Laserfiche WebLink
Temporary Certificate of Occupancy S 10,000.00 3% of project value, not to exceed $10,000 <br />City Administrator may require an erosion control <br />escrow for projects disturbing soils. $ 1,000.00 <br />Valuation based on ICC 2012 Building Valuation <br />tables <br />Total Valuation <br />Fee <br />$1.00 to $500 <br />$26.25 <br />$501.00 to $2,000.00 <br />$26.25 for the first $500.00 plus $3.41 for each additional $100.00, or fraction thereof, to <br />10.00 <br />and including $2,000.00 <br />$2,001.00 to $25,000.00 <br />$77.40 for the first $2,000.00 plus $15.49 for each additional $1,000.00, or fraction <br />Plumbing minimum <br />thereof, to and including $25,000.00 <br />$25,001.00 to $50,000.00 <br />$433.67 for the first $25,000.00 plus $11.29 for each additional $1,000.00, or fraction <br />26.25 <br />thereof, to and including $50,000.00 <br />$50,001.00 to $100,000.00 <br />$715.92 for the first $50,000.00 plus $7.88 for each additional $1,000.00, or fraction <br />2.00 <br />thereof, to and including $100,000.00 <br />$100,001.00 to $500,000.00 <br />$1109.92 for the fust $100,000.00 plus $6.30 for each additional $1,000.00, or fraction <br />Mechanical (All Types) <br />thereof, to and including $500,000.00 <br />$500,001.00 to $1,000,000.00 <br />$3,629.92 for the first $500,000.00 plus $5.25 for each additional $1,000.00, or fraction <br />Mechanical Minimum <br />thereof, to and including $1,000,000.00 <br />$1,000,001.00 and up <br />$6,254.92 for the first $1,000,000.00 plus $4.20 for each additional $1,000.00, or <br />26.25 <br />fraction thereof <br />Demolition: Principal structure <br />Demolition: Accessory structure <br />Retaining walls <br />$ 100.00 $ 100.00 $ 1,000.00 <br />$ 50.00 $ 50.00 <br />Based on Value Based on Value <br />Table Table $ 1,000.00 May require CUP <br />Plumbing <br />1.25% of project <br />1.25% of project <br />n/a <br />Backflow registration <br />$ <br />10.00 <br />$ <br />10.00 <br />Plumbing minimum <br />$ <br />50.00 <br />$ <br />26.25 <br />Mail -in postage and handling surcharge <br />$ <br />2.00 <br />$ <br />2.00 <br />Mechanical (All Types) <br />1.25% of project <br />1.25% of project <br />n/a <br />Mechanical Minimum <br />$ <br />50.00 <br />$ <br />26.25 <br />Tent/ Canopy <br />$ <br />50.00 <br />$ <br />50.00 <br />Mail -in postage and handling surcharge <br />$ <br />2.00 <br />$ <br />2.00 <br />Municipal Connection permit <br />n/a <br />Sewer <br />$ <br />50.00 <br />$ <br />50.00 <br />SAC (Sewer Availability Charge) (MCES) <br />$ <br />2,485.00 <br />$ <br />2,485.00 <br />Water <br />$ <br />50.00 <br />$ <br />50.00 <br />Horn <br />Quote Basis <br />Quote Basis <br />Mail -in postage and handling surcharge <br />$ <br />2.00 <br />$ <br />2.00 <br />Septic <br />n/a <br />Residential System Permit, Repair <br />$ <br />100.00 <br />$ <br />100.00 <br />Residential System Permit, New/ replace <br />$ 400 + <br />20 per insp $ <br />460.00 <br />Non -Residential System Permit <br />$ 200 + <br />20 per insp $ <br />260.00 <br />Subdivision site evaluation review <br />$ <br />60.00 <br />$ <br />60.00 <br />Inspection surcharge for RS zones (Big and Deering <br />$ <br />30.00 <br />$ <br />30.00 <br />island <br />Reinspection fee <br />$ <br />30.00 <br />$ <br />30.00 <br />Site inspection without permit <br />$ <br />30.00 <br />$ <br />30.00 <br />$45.00/per year, plus <br />$45.00/per year, plus <br />late fee <br />plus 8% <br />late fee <br />plus 8% <br />interest <br />for unpaid <br />interest <br />for unpaid <br />Annual Septic Fee <br />charges <br />charges <br />Septic Late Fee <br />$ <br />10.00 <br />$ <br />10.00 <br />Contractural Inspection Service <br />Per lot <br />plus cost of boat rental if <br />transportation not <br />provided. <br />plus 30/ hour after 1st <br />hour <br />