Laserfiche WebLink
SWPPP NARRATIVE - EROSION AND SEDIMENT CONTROL <br />A STORMWATER POLLUTION PREVENTION PLAN (SWFPP) 15 REOUMLS ZRTZ ME ���P IT <br />AI=TID I%AMINIR= AN C U T" <br />550CIATIO-WITH UNDER THE NATIONAL <br />P. <br />PG"�JTAR DISPOSAL SYSTEM (SD5) CONSTRUCTION <br />5 ORMWATER PERMIT FOR THE PROJECT. ALL SITE WORK SHALL FOLLOW THE PERMIT GUIDELINES AND <br />RULES. <br />THE GOAL OF POLLUTION PREVENTION EFFORTS DURING PROJECT CONSTRUCTION IS TO CONTROL SOL AND <br />POLLUTA TS ON THE SITE AND PREVENT THEM FROM LEAVING THE PROUE T SITE AND FLOWING TO SURFACE <br />WATER . THE PURPOSE OF THIS SWPPP IS TO PROVI E GUIDELINES FOR ACHIEVING THAT GOAL. ME SWPPP <br />MUST BE KEPT ONSITE AND UPDATED AS NECESSARY DURING THE COURSE OF CONSTRUCTION TO KEEP IT <br />CURRENT WIN ANY MODIFICATIONS TO THE POLLUMN CONTROL MEASURES BEING UTILIZED. <br />THIS PROJEC CONSISTS OF THE CONSTRUCTION OF A NEW RESIDENTIAL HOUSE AND DRIVEWAY ON LAKE <br />MINNETONKA IN ORONO. MINNESOTA. <br />THE PROPOSED STORMWATER MANAGEMENT DESIGN WILL MEET THE REQUIREMENTS OF THE CITY OF ORONO <br />A D THE M(NNEHAHA CREEK WATERSHED DISTRICT. THIS PROJECT IS NOT REQUIRED TO MEET THE MPCA <br />PERMANENT STORMWATER MANAGEMENT REQUIREMENTS BECAUSE THE INCREASE IN IMPERVIOUS AREA IS LESS <br />THAN ONE ACRE. <br />THE STORM TER MANAGEMENT CONSISTS OF A SERIES OF ROOF DRAINS AND DOWN SPOUTS THAT WILL <br />DISCHARGE TO GRACE AND EXISTING STORM SEWER INFRASTRUCTURE ON-SITE THAT ULTIMATELY CONNECTS To <br />LAKE MINNETONKA. <br />REGULATORY CONTEXT: <br />PAIRED WATER HIN I IL <br />-THIS PROJECT DISCHARGES TO LAXE MINNETONKA (LOWER LAKE NIS WATER BODY IS IDENTIFIED AS <br />AN IMPAIRED WATER ON THE MPCA'S 303(D) IMPAIRED WATERS LIST FOR MERCURY IN FISH. NO <br />ADDITIONAL BMPS ARE REQUIRED FOR COMPLIANCE. <br />_N/A <br />DRINKING WATER SUPPLY MAN <br />-N/A <br />THE PROJECT ST RMWATER DISCHARGE IS NOT ANTICIPATED TO IMPACT MY OF THE FOLLOWING: <br />-OUTSTANDING RESOURCE VALUE WATERS, TROUT WATERS, WETLANDS. CALCAREOUS FENS, PROPERTIES <br />LISTED BY THE NATIONAL REGISTER OF HISTORIC PLACES OR ARCHAEOLOGICAL SITES <br />TH PROJECT STORMWATER DISCHARGE IS NOT SUBJECT TO ADDITIONAL REGULATION DUE TO ANY OF THE <br />FOULOW1 G: <br />-OTHER FORMAL ENVIRONMENTAL REVIEWS, ENDANGERED OR THREATENED SPECIES <br />F1T==I!S "IDENTIFIED BY THE NPDES PERMIT. <br />1 THE OWNER AND CONTRACTOR <br />2. CONTRACTOR SHAL BE RESPONSIBLE FOR ALL ON-SITE IMPL MENTATION OF THE SWPPP, INCLUDING THE <br />ACTIVITIES OF ALL OF THE CONTRACTOR'S SUBCONTRACTORS. <br />3.CONT TOR SHALL PROVIDE A PERSON(S) KNOWLEDGEABLE AND EXPERIENCED IN THE APPLICATION OF <br />EROSI N PREVENTION AND SEDIMENT CONTROL BMPS TO OVERSEE ALL INSTALLATION AND MAINTENANCE OF <br />BIAPS AND IMPLEMENTATION OF THE SWPPP. <br />4. CONTRACTOR SHALL PROVIDE PERSON(S) MEETING THE TRAINING REQUIREMENTS OF THE NPDES PERMIT TO <br />CONDUCT INSPECTION AND MAINTENANCE OF ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPS IN <br />ACC RDANCE WITH THE REQUIREMENTS 0 THE PERMIT. ONE OF THESE INDIVIDUAL(S) MUST BE AVAILABLE <br />FOR AN ONSITE INSPECTION WITHIN 72 HOURS UPON REQUEST BY MPCA. CONTRACTOR SHALL PROVIDE <br />TRAINING DOCUM NTATION FOR THESE INDIVIDLI AS REQUIRED BY THE NPDES PERMIT. THIS TRAINING <br />DO UMENTATION SHALL BE RECORDED IN OR WITH THE SWPPP BEFORE ME START OF CONSTRUCTION OR <br />AS SOON AS THE PERSONNEL FOR ME PROJECT HAVE BEEN DETERMINED. DOCUMENTATION SHALL <br />I CLUDE: <br />.1. NAME OF THE PERSONNEL ASSOCIATED WITH THE PROJECT THAT ME REQUIRED TO BE TRAINED PER <br />PART III.F. I OF THE PER IT. <br />4.2. DATES OF TRAINING AND NAME OF INSTRUCTOR AND EMITY PROVIDING TRAINING. <br />4.3. COWEN OF TRAINING COURSE OR WORKSHOP INCLUDING THE NUMBER OF HOURS OF TRAINING. <br />5. FOLLOWING FINAL STABILIZATION AND THE TERMINATION OF COVERAGE FOR ME NPDES PERMIT, THE OMER <br />IS EXPECTE TO FURNISH LONG TERM OPERATION AND MAINTENANCE (0 & M) OF THE PERMANENT STORM <br />WATER MANAGEMENT SYSTEM. <br />THE FOLLOWING SIZING CRITERIA AIP LY TO THE DESIGN OF STORMINATER TREATMENT FACILITIES. N/A <br />INDICATES NOT APPLICABLE OR NOT CONSTRUCTED AS PART OF THIS PROJECT. <br />1. TEMPORARY SEDIMENTATION BASINS: N/A <br />2 PERMANENT WET SEDIMENTATION BASINS: N/A <br />3. PERMANENT INFILTRATION/FILTRATION : SEE STORMWATER MANAGEMENT PLAN <br />, . PERMANENT REGIONAL PONDS: N/A <br />5. ALTERNATIVE METHODS: N/A <br />TH FOLLOWING SEQUENCE DESCRIBES. IN GENERAL. THE WORK ON THE SITE: <br />I . C NTRACTOR SHALL VERIFY THAT ALL PERMITS HAVE BEEN OBTAINED AND/OR OBTAIN THE NECESSARY <br />P RMITS. <br />2. CONTRACTOR SHAL PERFORM SITE INSPECTIONS, RECORD KEEPING AND RECORD RETENTION IN <br />ACCORDANCE WITH ALL PERMITS. <br />3. C NTRACTOR SHALL INSTALL ALL PERIMETER AND DOWN -GRADIENT EROSION CONTROL AND SEDIMENT <br />C WROL BEST MANAGEMENT PRACTICES (BMPS). CONSTRUCTION ENTRANCES AND INLET PROTECTION <br />0 CES PRIOR TO SITE GRADING, EXCAVATION, STOCKPILING OR DISTURBING EXISTING VEGETATIVE COVER. <br />4. C NTRACTOR SHALL PERFORM SITE GRADING. EXCAVATION, STOCKPILING WORK IN ACCORDANCE WITH THE <br />S ORMWATER POLLUTION PREVENTION PLAIN (swppp). <br />5. C NTRACTOR SHALL INSTALL. INSPECT, MONITOR AND MAINTAIN TEMPORARY AND PERMANENT EROSION <br />CON OL BMPS AS SHOWN ON PLANS & IN CONFORMANCE WRIA NPDES PERMIT, CONTINUOUSLY DURING <br />THE WOW. CONTRACTOR SHALL STABILIZE AL EXPOSED SOILS NO UVER THAN Zj2M AFTER THE <br />C NSTRUCTION ACTIVITY IN THAT POUTON OF THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED. <br />6. CONT TOR SHALL REPLACE OR REPAIR EROSION CONTROL AND SEDIMENT CONTROL BmPs THAT ME NOT <br />FUNC IONING PROPERLY. <br />7. C WRACTOR SHALL PERFORM SITE RESTORATION ACTIVITIES FOR PERMANENT VEGETATIVE ESTABLISHMENT. <br />TL CONTR TOR SHALL REMOVE SEDIMENT CONTROL DEVICES PRIOR TO SUBM17ING NOTICE OF TERMINATION <br />(NOT). <br />9. SUBMIT NOTICE OF TERMINATION TO MPCA WITHIN W DAYS OF FINAL STABILIZATION. <br />1. CONSTRUCT ON ACTIVITY FIELD 9 <br />ALL FIELD REQUI EMENTS SHALL BE PERFORMED IN ACCORDANCE WITH ME REQUIREMENTS OF THE <br />NPDES PERMIT AND STGRMWATER POLLUTION PREVENTION PLAN (swpp). <br />A. ME CONTRAC OR MUST IMPLEMENT THE SWPPP AND PROVIDE BMPS IDENTIFIED IN THE SWPPP IN AN <br />APPROPIRIATE AND FUNCTIONAL MANNER. <br />B. THE CONTRACTOR SHALL RESPOND TO CHANGING SITE CONDITIONS AND IMPLEMENT/SUPPLEMENT <br />EROSION PREVENTION AND SEDIMENT CONTROL MEASURES UTILIZED TO PROVIDE ADEQUATE <br />FROM ION OF DISTURBED SOILS AND ADEO ATE PREVENTION OF SEDIMENT TRANSPORT OFF-SITE. <br />AT A MINIMUM. THE FOLLOWING STORM WATER POLLUTION PREVENTION CONSTRUCTION ACTIVITY FIELD <br />REQUIREMENTS SHALL BE FURNISHED BY THE CONTRACTOR. <br />2, <br />C WRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING EROSION PREVENTION PRACTICES: <br />A. THE CONTRACTOR SHALL ATTEMPT TO PHASE ALL WORK TO MINIMIZE EROSION AND MARRAIN <br />VEG TATIVE COVER TO THE EXTENT POSSIBLE. THE LOCATION OF AREAS NOT TO BE DISTURBED MUST <br />8 DELINEATED ON THE SITE BEFORE CONSTRUCTION BEGINS. <br />B. STABILIZATION ON ALL EXPOSED SOILS MUST BE INITIATED IMMEDIATELY WHENEVER CONSTRUCTION <br />ACTIVITY HAS P RMANENTLY GR TEMPORARILY CEASED ON ANY PORFON OF THE SITE AND WILL NOT <br />RESUME FOR A PERIOD EXCEEDING MR DAYS INCLUDING STOCKPILES WIN = SILT, <br />CLAY OR ORGANIC COMPONENTS. ST MUST BE COMPLETED WITHIN ZSAM <br />C. THE NORMAL WETTED PERIMETER OF MY TEMPORARY OR PERMANENT DRAINAGE DITCH THAT DRAINS <br />WATER MGM A CONSTRUCTION SITE OR DIVERTS WATER MOUND A SITE MUST BE STABILIZED By <br />CON TRACTOR WITHIN 200 FEET FROM THE PROPERTY EDGE, OR FROM THE POINT OF DISCHARGE TO <br />ANY SU FACE WATER WITHIN 24 HOURS OF CONNECTING TO A SURFACE ATER. TEMPORARY OR <br />P RMANEW DITCH SWALES BEING USED AS A SEDIMENT CONTAINMENT SYSTEM DO NOT NEED TO BE <br />STABI IZED UNTIL THEY ARE NO LONGER USED AS A SEDIMENT CONTAINMENT SYSTEM, AFTER WHICH <br />THEY MU T BE STABILIZED WITHIN 24 HOURS. <br />D. TEMPORARY OR PERMANENT ENERGY DISSIPATION AT PIPE OUTLETS MUST BE PROVIDED WITHIN 24 <br />HOURS OF CONNECTING TO A SURFACE WATER. <br />E. THE CONTRACTOR MUST DIRECT DISCHARGES FROM BMPS TO VEGETATED AREAS OF THE SRE IN <br />OR ER TO INCREASE SEDIMENT REMOVAL AND MAXIMIZE INFILTRATION UNLESS INFEASIBLE. THE <br />C WRACTOR MUST UTILIZE VELOCITY DISSIPATION DEVICES IF NECESSARY TO PREVENT EROSION WHEN <br />DIRECTING STORMWATER TO VEGETATED AREAS. <br />CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING SEDIMENT CONTROL PRACTICES: <br />A. CONTRACTOR MUST INSTALL ALL DOWN GRADIENT PERIMETER CONTROLS BEFORE ANY UP GRADIENT <br />DISTURBAN E BEGINS. CONTRACTOR SHALL MAINTAIN PERIMETER CONTROLS UNTIL FINAL STABILIZATION <br />HAS BEEN ESTABLISHED, <br />B. CONTI OR SHALL PROVIDE GRADING AND BMP INSTALLATION TO UNIT ALL SLOPES OF 3H:IV OR <br />ST EPER TO AN UNBROKEN LENGTH OF 75 FEET OR LESS. <br />C. IF DOWN GRADIENT SEDIMENT CONTROLS ME OVERLOADED. THE CONTRACTOR MUST INSTALL <br />ADDITIONAL UPGRADIENT SEDIMENT CONTROL PRACTICES OR REDUNDANT BMPS TO ELIMINATE <br />OVERLOADING. THE SWPPP MUST BE AMENDED TO IDENTIFY THESES ADDITIONAL PRACTICES. <br />D. TIMING AND INSTALLATION OF SEDIMENT CONTROL DEVICES CAN BE ADJUSTED BY CONTRACTOR TO <br />ACCOMMODATE SHORT-TERM ACTIVITIES SUCH AS CLEARING AND GRUBBING OR VEHICLE PASSAGE. ANY <br />SHOW -TERM AC WITY MUST BE COMPLETED AS QUICKLY AS POSSIBLE AND THE SEDIMENT CONTROL <br />PRACTICES MUST BE INSTALLED IMMEDIATELY AFTER THE ACTIVITY IS COMPLETED AND IN ALL CASES <br />PRIOR TO THE NEXT PRECIPITATION EVENT. <br />E. ALL PUBLIC AND PRIVATE STORM SEWER INLETS AND OUTLETS SHALL BE PROTECTED BY CONTRACTOR <br />WITH APPROPRIATE BIAPS DURING THE WORK. THESE PRACTICES SHAL REMAIN IN PEACE UNTIL THE <br />POTENTIAL SOURCES FOR DISCHARGING SEDIMENT TO INLETS HAVE BEEN STABILIZED BY CONTRACTOR. <br />F. TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS. <br />SOIL STOCKPILES SHALL NOT BE PLACED IN SURFACE WATERS OR STORMWATER CONVEYANCES. <br />AC EPTABLE PROTECTION INCLUDES COVER OF MULCH. EROSION CONTROL MATS, OR PLASTIC <br />S EETING. <br />G. ROCK CO STRUCTION ENTRANCES OR EOUNALENT SYSTEM MUST BE INSTALLED By CONTRACTOR TO <br />MINIMIZE TRACKING FROM SITE. CONTRACTOR SHALL PROVIDE STREET SWEEPING AS NECESSARY IF <br />B PS ME NOT ADEQUATE TO PREVENT SEDIMENT FROM BEING TRACKED ONTO THE STREET. <br />H. C NTPACTOR SHALL PROVIDE TEMPORARY SEDIMENTATION BASINS AS REQUIRED BY ME PERMIT. <br />1. CONTRACTO MUST MINIMIZE SOIL COMPACTION AND PRESERVE TOPSOIL, UNLESS INFEASIBLE. <br />MINIMIZING SOIL COMPACTION IS NOT REQUIRED MERE ME FUNCTION OF A SPECIFIC AREA OF THE <br />SITE DICTATES TH T IT BE COMPACTED. <br />j� THE CONTRACTOR MUST PRESERVE A 50 FOOT NATURAL BUFFER OR PROVDE REDUNDANT SEDIMENT <br />CONTR LS WEN A SURFACE WATER IS LO TED WITHIN 50 FEET OF THE PROJECT DISTURBANCE <br />LIMITS AND STORMWATER FLOWS TO THE SURFACE WATER. <br />X. IF P LYMERS. FLOCCULANTS. OR OTHER SEDIMENTATION TREATMENT CHEMICALS ME USED ON SITE. <br />THE GO TRACTOR MUST COMPLY WITH THE FOLLOWING REQUIREMENTS. <br />TH CONTRACTOR MUST USE CONVENTIONAL EROSION AND SEDIMENT CONTROLS PRIOR TO <br />CHEMICAL ADDITION TO ENSURE EFFECTIVE TREATMENT. CHEMICALS MAY ONLY BE APPLIED <br />WHE E TREATED STORMWATER IS DIRECTED TO A SEDIMENT CONTROL SYSTEM WHICH ALLOWS <br />FOR ME SETTLEMENT OF THE FLOC PRIOR TO DISCHARGE. <br />b. CH MICALS MUST BE SELECTED THAT ARE APPROPRIATELY SUITED TO THE TYPES OF SOILS <br />LIKELY TO BE EXPOSED DURING CONSTRUCTION. CHEMICALS MUST BE USED IN ACCORDANCE <br />WITH ACCEPTED ENGINEERING PRACTICES. AND WIN DOSING SPECIFICATION AND SEDIMENT <br />REMOVAL DESIGN SPECIFICATION PROVIDED BY THE MANUFACTURER. <br />4, <br />CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING DEWATERING REQUIREMENTS: <br />A. C WRACTOR'S DEWATERING ACTIVITIE THAT HAVE SEDIMENT -LADEN DISCHARGE WATER MUST BE <br />DISCHARGED INTO A TEMPORARY OR PERMANENT SEDIMENTATION BASIN WHENEVER POSSIBLE, <br />OTHERWISE IT MUST E DISCHARGED THROUGH SOME FORM OF BEST MANAGEMENT PRACTICE (BMP) <br />BY CONTRACTOR To LIMIT SEDIMENT FROM UEMMG THE SITE. PRIOR TO DISCHARGE. THE <br />CON RACTOR SHALL PERFORM A VISUAL TEST TO ENSURE ADEQUATE TREATMENT IS OBTAINED IN THE <br />BASH OR BMP AND APPLY ADDITIONAL TREATMENT AS REQUIRED TO ENSURE ADEQUATE TREATMENT. <br />8. THE CONTRACTO SHALL DISCHARGE WATER FROM DIEWATERING IN A MANNER NAT WES NOT CAUSE <br />NUISANCE CONDITIONS. THE DISCHARGE WATER SHALL BE DISPERSED OVER AN ACCEPT D ENERGY <br />DISSI ATION MEASURE AND NOT ADVERSELY AFFECT THE RECEIVING WATER OR DOWNSTREAM <br />CMDDMERS OR WETLANDS. <br />C. IF CONTRACTOR IS USIN FILTERS WITH BACKWASH WATER. ME CONTRACTOR SHALL HAUL THE <br />BACKWASH WATER AWAY FOR DISPOSAL, RETURN THE BACKWAS WATER TO THE BEGINNING OF THE <br />TREATMENT PROCE S. OR INCORPORATE THE BACKWASH WATER INTO THE SIM IN A MANNER THAT <br />DOES NOT CAUSE EROSION. <br />5, <br />CONTRACTO SHALL BE RESPONSIBLE FOR PERFORMING THE FOLLOWING INSPECTIONS AND MAINTENANCE: <br />A. WHEN INSPECTIONS FIND EROSION PREVENTION AND SEDIMENT CONTROL BIAPS THAT ME <br />NONFUNCTIONAL, ALL NONFUNCTIONAL BMPS MUST BE REPAIRED. REPLACED, OR SUPPL ENTED TH <br />FUNCTIONAL EMIRS WITHIN 24 HOURS AFTER DISCOVERY OR OTHERWISE IN ACCOR CE WRH THE <br />NP ES PERMIT REQUIREMENTS. THE CONTRACTOR SHALL ALSO PLACE ANY ADDR'D = EROSION <br />CON ROL MEASURES DEEMED NECESSARY BY MPCA WITHIN 24 HOURS OF NOTICE FROM MPCA_ <br />8. THE CONTRACTOR MUST ROUTINELY INSPECT THE SITE ONCE EVERY 7 DAYS DURING ACTIVE <br />CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN 24 <br />HOU S. <br />C. ALL INSPECTIONS AND MANTENANCE CONDUCTED DURING CONSTRUCTION MUST BE RECORDED IN <br />WRITING BY CONTRACTOR AND RETAINED WITH THE SWPPIP By CONTRACTOR. MAINTENANCE MUST BE <br />C MPLETED BY CONTRACTOR IN CONFORMANCE WITH NPDES PERMIT. CONTRACTOR'S RECORDS MUST <br />NCLUDE: <br />,. DATE AND TIME OF INSPECTION. <br />b. NAME OF PERSON CONDUCTING INSPECTION. <br />,. FINDING OF INSPECTION INCLUDING RECOMMENDATIONS FOR CORRECTIVE ACTION. <br />d. DETAILS OF CORRECTIVE ACTION TAKEN (DATE- TIME, PARTY COMPLETING MAINTENANCE <br />ACTIVITIES). <br />It. DATE AND MOUNT or RAINI GREATER THAN 0.5 INCHES IN 24 HOURS. <br />I. IF MY DISCHARGE IS OBSERVED TO BE OCCURRING DURING THE INSPECWN. A RECORD OF <br />A L POINTS OF THE PROPERTY FROM WHICH THERE IS A DISCHARGE MUST BE MADE, AND THE <br />DISCHARGE SHALL BE DESCRIBED ICOLOR, ODOR. FLOATING, SETT ED, OR SUSPENDED SOLIDS, <br />FOAM, OIL SHEEN, AND OMER INDICATORS) AND PHOTOGRAPHED. <br />g. DOCUMENTATION OF CHANGES IMAGE TO SWPPP. <br />D� IN AREAS OF PROJECT WHERE FINAL STABILIZATION IS COMPLETE INSPECTIONS CAN BE REDUCED TO <br />ONCE A MONTH. THESE AREAS SHALL BE INSPECTED BY CONTRACTOR FOR MINIMUM PERIOD OF '2 <br />NO -WINTER MONTHS AND WITHIN 24 HOURS OF FIRST SPRING RUNOFF OR PRIOR TO RESUMING <br />CONSTRUCTION FOLLOWING My WINTER STOPPAGE, WHICHEVER COMES FIRST. <br />E� THE CONTRACTOR IS RESPONSIBLE FOR THE INSPECTION AND MAINTENANCE OF EMIRS UNTIL MOTHER <br />P RMITTEE HAS OBTAINED COVERAGE. OR THE PROJECT HAS UNDERGONE FINAL STABILIZATION AND AN <br />NOT HAS BEEN SUBMITTED TO THE MPCA. <br />F. ALL EM ION CONTROL MEASURES MUST BE INSTALLED AND MAINTAINED BY CONTRACTOR ACCORDING <br />TO THE DETAILS INCLUDED IN THE CONSTRUCTION DOCUMENTS AND IN ACCORDANCE WITH THE <br />PRODUCT MANUFACTURER'S RECOMMENDATIONS. <br />G. ALL PERIMETER CONTROL DEVICES MUST BE REPAIRED. REPLACED OR SUPPLEMENTED By THE <br />CONTRACTO WHEN THEY BECOME NON-FUNCTIONAL. OR THE SEDIMENT REACHES ONE-HAUF THE <br />HEGHT OF THE DEVICE. CONTRACTOR SHALL REPAIR OR REPI_AC DEVICE THAT IS NONFUNCTIONAL <br />By THE END OF THE NEXT BUSINESS DAY AFTER DISCOVERY, OR THEREAFTER AS SOON AS FIELD <br />CONDITIONS ALLOW. <br />H. TEMP RARY AND PERMANENT SEDIMENTATION BASINS MUST BE DRAW AND SEDIMENT REMOVED BY <br />CONTRACTOR ONCE THE SEDIMENT COLLECTED REACHES ONE HALF THE STORAGE VOLUME WITH 72 <br />HOURS OF DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW. <br />1. ALL SEDIMENT DEPOSITS WITHIN SURFACE WATERS OR STORMWATER Go ANCES MUST BE REMOVED <br />AND RESTABILIZED BY CONTRACTOR WITHIN 7 DAYS OF DISCOVERY OR SOONER IF IT PRESENTS A <br />FLOW RISK, INCLUDING DELTAS AND STORM SEWER SEDIMENT DEPOSITS. THE CONTRACTOR SHALL <br />B RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED. IF NECESSARY. FOR SUCH SEmmENT <br />REMOVAL. <br />j� CO RACTOR SHALL BE RESPONSIBI. FOR KEEPING EXISTING PAVED SURFACES CLEAN OF SEDIMENT <br />CONSTRUCTION ENTRANCES SHALL BE CHECKED DAILY BY CONTRACTOR. IF THE ENTRANCE BECOMES <br />INUNDATED WITH SEDIMENT, THE ENTRANCE WILL BE CLEANED OR REPLACED AS APPROPRIATE By <br />CONTRACTOR. STREETS LEADING TO AND FROM THE CONSTRUCTION ENTRANCE SHALL BE CHECKED <br />DAILY BY CONTRACTOR FOR OFF-SITE SE IMENT TRACKING ONTO PAVED SURFACES THESE AREAS <br />WILL BE SWEPT C EAN OF ANY TRACKED MATERIALS BY CONTRACTOR AS SOON AS POSSIBLE AND <br />TIRTHIM 24 HOURS OF DISCOVERY AND AS DIRECTED BY THE CITY. CONTRACTOR SHALL EXTEND <br />SWEEPING TO THE EXTREMITY OF ANY SEDIMENT TRACKING THAT OCCURS OFF-SiM. <br />K. CONTRAC OR SHALL BE RESPONSIBLE TO REMOVE MY OFF-SITE SEDIMENT ACCUMULATIONS IN A <br />MANNER AND AT A FREQUENCY SUFFICIENT TO MINIMIZE OFF-SITE IMPACTS. <br />L. ALL INFILTRATION/FILTRATION AREAS MUST BE INSPECTED By CONTRACTOR TO ENSURE THAT NO <br />S DIMENT FROM ONGOING CONSTRUCTION IS ACCUMULATING OVER THE INFILTRATION/FILTRATION AREA. <br />SEDIMENT ACCUMULATED OVER INFILTRATION /RLTRATION MUST BE REMOVED BY CONTRACTOR. <br />M. CONTRACTOR SHALL PROTECT INFILTRATION/FILTRATION AREAS FROM SEDIMENTATION AND <br />OVER -COMPACTION. DURING EXCAVATION. SEDIMENT AND EROSION CONTROL DEVICES MUST BE <br />UTILIZED By CONTRACTOR TO PREVENT SEDIMENRATON AND THE AREA MUST BE STAKED OFF AND <br />MARKED SO THAT HEAVY CONSTRUCTION EQUIPMENT WILL NOT COMPACT THE SOIL. <br />N. INSPECTIONS CAN BE SUSPENDED DUE TO FROZEN GROUND CONDITIONS UNTIL FIRST RUNOFF <br />OCCURS OR CONSTRUCTION ACTIVITIES RESUME. <br />CONTRACTOR SHALL BE RES NSIBLE FOR IMPLEMENTING THE FOLLOWING POLLUTION PREVENTION <br />MANAGEMENT MEASUR S ON THE SITE: <br />A. THE COW TOR SHALL MINIMIZE THE EXP SURE OF ALL PRODUCTS, MATERIALS. AND WASTES FROM <br />STORMWAT R WHICH MAY BE A SOURCE OF CONTAMINATION TO STORMWATER DR ME NOT DESIGNED <br />TO BE EXPOSED TO STORMWATER. <br />B. BUILDING PRODUCTS THAT MAY UEkCH POLLUTANTS MUST BE UNDER COVER (PLASTIC SHEETING, <br />TEMPORARY ROOFS, ETC.) TO PREVENT THE DISCHARGE OF POLLUTANTS OR PROTECTED BY A <br />SIMILARLY EFFECTIVE MEANS DESIGNED TO MINIMIZE CONTACT WITH STORMWATER. <br />C. PESTICIDES, HERBICIDES. INSECTICIDES, FERTILIZERS, TREATMENT CHEMICALS, AND LANDSCAPE <br />MATERIALS MUST BE UNDER COVER (PLASTIC SHEETING. TEMPORARY ROOFS. ETC ) TO PREVENT THE <br />DISCHARGE OF POLLUTANTS OR PROTECTED By A SIMILARLY EFFECTIVE MEANS RSIGNED TO MINIMIZE <br />CONTACT WITH STORMWATER. <br />D. HAZARDOUS MATERIALS, TOXIC WASTE. (INCLUDING OIL, DIESEL FUEL, GASOLINE, HYDRAULIC FLUIDS, <br />PAINT SOLVENTS, PETROLEUM-BASED PRODUCTS, WOOD PRESERVATIVES. ADDITIVES, CURING <br />COMPOUNDS. AND ACIDS) MUST BE STORED IN SEALED CONTAINERS TO PREVENT SPILLS, LEAKS OR <br />OTHER DISCHARGE. RESTRICTED ACCESS STORAGE AREAS MUST BE PROVIDED TO PREVENT VANDALISM. <br />STOWE AND DISPOSAL OF HAZARDOUS MATERIALS MUST COMPLY WITH ALL STATE REQUIREMENTS. <br />E. SOLID WASTE MUST BE STORED, COLLECTED. AND DISPOSED IN COMPLIANCE WITH ALL STATE <br />REQUIREMENTS. <br />F. PORTABLE TOILETS MUST BE POSITIONED SO THAT THEY ARE SECURE AND WILL NOT BE TIPPED OVER. <br />SANITARY WASTE MUST BE DISPOSED OF IN ACCORDANCE WITH ALL STATE REQUIREMENTS. <br />G. THE GO TRACTOR SHALL TAKE REASONABLE STEPS TO PREVENT THE DISCH RGE OF SPILLED OR <br />LEAKED CHEMICALS, INCLUDING FUEL, FROM ALI_ AREAS WHERE CHEMICALS OR FUEL WILL BE LOADED <br />OR UNLOADED. THE CONTRACTOR MUST CONDUCT FUELING IN A CONTAINED ARISA UNLESS INFENSHEILE. <br />THE CONTRACTOR MUST ENS RE ADEQUATE SUPPLIES ME AVAILABLE AT ALL TIMES TO CLEAN UP <br />DISCHAR ED MATERIALS AND THAT AN APPROPRIATE DIS OSAL METHOD IS AVAILABLE FOR RECOVERED <br />SPILLED MATERIALS. ALL SPILLS MUST BE CLEANED UP AND REPORTED IN ACCORDANCE WITH STATE <br />REQUIREMENTS. DRY CLEAN UP MEASURES SHALL BE USED WHERE POSSIBLE. <br />H. THE CONTRACTO MUST UNIT VEHICLE AND EQUIPMENT WASHING TO A DEFINED AR MEN <br />C MPLETED ON ME PROJECT SITE. RUNOFF FROM THE WASHING AREA MUST E CONTAINED IN A <br />SEDIMENT BASIN OR OMER SIMILARLY EFFECTIVE CONTROLS AND WASTE FROM T E WASHING ACTIVITY <br />MUST BE PROPERLY DISPOSED OF. THE CONTRACTOR MUST PROPERLY USE AND STORE SOAPS. <br />DETERGENTS, OR SOLVENTS. NO ENGINE DECREASING IS ALLOWED ONSITE. <br />I THE CONTRACT R MUST PROVIDE EFFECTIVE CONTAINMENT FOR ALL LIQUID AND SOLID WASTES <br />GENERATED BY WASJiOUT OPERATIONS (CONCRETE. STUCCO, PAINT, FORM RELEASE OILS. CURING <br />COMPOV DS. AND OTHER CONSTRUCTION MATERIALS) RELATED TO THE PROJECT CONSTRUCTION <br />ACTIV3Y. NO WASHO T WASTES MAY CONTACT THE GROUND. AND THE CONTAINMENT MUST BE <br />DESIGNED SO THAT IT DOES NOT RESULT IN RUNOFF FROM THE WASHOUT OPERATIONS OR ME <br />LIQUID AND SOLID WASTES MUST BE DISPOSED OF PROPERLY AND IN COMPLIANCE WITH ALL MPCA <br />R LES. A SIGN MUST BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY TH. REQUIRES SITE <br />PERS NNEL TO UTILIZE PROPER FACILITIES FOR DISPOSAL OF CONCRETE AND OTHER WASHOUT <br />WASTES. <br />7. <br />THE CONTRACTOR SHALL ENSURE FINAL STABILIZATION OF THE SITE. FINAL STABILIZATION REQUIRES THE <br />FO LOWING: <br />A. AL SOIL DISTURBING ACTIVRES ME COMPLETE AND A UNIFORM PERENNIAL VEGETATIVE COVER "TH <br />A DE SITY OF 70% OVER THE ENTIRE PERVIO S SURFACE HAS BEEN ACHIEVED, INCLUDING <br />STAGI IZATION OF ALL DITCHES AND SWALES. <br />B. CONTRACTOR SHALL ENSURE THAT ALL PERMANENT STORMWATER TREATMENT SYSTEMS ME <br />CONSTRUCTED IN ACCORDANCE WITH THE REQUIREMENTS OF THE NPDES PERMIT. <br />C� CONTRACTOR SHALL REMOVE ALL TEMPORARY SYNTHETIC AND STRUCTURAL BMPS. <br />-THE CONTRACTOR SHALL MAKE THE SW PP. INCLUDING ALL CERTIFICATES REPORTS. RECORDS, OR OTHER <br />INFORMATION OF THE PERMIT, AVAILABLE TO F DERAIL. STATE. OR LOCAL OFFICIALS WITHIN 72 HOURS UPON <br />R QUEST FOR THE DURATION OF THE PERMIT AND FOR THREE YEARS FOLLOWING THE SUBMITTAL OF THE <br />NOTICE OF TERMINATION. <br />-TH CONTRACTOR SHALL MAKE THE RESPONSIBLE PERSON, TRAINED AS REQUIRED By THIS PERMIT, <br />AVAILABLE ON SITE WITHIN 72 HOURS WHEN REQUESTED BY THE MPCA FOR AN ONSITE INSPECTION. <br />-THE CONTRACTOR MUST ALLOW ACCESS AS REQUIRED BY STATE REGULATIONS FOR REPRESENTATIVES OF <br />THE MPCA OR My MEMBER THEREOF MEN AUTHORIZED BY IT, TO ENTER UPON THE PROJECT SITE FOR <br />THE PURPOSE OF OBTAINING INFORMATION. EXAMINATION OF RECORDS, OR CONDUCTING SURVEYS OR <br />INVESTIGATIONS. <br />-PERMITTE MUST SUBMIT A NOTICE OF TERMINATION (NOT) WITHIN 30 DAYS IF ONE OR MORE OF THE <br />FOLLOWING CONDITIONS HAVE BEEN MET: <br />1. FINAL STABILIZATION HAS BEEN ACHIEVED ON ALL PORTIONS OF THE SITE FOR WHIG PERIAITTEE IS <br />RESPONSIBLE INCLUDING THE REMOVAL OF ALL TEMPORARY MEASURES SUCH AS SILT FENCE. <br />2. MOTHER OMER HAS ASSUMED CONTROL OVER ALL PORTIONS OF ME SITE THAT HAVE NOT ACHIEVED <br />FINAL STABILIZATION. <br />a. Qu&uQLjjD_swp_pe <br />-THE PERM17EE MUST MEND THE SWPPP AS NECESSARY TO INCLUDE ADDITIONAL REQUIREMENTS. SUCH AS <br />ADDITIONAL OR MODIFIED BMPS. DESIGNED TO CORRECT PROBLEMS IDENTIFIED OR ADDRESS SITUATIONS <br />WHENEVER: <br />1. MERE IS A CHANGE IN DESIGN, CONSTRUCTION. OPERATION OR MAINTENANCE. WEATHER OR SEASONAL <br />CO ORIONS THAT HAVE SIGNIFICANT EFFECT ON DISCHARGE- INSPECTION IS REQUIRED WITHIN 24 HOURS <br />OF A RAINFALL EVENT GREATER THAN ONE-HALF INCH. <br />2. INSPECTION OR INVESTIGATION BY SITE OPERATORS, LOCAL, STATE OR FEDERAL OFFICIALS INDICATE THE <br />SWPPP IS NOT EFFECTIVE. <br />3. ME SWPPP IS NOT ACHIEVING THE GENERAL OBJECTIVE OF CONTROLLING POLLUTANTS OR THE swPPP IS <br />NOT CONSISTENT WITH THE TERMS AND CONDITIONS OF THIS PERMIT. <br />4. ME MPCA OETERMINES THAT DISCHARGE MAY CAUSE OR CONTRIBUTE TO NON -ATTAINMENT OF ANY <br />APPLICAB E WATER QUALITY STANDARDS OR THE SWPPP DOES NOT INCORPORATE THE REQUIREMENTS <br />RELATED TO AN APPROVED TOTAL MAXIMUM ONLY LOAD (TMDL). <br />9. 5WRIPE-UMIECAIM; <br />- THIS STORMWATER POLLUTION PREVENTION PLAIN WAS PREPARED BY INDIVDUAI_(S) TRAINED IN <br />ACCORDANCE WITH THE PERMIT'S TRAINING REQUIREMENTS FOR PREPARATION OF SWPPP& IND.DuAL(S) <br />PREPARING THIS SWPPP: <br />PATRICK SVEUM, P.E. <br />RIEKE RINI AND ASSOCIATES <br />PATISPIERCEPINILCOM <br />763-537-1311 <br />TRAIN$NG/CERTIFICATION <br />DATE OF TRAINING/CERTIFICATION: 2016 <br />CERTIFICATION PROGRAM: UNIVERSITY OF MINNESOTA - DESIGN OF CONSTRUCTION SWPPP <br />ARDEN HILLS. MN <br />INSTRUCTOI JOHN CHAIRMAN <br />CERTIFICATION EXPIRATION: 2019 <br />TRAVIS VAN LIERE STUDIO <br />LANDSCAPE ARCHITECTURE <br />211 IST STREET NORN, SURE 3SO <br />INNNEAMUS, MIN SHH <br />1 -7. -1 <br />PIERCE PINI <br />ASSOCIATES <br />9298 CENTRAL AVENUE NE, <br />SUITE 312 <br />BLAINE, MN 55434 <br />TEL 763.537.1311 <br />FAX 763.537.1354 <br />FERNDALE ROAD <br />R E S I D E N C E <br />1895 FERNDALE ROAD W, ORONO, MIN 56391 <br />- d-.. - tN.nI,A1 h..,, d.dN .11 <br />-1-1 ­­, -NP, �p�­.,, th-, <br />X,V­,, ,,d ,1 d�pl­d � <br />--ly .0-,' 1, -1. w. A-1 IN, <br />-P- AS �y III <br />At, ft - <br />0 C�pyng t 2016 T-. Lt.. ftdl.. LUC. All ngHP <br />h -by <br />111yJI-P-1-IdthIll <br />d,,ly <br />I. S_ <br />PATRICK BVBUM <br />IN 11 <br />NOTE; NOT FOR <br />CONSTRUCTION <br />II F. <br />12.. .1B <br />04-B6-7 <br />-.g: <br />SWPPP- NARRATIVE <br />D. By: Rms. <br />U_ ov-017 <br />Sh.: C601 <br />