Laserfiche WebLink
SEWER PROJECTS <br />Connection to existing City Sewer Systems: $5,100 <br />Connection to City Sewer in areas still within their assessment window (less than 15 years since project was assessed) shall pay a prorated amount equivalent to the assessment <br />residences were charged at the time of the project: <br />Connection to sewer system in adjacent city <br />Fee <br />Connection to Long Lake Sewer System $1,900.00 or per current Long Lake Fee Schedule <br />Connection to Wayzata Sewer System $632.00 or per current Wayzata Fee Schedule <br />WATER Connections <br />Connection to existing City Water Main: $4,240 <br />2017 Fee Schedule -Page 12 <br />Fee <br />2003-1 North Long Lake East <br />$15,460.00 <br />2003-2 Old Long Lake Road <br />$ 9,130.00 <br />2003-3 Sixth Ave N/Brown Rd (Phillips) <br />$11,940.00 <br />2004 North Long Lake East Extension <br />$14,610.00 <br />2004 West Farm/Homestead <br />$ 8,765.00 <br />2005-1 Webber Hills/S Brown Rd Ext <br />$13,280.00 <br />2005-1 Dickey Lake Dr N <br />$15,940.00 <br />2006-1 Jamestown Road <br />$14,110.00 <br />2007 Farview Lane Sewer <br />$10,650.00 <br />Connection to sewer system in adjacent city <br />Fee <br />Connection to Long Lake Sewer System $1,900.00 or per current Long Lake Fee Schedule <br />Connection to Wayzata Sewer System $632.00 or per current Wayzata Fee Schedule <br />WATER Connections <br />Connection to existing City Water Main: $4,240 <br />2017 Fee Schedule -Page 12 <br />