Laserfiche WebLink
The Building Materials: <br />* Excavate the silt and mud. Export off site. <br />0 Import topsoil (structural) blended and screened with no rocks or sticks. <br />* The three washout areas are 35 x 40. <br />• The geostructural product will be staked deep. See brochure on product. <br />• 7:30 AM start time and 6:00 PM end time in the evening. No weekend work. <br />• Start as soon as possible to gain the growing season for plant root structure. <br />• We will practice minimal traffic impediment as we drop off and pick up <br />equipment. There is room to load trucks at the driveway. <br />• The site is quite private. Normal Skid Steer noise. All new tier 4 equipment <br />deletes any smoke smell. <br />RECEIVED <br />APR 19 2017 <br />GVTY OF ORONO <br />3441 Bluff Drive - Jordan, MN 55352 <br />952-492-5100 - Fax 952-492-5101 # 3939 <br />