My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-09-2018 Council Packet
Orono
>
City Council
>
2018
>
07-09-2018 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 12:33:14 PM
Creation date
5/24/2019 12:26:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
sting steps <br />try <br />937 / <br />( ?OPOSED SrLT FENCi <br />' -ACED BETWEEN TW <br />1D THE LAKE AN`r1MH <br />PON IS TO TAKE PLAC <br />/75' OHW setback <br />No real access walk exists to the front door of the house. Some re- <br />claimed hexagonal pavers provide limited steps. <br />The path is designed as a 4 foot wide walk to a new landing at the base <br />of the stairs. the path and the landing would be a hardcover such as <br />clay brick pavers or similar. <br />The landing is beyond the 75' setback. <br />the new walk will provide a solid surface for access to the front door <br />of the house. This will serve to assist the homeowner, but also provide <br />emergency services safe and direct access to the building as well. <br />The path is 55'- 7" long by 4' wide <br />__1r <br />' 6& AC <br />ROOF PEAK <br />ELEV.- <br />972.9 <br />LEV.-97 .9 Ev i BASEMENT r% <br />,:2¢ FLOOR <br />Q` ELEV.-937.29 <br />1 QIP' ICI AAIri A <br />9' CEDAJ <br />'f�' y 0 <br />studio � Entry Walk <br />TSU KE Big Island Landscape Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.