Laserfiche WebLink
F_ No site work or construction shall commence until the Developer has paid the Storm <br />Water and Drainage Trunk Fee as established in Concept Flan Resolution 5585. The <br />MCES Sewer Availability Charges (SAC) are the responsibility of the Developer and <br />shall be paid to the City at the time of building permit issuance for pass-through to <br />MCES. <br />G. The Developer shall be responsible for obtaining the necessary permits from the <br />regulatory agencies such as the Minnesota Department of Heald'+, MCES, Minnehaha <br />Creep Watershed District, Minnesota DNR, MPCA, and MnDOT. <br />H. The Developer shall report to the City Engineer the location of any drain tiles fotmd <br />during construction. The Developer will comply with the City Engineer's direction <br />as for as abandonment or relocation of the drain tile. <br />I. The Developer shall provide the City with a detailed haul route for review and <br />approval for all material imported or exported from the Property. if the material is to <br />be imported or exported tolfrom another site in {iron, it should be noted that those <br />Other parcels will be required to obtain a land alteration permit, and potentially a <br />conditional use permit from the City. <br />L The Developer shall obtain a temporary construction easement from and establish <br />permanent maintenance agreaments with the owner of the property directly west at <br />2120 Wayzata Boulevard for construction and maintenance of the necessary retaining <br />walls. <br />12. General Conditions. The general conditions of this Agreement are documented in City <br />Council Resolution No. 5f 3 adopted by the City Council on May 14, 2007, which is <br />incorporated herein by reference. Additional conditions of approval are attached hereto <br />as Exhibit B. <br />Developer Initial <br />City Clerk Initial <br />Page 7 of 9 <br />