My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-08-2017 Council Packet
Orono
>
City Council
>
2017
>
05-08-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 2:42:35 PM
Creation date
5/24/2019 2:27:18 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />PLANNING COMMISSION MEETING <br />' M nday, March 20,2017 <br />� 6:30 o'clock p.m. <br />Fretham stated the road contractor is hoping to <br />Fretham stated tabling it to April is fine but tat <br />Schoenzeit seconded the-mdffou. VOTE: <br />0. <br />PC Exhibit D <br />ffff-May would be ideal to get approvals. <br />June or July would be challenging. <br />6. 17-3910 LAIKEWEST, LLC, 3245 WAYZATA BOULEVARD WEST, CONDITIONAL <br />USE PERMIT, 7:17 P.M. — 8:02 P.M. <br />Curt Fretham, Lakewest, LLC, was present. <br />Gaffron stated for the last few months Staff has been receiving inquiries from contractors searching for a <br />staging area for the upcoming highway project. Currently there appear to be few suitable options and this <br />site is an option since it is open and relatively flat, has good accessibility to Wayzata Boulevard, is large <br />enough for the intended activities, and is relatively remote from nearby residential development. The <br />home located across Wayzata Boulevard is 700 feet away and the site is 1,000 feet from any homes across <br />the freeway. <br />The potential negative impacts, such as noise, vibration, glare, dust, should be minimal as compared to <br />most other locations within the Wayzata Boulevard corridor, which is one of the reasons this site was <br />proposed. The portion of the site proposed for construction staging is primarily over the landfill area that <br />has been closed for a number of years, which is the area depicted in blue. Layers of clean fill over the <br />landfill were added by the former owner in order to establish a suitable cap for the landfill and assure <br />appropriate runoff characteristics. <br />The current owners have had borings done in the landfill area in order to determine the stability and <br />extent of the landfill as well as what materials might be encountered if a future phase of residential <br />development is ever proposed. This information was obtained as part of the applicant's 2016. residential <br />development proposal. The information regarding what is contained within the landfill was also <br />contained within that application. The area that gained approval for residential development is not within <br />the landfill area. <br />Page 15 of 64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.