Laserfiche WebLink
City Administrator may require an erosion control <br />escrow for projects disturbing soils. $ 1,000.00 <br />Valuation based on ICC 2012 Building Valuation tables <br />Total Valuation <br />Fee <br />$1.00 to $500 <br />$26.25 <br />$501.00 to $2,000.00 <br />$26.25 for the first $500.00 plus $3.41 for each additional $100.00, <br />$ <br />or fraction thereof, to and including $2,000.00 <br />$2,001.00 to $25,000.00 <br />$77.40 for the first $2,000.00 plus $15.49 for each additional <br />Retaining walls <br />$1,000.00, or fraction thereof, to and including $25,000.00 <br />$25,001.00 to $50,000.00 <br />$433.67 for the first $25,000.00 plus $11.29 for each additional <br />Plumbing <br />$1,000.00, or fraction thereof, to and including $50,000.00 <br />$50,001.00 to $100,000.00 <br />$715.92 for the first $50,000.00 plus $7.88 for each additional <br />Fire Sprinkler Systsmes - Commercial <br />$1,000.00, or fraction thereof, to and including $100,000.00 <br />$100,001.00 to $500,000.00 <br />$1109.92 for the first $100,000.00 plus $6.30 for each additional <br />$ 10.00 <br />$1,000.00, or fraction thereof, to and including $500,000.00 <br />$500,001.00 to $1,000,000.00 <br />$3,629.92 for the first $500,000.00 plus $5.25 for each additional <br />50.00 <br />$1,000.00, or fraction thereof, to and including $1,000,000.00 <br />$1,000,001.00 and up <br />$6,254.92 for the first $1,000,000.00 plus $4.20 for each additional <br />1.25% <br />$1,000.00, or fraction thereof <br />Demolition: Principal structure <br />$ <br />100.00 <br />$ 100.00 $ 1,000.00 <br />$ 50.00 <br />Demolition: Accessory structure <br />$ <br />50.00 <br />$ 50.00 <br />Fire Plan review fee <br />Retaining walls <br />Value <br />Value $ 1,000.00 <br />65% of <br />Plumbing <br />1.25% <br />of pi <br />1.25% of project <br />Fire Sprinkler Systsmes - Commercial <br />Backflow registration <br />$ <br />10.00 <br />$ 10.00 <br />Plumbing minimum <br />$ <br />50.00 <br />$ 26.25 <br />$ 20.00 <br />Mechanical <br />1.25% <br />of pi <br />1.25% of project <br />Mechanical Minimum <br />$ <br />50.00 <br />$ 26.25 <br />Tent/ Canopy <br />$ <br />50.00 <br />$ 50.00 <br />Municipal Connection permit <br />Sewer <br />$ <br />50.00 <br />$ 50.00 <br />SAC (Sewer Availability Charge) (MCES) <br />######## <br />######## <br />Water <br />$ <br />50.00 <br />$ 50.00 <br />Meter <br />Quote Basi <br />Quote Basis <br />Septic <br />Subdivision site evaluation review <br />$ <br />60.00 <br />$ 60.00 <br />Per lot <br />Inspection surcharge for RS zones (Big and Deering <br />$ <br />30.00 <br />$ 30.00 <br />island <br />plus cost of boat rental <br />if transportation not <br />provided. <br />plus 30/ hour after 1st <br />Reinspection fee <br />$ <br />30.00 <br />$ 30.00 <br />hour <br />Site inspection without permit <br />$ <br />30.00 <br />$ 30.00 <br />Fire Protection inspection <br />$ - <br />$ - <br />Fire Code Permit <br />$ 50.00 <br />$ 50.00 <br />Commercial Fire Alarm <br />Value <br />Value <br />Fire Plan review fee <br />65% of <br />65% of <br />permit fee <br />permit fee <br />Fire Sprinkler Systsmes - Commercial <br />1.25 of <br />contract <br />Burning permits <br />$ - <br />$ - <br />Reinspection <br />$ 20.00 <br />$ 20.00 <br />