Laserfiche WebLink
PROJECT: RINGERWOOD L1 B2 <br />LOCATION: ORONO, MINNESOTA Engineers Estimate <br />PREPARED FOR: GONYEA HOMES, INC. <br />PREPARED BY: SATHRE-BERGQUIST, INC. <br />Unit Count 1 <br />DATE: FEBRUARY 16, 2017 <br />REVISED: <br />Estimated <br />Unit <br />Bid <br />Description <br />Unit <br />Quantity <br />Price <br />Amount <br />Mobilization - Utility <br />L.S. <br />1.0 <br />$2,500.00 <br />$2,500.00 <br />Permits & Bonds <br />L.S. <br />1.0 <br />$1,000.00 <br />$1,000.00 <br />8" PVC SDR 35 0-15' <br />L. F. <br />420.0 <br />$35.00 <br />$14,700.00 <br />10" SDR 11 IPS (Boring under Willow Drive) <br />L. F. <br />85.0 <br />$80.00 <br />$6,800.00 <br />Manhole 0-8' <br />EACH <br />2.0 <br />$2,500.00 <br />$5,000.00 <br />Furnish & Install Castings <br />EACH <br />2.0 <br />$550.00 <br />$1,100.00 <br />8" x 4" Wyes (SCH. 40) <br />EACH <br />1.0 <br />$125.00 <br />$125.00 <br />4" PVC Service (SCH. 40) <br />EACH <br />1.0 <br />$600.00 <br />$600.00 <br />PVC Cleanout <br />EACH <br />1.0 <br />$300.00 <br />$300.00 <br />8" Boot w/Plug <br />EACH <br />1.0 <br />$150.00 <br />$150.00 <br />Improved Pipe Fndtn <br />L. F. <br />420.0 <br />$5.00 <br />$2,100.00 <br />Televise <br />L. F. <br />505.0 <br />$1.50 <br />$757.50 <br />Connect to Existing (Core Drill) <br />EACH <br />1.0 <br />$2,500.00 <br />$2,500.00 <br />Insulate (4x8x2 Sheets, 2sheets) <br />L. F. <br />0.0 <br />$25.00 <br />$0.00 <br />Exterior Manhole Joint Wrap <br />L.S. <br />0.0 <br />$2,500.00 <br />$0.00 <br />Sanitary Sewer Total: <br />$37,632.50 <br />