Laserfiche WebLink
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, May 8,2017 <br />7:00 o'clock p.m. <br />13. #17-3911 LAKE WEST DEVELOPMENT, LLC, 3245 WAYZATA BOULEVARD WEST, <br />ZONING CODE TEXT AMENDMENT — ALLOW INTERIM/TEMPORARY USES — Continued <br />and possible adoption is attached in the Council's packet as Exhibit A. Secondly, the RR -113 zoning <br />district in which the subject property is located would be amended to include a section entitled Interim <br />Uses similar to the permitted conditional and accessory uses that are located else in zoning code sections. <br />A draft is included in the Council's packet as Exhibit B. The draft incorporates a number of parameters <br />and conditions for the specific use entitled Temporary Facilities for Construction Staging Materials and <br />Equipment Storage and Materials Recycling. <br />hi considering whether the City should adopt an interim use ordinance, the Planning Commission <br />reviewed a number of examples where a temporary use may be reasonable but is not appropriate at a <br />given location on a pennanent basis. The Planning Commission looked at examples found in other <br />Minnesota cities' codes and they are typically tied to a specific zoning district within each of those cities. <br />While there are some consistencies, it also appears that every city has its own ideas of what to regulate via <br />an interim use permit. In some instances cities are using IU?s to regulate activities or uses that Orono has <br />historically regulated as a permitted use or as a conditional use or as an accessory use or even via <br />licensing. <br />The Planning Commission also looked at conditions placed on similar equipment storage and interim use <br />code sections for three other Minnesota cities which allow this use. Changes recommended by the <br />Planning Commission have been incorporated into the ordinance and are outlined in Staff s report. <br />The Planning Commission considered the advantages as well as the disadvantages and some cautions <br />with regard to interim use permits. The advantages include adding the ability to allow for a specified <br />interim use in a specific zoning district, it gives the City and property owner a method or a tool for the <br />temporary use of a property, and it provides an option for properties that are expected to be developed in <br />the future in conformity with the zoning code but for various reasons such future development will not <br />occur immediately, which is the case before the Council tonight. <br />An example of a property is the site at the intersection of County Road 6 and Highway 12. That property <br />operated under a nonconforming use permit as early as 1968. That site was always zoned as single family <br />but it went through a variety of different uses through the years. The building eventually became a <br />daycare center. At some point Mn/DOT determined that property would be needed for the Highway 12 <br />bypass and the daycare use was discontinued. It would be a number of years before that part of the <br />bypass would be constructed, and during that time the City had a variety of inquiries from business <br />people essentially saying they would like to use that building for a few years, such as an insurance office, <br />but the City did not have an interim use ordinance at that time and there was no way that temporary use <br />could be allowed. <br />There are some disadvantages and some cautions with an interim use ordinance. If the Council approves <br />an amendment to the Zoning Code to allow interim uses, the City, the property owners, and the <br />developers will have to be very clear about the parameters for such use. Clear and concise documentation <br />of the allowed land use activities and time periods will be required with each IUP that is issued. To avoid <br />any confusion or misunderstanding, it will be important that all parties know the conditions and time <br />limitations established for the interim use permit. <br />Page 7 of 34 <br />