In the City of <br />Orono, the Met Council has sought to require an average density of three -units per acre or more within <br />the MUSA. There are currently two higher density project proposals being considered by the city. These <br />projects would have a positive impact on the city's goal of maintaining an average density of three -units <br />per acre or more within the MUSA area. Combined with said proposed developments, the Orchard Hill <br />of Orono development would maintain this future density threshold above the desired average density <br />of three -units per acre within the MUSA area. The proposed development's density of one unit per acre <br />
The URL can be used to link to this page
Your browser does not support the video tag.