Laserfiche WebLink
#17-3910 3245 Wayzata Blvd. <br />March 20,2017 <br />Page 4 <br />5, Construction of a proposed permanent screening berm along the south and southwesterly <br />boundaries of the site will require conditional use permit application and approval, <br />6. An annual review of the interim use permit shall be conducted to determine whether the use <br />remains acceptable during the duration of the Wayzata Boulevard improvement project. <br />7. Any other conditions that Planning Commission and Council detennine should be included. <br />