My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-12-2017 Council Packet
Orono
>
City Council
>
2017
>
06-12-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 3:05:12 PM
Creation date
5/24/2019 2:54:51 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDAITEM <br />Item No.: 11 Date: June 12, 2017 <br />Item Description: Willow Drive Trail Rehabilitation <br />Presenter: Adam T. Edwards Agenda Consent Agenda <br />Public Works Director/City Engineer Section: <br />1. Purpose. The purpose of this action item is to gain council approval for award of the rehabilitation of <br />the trail that runs along the west side of Willow Drive. <br />2. Background. The rehabilitation of the Willow Drive trail is part of the City Pavement Management <br />plan and is listed for 2017 in the Capital Improvement Plan (CIP). In December of 2016 the council <br />approved Bolton and Menk proposal to conduct surveying and engineering from the project. <br />3. Scope of Work. This project will rehabilitate the 3000 ft of bituminous trail that runs along Willow <br />Drive North. Rehabilitation will include a combination of patching, replacing, and sealing the pavement. <br />4. Cost. Eleven contractors were solicited with two providing quotes. (Exhibit A) The low quote for the <br />pavement rehabilitation was from Omann Bros. for $43,492. In addition to the construction cost, Bolton <br />and Menk provided an estimate for construction oversight. (Exhibit B) <br />Who <br />Work <br />Cost <br />Status <br />Bolton &Menk, Inc <br />Design and Bid Engineering <br />$ 5,500 <br />Not to exceed. <br />Previously approved <br />Omann Bros. <br />Trail Rehabilitation <br />$43,492 <br />Pending approval <br />Bolton &Menk, Inc <br />Construction Oversight <br />$ 5,500 <br />Pending approval <br />TOTAL <br />$54,492 <br />5. Funding. The project will be funded from the Park Fund. <br />Fund <br />Total <br />CIP Estimate <br />Est. End of Year <br />Fund Balance <br />Park Fund <br />$ 54,492 <br />$ 68,900 <br />$594,723 <br />Total <br />$ 54,492 <br />COUNCIL ACTION REQUESTED: <br />Move to award the Brown Road Trail rehabilitation project to Omann Bros for $43,492. In addition to <br />Authorize Bolton and Menk to provide construction oversight services for an amount not to exceed <br />$5,500. <br />Exhibits <br />A. Bid Tab <br />B. Bolton and Menk Construction Proposal <br />Prepared By: �V' <br />Reviewed By: 7E <br />Approved By: W <br />
The URL can be used to link to this page
Your browser does not support the video tag.