My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: drainage retrofit
Orono
>
Property Files
>
Street Address
>
T
>
Tonkawa Road
>
0645 Tonkawa Road - 05-117-23-33-0019
>
Correspondence
>
Re: drainage retrofit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:14:01 PM
Creation date
5/28/2019 1:13:00 PM
Metadata
Fields
Template:
x Address Old
Address
0645 Tonkawa Rd
Document Type
Correspondence
PIN
0511723330019
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project 1—Upper Catchment Management <br /> PP g <br /> A quick evaluation of topographic data suggests that the majority of the eroded drainageway's j <br /> catchment (local watershed) collects in the large,grassed "bowl" on the site, as well as another <br /> depressional area to the west,which consists of a smaller grassed depression and potentially a <br /> forested wetland. Project 1 entails re-routing the large bowl runoff(which is already collected in a <br /> drainage pipe) into the smaller grassed depression to the west. This can be done by digging a new <br /> drainage path from the large bowl outlet pipe into the smaller grassed depression,lining it with filter <br /> fabric,and overlaying it with small rip-rap (4"-6" diameter). The existing channel should be <br /> abandoned (filled in) to prevent runoff from short-circuiting the depression. The smaller grassed j <br /> depression should be excavated into a flat-bottomed basin (essentially a rain garden),with a cut of <br /> 0.5 to 1.5 feet deep (with the deeper cut on the northern and western edges of the depression). Cut <br /> soil should be used to construct a berm (1 to 2 feet tall) along the southeastern edge of the basin to <br /> retain runoff in the basin. The basin bottom should be,at a minimum,rototilled to provide greater <br /> infiltration. Soil amendments such as sand and compost would also provide greater infiltration, <br /> which will help reduce the time standing water sits in the basin. Optional perforated drain tile (like <br /> the one already located in this area) could be installed to expedite drainage of the basin. Native seed, <br /> plants,and erosion control blanket should be installed in the basin to stabilize soils and to expedite j <br /> water removal. The constructed berm should be compacted, seeded with native plants,and covered <br /> with erosion control blanket. A v-notch weir should be installed along the berm at the point where <br /> water will leave the basin and flow into the existing drainageway. The weir can be constructed from <br /> pressure-treated lumber (allowing for easy modifications later),and should be installed such that it is j <br /> well keyed-in to the berm and ground beneath. The bottom of the v-notch should be approximately <br /> 0.5 feet above the bottom of the basin. Filter fabric,overlain with rip rap (>W' diameter), should be j <br /> installed at the outlet so that water leaving the basin via the v-notch weir does not erode the <br /> drainageway. <br /> I <br /> It may be advantageous to raise slightly(0.5 to 1 foot) the pipe inlet located in the potential forested <br /> wetland (downstream from the constructed basin/weir) so that this wooded area would pond more <br /> water before it was able to flow into the pipe,under the footbridge,and into the well-defined <br /> drainageway. Mounting a flexible plastic section to this pipe inlet and mounting it to a vertical post <br /> would allow for variable water level control in this area. <br /> Important Notes: Jurisdictional wetlands may exist in the area (e.g.,the potential forested wetland); <br /> this can only be determined by a qualified wetland delineator/regulator. Placing fill in a wetland <br /> requires a permit. Construction of a berm and placement of rip rap in a jurisdictional wetland would <br /> be considered fill,but this project may fall within the"de mirnmis" exemption of the Minnesota <br /> Wetland Conservation Act. This issue requires additional investigation,and it would be <br /> advantageous to see if the Minnehaha Creek Watershed District is available to assist in this <br /> determination and assessment of other permit requirements. Also, survey data from a previous <br /> Camp Teko project identifies buried utility lines in the vicinity of this project. Gopher State One <br /> Call (and potentially a private utility locator) should be contacted prior to any digging to mark any j <br /> and all underground utilities prior to any excavation occurring. Regular inspections should be made <br /> after the basin/berm/weir and flexible pipe inlet are installed to ensure that no new <br /> erosion/sedimentation problems are occurring and that impoundment levels and drainage time are <br /> performing acceptably. <br /> I <br /> I <br /> 080529:070908 2 of 4 Camp Teko Drainageway Retrofit—Conceptual Design <br /> I <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.