My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-08-2017 Council Packet
Orono
>
City Council
>
2017
>
05-08-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 2:42:35 PM
Creation date
5/24/2019 2:27:18 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Monday, April 17,2017 <br />6:30 o'clock p.m. <br />It was the consensus of the Planning Commission to not allow any other outside materiaJs besides tho!!P,% <br />'40��from the Highway 112 improvement project. <br />Thiesse noted No. 3 deals with hours of operation, noise, lighting, etc. <br />Fretham stated he does not anticipate lighting but that it was put in there in case the contractor wanted it <br />so they did not have to come back. <br />Thiesse stated downcast lighting would be no different than a parking lot. <br />Olson asked what the hours of operation would be. <br />Gaffron indicated Orono's normal construction hours are 7 a.m. to 8 p.m. Monday through Friday and <br />8 a.m. to 8 p.m. on the weekends. <br />Thiesse and Olson indicated they would like Saturday and Sunday to be off. <br />Frethain stated he is fine with that condition as it relates to the crushing activity. <br />Olson commented traffic would be a concern on the weekends. <br />Fretham noted he would like to be able to use the site for storage and that if the contractor is laying pipe <br />on a Saturday and needs one more piece of pipe, it would be nice if he could retrieve it from the site. <br />Fretharn stated it could be limited to no hauling of materials, which would be heavy traffic. <br />Landgraver stated his recollection regarding the concern with the apple orchard is that fall is peak season <br />for them and that he had the understanding the applicant was amenable to restricting traffic on the <br />weekends. <br />Thiesse stated if the contractor is one pipe short of finishing, he cannot see stopping them from getting the <br />pipe. <br />Page 28 of 72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.