Laserfiche WebLink
AGENDAITEM <br />Item No.: 6 Date: May 8, 2017 <br />Item Description: Public Works Roof Repairs <br />Presenter: Adam T. Edwards Agenda Public Works Director/ <br />Public Works Director/City Engineer Section: City Engineer's Report <br />1. Purpose. The purpose of this action item is to gain approval to proceed with roofing repairs on the <br />public works building. <br />2. Background. The skylights to Public Works have a long history of leaking. A recent analysis by <br />Mint roofing points to a design issue that allows a buildup of snow and water at the curb of each skylight. <br />In addition the entry way to Public Works is in need of a down spout to prevent erosion damage to the <br />area around the entryway. <br />3. Project Scope. Fabricate/install sheet metal crickets for 6 skylights, caulk side walls of western <br />dormers and install downspout and splash guard block on entryway roof. <br />4. Cost. The City received a not to exceed estimate of $14,560 from Mint Roofing. <br />5. Funding. This project will be divided between the public works related funds: Water, Sewer, Storm, <br />and Streets. <br />6. Staff Recommendation. I recommend that the city council authorize the repair of the public works <br />building roof. <br />COUNCIL ACTION REQUESTED <br />Motion to authorize Mint to repair the public Works building roof for a sum not to exceed $14,560. <br />Exhibits <br />A. Proposal <br />Prepared By: Reviewed By: Approved By: D5R <br />