My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-11-2017 Council Packet
Orono
>
City Council
>
2017
>
09-11-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 8:02:13 AM
Creation date
5/29/2019 7:49:04 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Monday, August 21, 2017 <br />6:30 o'clock p.m. <br />Thiesse commented he is afraid protections of the lake in connection with snow removal will create other <br />problems elsewhere and that there is very little room to turn around as it is without snow being piled in <br />that area. <br />Barnhart stated the Planning Commission can either forward the application to the City Council or table <br />the application to give the applicant time to submit the requested information. Barnhart noted the <br />Planning Commission is not recommending approval of any variances or a conditional use permit at this <br />time and that those items were highlighted merely to identify future actions that will be required as part of <br />construction of the property. Barnhart stated a separate public hearing will be held for those items. <br />Leskinen asked if the variances and conditional use permit would be discussed as part of final plat. <br />Barnhart indicated it would. <br />It was the consensus of the Planning Commission that the condition of the road be verified both before <br />and after construction. <br />Thiesse asked whether the fill would be brought in by barge. <br />Fretham stated they did not contemplate bringing trucks across the lake for fill, and that when that was <br />discussed, he thought they meant lumber and other things. Fretham indicated their plan was to bring in <br />the fill and other materials by truck. <br />Fretham noted there is a City Engineer's memo regarding drainage. <br />Barnhart stated the City Engineer's comments were added as a condition to make sure it was incorporated <br />into the final plat. <br />Thiesse asked if both homes would be built at once. <br />Fretham stated probably not. <br />Page 15 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.