My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-12-2017 Council Packet
Orono
>
City Council
>
2017
>
06-12-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 3:05:12 PM
Creation date
5/24/2019 2:54:51 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ORONO <br />PLANNING COMMISSION MEETING <br />Monday, May 15,2017 <br />6:30 o'clock p.m. <br />complement the neighborhood with the proposed improvements. Peterson indicated they are willing to do <br />a significant amount of water mitigation and reduce the hardcover from 34 percent down to 28 percent. <br />Thiesse noted Staff has recommended denial of the deck and the setback. <br />Peterson indicated he is aware of that and that they are looking for a way to get the stairs down the side of <br />the deck. Peterson stated if there is not an option available, then they might not be able to have stairs on <br />the deck. <br />In regards to the denial on the hardcover, Peterson noted there are a number of water mitigation measures <br />that are being proposed. Peterson stated on the west side of the property there was some drain tile <br />installed, which is not draining properly and results in water going into the garage. Peterson stated they <br />are looking to significantly improve the drain tile and have proper water mitigation on both the west and <br />east side. The runoff is going into the neighbor's property currently and they are hoping to improve that. <br />Peterson noted this is a narrow lot and is 40 feet wide, which presents a lot of challenges. Peterson stated <br />he is grateful the neighbors are willing to work with them on the drainage. Peterson stated the water <br />mitigation they are proposing and removal of the hardcover in the 75 -foot zone is why they are asking for <br />a little bit more on the deck. <br />Thiesse asked why there is a jog in the 75 -foot setback line. <br />Peterson stated the surveyor has verified that that is the correct setback and that the shoreline jogs in that <br />area. Peterson commented they are really looking forward to being part of the community. <br />Chair Thiesse opened the public hearing at 8:53 p.m. <br />There were no public comments on this application. <br />Chair Thiesse closed the public hearing at 8:53 p.m. <br />
The URL can be used to link to this page
Your browser does not support the video tag.