My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-24-2017 Council Packet
Orono
>
City Council
>
2017
>
07-24-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 4:40:58 PM
Creation date
5/28/2019 4:34:37 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SEWER PROJECTS <br />Connection to existing City Sewer Systems: $5,100 <br />Connection to City Sewer in areas still within their assessment window (less than 15 years since project was assessed) shall pay a prorated amount equivalent to the assessment <br />residences were charged at the time of the project: <br />Connection to sewer system in adjacent city <br />Fee <br />Connection to Long Lake Sewer System $1,900.00 or per current Long Lake Fee Schedule <br />Connection to Wayzata Sewer System $632.00 or per current Wayzata Fee Schedule <br />WATER Connections <br />Connection to existing City Water Main: $4,240 <br />2017 Fee Schedule -Page 12 <br />Fee <br />2003-1 North Long Lake East <br />$15,460.00 <br />2003-2 Old Long Lake Road <br />$ 9,130.00 <br />2003-3 Sixth Ave N/Brown Rd (Phillips) <br />$11,940.00 <br />2004 North Long Lake East Extension <br />$14,610.00 <br />2004 West Farm/Homestead <br />$ 8,765.00 <br />2005-1 Webber Hills/S Brown Rd Ext <br />$13,280.00 <br />2005-1 Dickey Lake Dr N <br />$15,940.00 <br />2006-1 Jamestown Road <br />$14,110.00 <br />2007 Farview Lane Sewer <br />$10,650.00 <br />Connection to sewer system in adjacent city <br />Fee <br />Connection to Long Lake Sewer System $1,900.00 or per current Long Lake Fee Schedule <br />Connection to Wayzata Sewer System $632.00 or per current Wayzata Fee Schedule <br />WATER Connections <br />Connection to existing City Water Main: $4,240 <br />2017 Fee Schedule -Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.