|
Temporary Certificate of Occupancy S 10,000.00 3% of project value, not to exceed $10,000
<br />City Administrator may require an erosion control
<br />escrow for projects disturbing soils. $ 1,000.00
<br />Valuation based on ICC 2012 Building Valuation
<br />tables
<br />Total Valuation
<br />Fee
<br />$1.00 to $500
<br />$26.25
<br />$501.00 to $2,000.00
<br />$26.25 for the first $500.00 plus $3.41 for each additional $100.00, or fraction thereof, to
<br />10.00
<br />and including $2,000.00
<br />$2,001.00 to $25,000.00
<br />$77.40 for the first $2,000.00 plus $15.49 for each additional $1,000.00, or fraction
<br />Plumbing minimum
<br />thereof, to and including $25,000.00
<br />$25,001.00 to $50,000.00
<br />$433.67 for the first $25,000.00 plus $11.29 for each additional $1,000.00, or fraction
<br />26.25
<br />thereof, to and including $50,000.00
<br />$50,001.00 to $100,000.00
<br />$715.92 for the first $50,000.00 plus $7.88 for each additional $1,000.00, or fraction
<br />2.00
<br />thereof, to and including $100,000.00
<br />$100,001.00 to $500,000.00
<br />$1109.92 for the fust $100,000.00 plus $6.30 for each additional $1,000.00, or fraction
<br />Mechanical (All Types)
<br />thereof, to and including $500,000.00
<br />$500,001.00 to $1,000,000.00
<br />$3,629.92 for the first $500,000.00 plus $5.25 for each additional $1,000.00, or fraction
<br />Mechanical Minimum
<br />thereof, to and including $1,000,000.00
<br />$1,000,001.00 and up
<br />$6,254.92 for the first $1,000,000.00 plus $4.20 for each additional $1,000.00, or
<br />26.25
<br />fraction thereof
<br />Demolition: Principal structure
<br />Demolition: Accessory structure
<br />Retaining walls
<br />$ 100.00 $ 100.00 $ 1,000.00
<br />$ 50.00 $ 50.00
<br />Based on Value Based on Value
<br />Table Table $ 1,000.00 May require CUP
<br />Plumbing
<br />1.25% of project
<br />1.25% of project
<br />n/a
<br />Backflow registration
<br />$
<br />10.00
<br />$
<br />10.00
<br />Plumbing minimum
<br />$
<br />50.00
<br />$
<br />26.25
<br />Mail -in postage and handling surcharge
<br />$
<br />2.00
<br />$
<br />2.00
<br />Mechanical (All Types)
<br />1.25% of project
<br />1.25% of project
<br />n/a
<br />Mechanical Minimum
<br />$
<br />50.00
<br />$
<br />26.25
<br />Tent/ Canopy
<br />$
<br />50.00
<br />$
<br />50.00
<br />Mail -in postage and handling surcharge
<br />$
<br />2.00
<br />$
<br />2.00
<br />Municipal Connection permit
<br />n/a
<br />Sewer
<br />$
<br />50.00
<br />$
<br />50.00
<br />SAC (Sewer Availability Charge) (MCES)
<br />$
<br />2,485.00
<br />$
<br />2,485.00
<br />Water
<br />$
<br />50.00
<br />$
<br />50.00
<br />Horn
<br />Quote Basis
<br />Quote Basis
<br />Mail -in postage and handling surcharge
<br />$
<br />2.00
<br />$
<br />2.00
<br />Septic
<br />n/a
<br />Residential System Permit, Repair
<br />$
<br />100.00
<br />$
<br />100.00
<br />Residential System Permit, New/ replace
<br />$ 400 +
<br />20 per insp $
<br />460.00
<br />Non -Residential System Permit
<br />$ 200 +
<br />20 per insp $
<br />260.00
<br />Subdivision site evaluation review
<br />$
<br />60.00
<br />$
<br />60.00
<br />Inspection surcharge for RS zones (Big and Deering
<br />$
<br />30.00
<br />$
<br />30.00
<br />island
<br />Reinspection fee
<br />$
<br />30.00
<br />$
<br />30.00
<br />Site inspection without permit
<br />$
<br />30.00
<br />$
<br />30.00
<br />$45.00/per year, plus
<br />$45.00/per year, plus
<br />late fee
<br />plus 8%
<br />late fee
<br />plus 8%
<br />interest
<br />for unpaid
<br />interest
<br />for unpaid
<br />Annual Septic Fee
<br />charges
<br />charges
<br />Septic Late Fee
<br />$
<br />10.00
<br />$
<br />10.00
<br />Contractural Inspection Service
<br />Per lot
<br />plus cost of boat rental if
<br />transportation not
<br />provided.
<br />plus 30/ hour after 1st
<br />hour
<br />
|