My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-08-2017 Council Packet
Orono
>
City Council
>
2017
>
05-08-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 2:42:35 PM
Creation date
5/24/2019 2:27:18 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Conditional Use Permit Application <br />E. Zoning (For Ordinance Text Amendment) <br />The -property is Zb * nod RRAB, One Ramily Rural Residential, and guided for high-densay <br />mult4amily rosiderib.al development. In order to allow the allow the 'Site to be used for staging <br />equipment, stockpiling materials. processing and recyding aggregate and biturriiiious <br />materials, and other construction adbyllies an Ordinance Text Amendment is requeuted. <br />Staging & Recycling <br />The Staging and recycling activities will occupy approximately 5 acres of the total property <br />(see aite plan). Accen to the site will be provided from Wayzata Boulevard (Highway 112 or <br />Old Highway 12) at the location established In the Elsinger Meadows Preliminary Plat. A <br />culvert per county specMcations will be installed and a gravel 4we 9 road at least 24'vdde will <br />be constructed. A temporary rock stabilization pad of 4-W of recycled 3" minus concrete will <br />be constructed to accommodate the re� <br />yding equipment. Two stockpiles, one for raw <br />materials and one fb.r finished materials wfil be located at efther and of the recycling <br />equipment, truck Vvfflo flowing countirclockwiae within the site. Lakewesi is currently working <br />with the MPCA to obtain peffrdsslon to fill an area that will Support a large visual and nolas- <br />screening berm along the westem and southeM borders; as a buffer to Hiqh%vay 12. The <br />proposed berm will later be seeded and landscaped as an amenity for the future development. <br />G. Recyclina & Processinq ODerations <br />The contractor operating the site during the CSAHII 12 PrOjW Will be responsibie for <br />• lndallin'g and maintaining access to the site In accordance with local governing <br />authorities <br />• Furnishing and maintaining erosion contmi devices as specified by local governing <br />aixthorlties; <br />Providing sweeping and dust control services as specified by local governing <br />authorities, County and/o� land owner <br />Providing Mo control as dkected by local municipality and/or County <br />Providing temporary and final turf establishment as required by local governing <br />authorities <br />Main taining a safe and clean construction site as directed by contractor's in-place <br />safety program <br />Establishing hours of operation in conformance with local municipality <br />Establishing a fighting photornetric plan as directed by local municipalKy and/or <br />County (if required) <br />H. Reclamation Plan <br />At the conclusion of the CSAH 112 Project ancl/or other recycling PmJ8CtS, the site will be <br />restored to the same. or better, condition as it is now. The temporaffy rock stabilization pad <br />and stockpilea YAII be removed and thi3 (potential) large perimeter berm will be seeded and <br />landscaped. Eventually the site will be used to create Elsinger Meadowt according to the <br />original vision. <br />FEB 2 12017 CUP — Page 3 of 3 <br />(;"-OF ORONO #3910 <br />
The URL can be used to link to this page
Your browser does not support the video tag.