My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-12-2017 Council Packet
Orono
>
City Council
>
2017
>
06-12-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 3:05:12 PM
Creation date
5/24/2019 2:54:51 PM
Metadata
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Nola Dickhausen
Created:
5/24/2019 2:59 PM
Modified:
5/24/2019 2:59 PM
Text:
Council Exhibit C #17-3937
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ORONO <br />PLANNING COMMISSION MEETING <br />Monday, May 15,2017 <br />6:30 o'clock p.m. <br />6. 17-3937 Black Bear Builders on behalf of John Brooks, 905 Ferndale Road West, Variance, <br />7:27 P.M. — 7:31 P.M. <br />Stewart Cleveland, Black Bear Builders, and John Brooks, Applicant, were present. <br />Curtis stated the applicant is proposing to construct an approximate 3 x 6 foot concrete pad to support <br />installation of a natural gas fuel generator less than 75 feet from the ordinary high water level at the <br />bottom of the staircase. No hardcover is permitted and structures are not permitted within 75 feet. The <br />structure is also proposed within 30 feet of a potential wetland. The proposal results in an additional 19 <br />square feet of hardcover within the 75 -foot setback. The property is nearly 10 percent below the allowed <br />25 percent hardcover level. <br />The most inconspicuous and logical location for the generator pad is where it is proposed. The generator <br />will be accessed by the existing secondary driveway. Fro the lake, the improvement will be completely <br />screened by the remainder of the property, and at least than three feet tall, it likely will not be visible from <br />the road. <br />Moving the improvement further from the lake to the south would result in locating it in a steep slope <br />likely causing further disturbance. The wetland setback and hardcover variances are supported by the site <br />constraints. <br />Planning Staff recommends approval of the variances. The applicant should confirm the dimensions of <br />the proposed pad since there was a conflict in the plans provided. If the pad increases slightly to conform <br />to the plans, Staff would continue to recommend approval. <br />The Planning Commission had no questions for Staff. <br />Stewart Cleveland, Black Bear Builders, stated he did notice that there was a slightly discrepancy on the <br />size of the pad and that they are proposing the pad to be approximately 4' x 8' to provide a little extra <br />room around the generator. <br />
The URL can be used to link to this page
Your browser does not support the video tag.