Preliminary Plat Application 18-3999 <br />Southways Addition <br />Page 2 <br />6835 <br />adequate storage is provided. <br />d. A minimum 8' wide access bench along the top of the berm should be provided all the way <br />around the pond to allow for inspection of outlets and future maintenance. <br />e. The stormwater management plan should be revised as necessary to meet all requirements <br />and resubmitted for review prior to Final Plat approval to ensure adequate siting is <br />available for required facilities. <br />1.2 The condition of Rracketts Point Road to remain should be reviewed by the City and Contractor <br />prior to any work, and the existing condition should be documented with pictures. After <br />completion of work, the street should be reviewed for damage, and the Contractor should be <br />required to repair any damage deemed to be caused by site work. <br />1.3 Work within public right-of-way must be coordinated with the Public Works Department. <br />Contractor must provide a minimum 48 hour notice prior to any work being performed. Notes <br />should be revised accordingly. <br />1.4 Final Plans must include a Storm Water Pollution Prevention Plan (SWPPP) that meets NPDES <br />requirements. The plan should include a rock construction entrance, perimeter silt fence, inlet <br />protection, and ditch checks in swales. For specific requirements, refer to the following link: <br />https://www.i)ca.state.mn.us/sites/default/files wq-strin2-68a.pdf <br />1.5 A Demolition/Removals Plans should be included with Final Plans to ensure items slated for <br />demolition are removed as proposed and required. The Removals Plans should include items <br />north and south of the site to make the street connections. <br />1.6 Per the meeting of December 20"' with the City, it is the City's understanding that the developer <br />wishes to install a pressure system with lift station in lieu of what is depicted in the current plan <br />set. A revised sanitary sewer plan must be submitted for review prior to final development <br />approval. The plat should be revised to provide sufficient room for the lift station; including <br />wet well, control panel and back-up generator; via the road ROW or a utility easement. The <br />final design must conform to City standards and should include all pertinent City details. <br />1.7 The development will require the city to increase the capacity of Lift Station #9 which receives <br />the sewage from the development area. The lift station is being remodeled/ rehabilitated this <br />coming year. Larger pumps sized to handle the increased demand from the development is <br />expected to add $1000 to the lift station projected. That difference should be borne by the <br />developer. <br />1.8 For the sewer line designated to be abandoned all pipes must be removed or filled such that no <br />subsurface voids remain. For sanitary manholes designated to be abandoned, the covers, rings, <br />castings and any other structure must be removed to a minimum of 4 feet below the <br />surface. The remaining structure must be backfilled to ensure no subsurface voids. This work <br />should be indicated on the Final Removals Plan. <br />1.9 The applicant will be required to obtain Minnehaha Creek Watershed District (MCWD) <br />approval and permitting. A copy of any approvals or permits required should be submitted <br />prior to Final Plat approval. <br />1.10 The applicant will be required to obtain a General Construction Permit (NPDES) to discharge <br />stormwater associated with construction activity since more than I acre will be disturbed. A <br />copy of the permit should be submitted prior to any land disturbing activity. <br />1.11 The applicant will be required to obtain a Sanitary Sewer Extension permit from the Minnesota <br />Pollution Control Agency. A final copy of the permit should be submitted prior to <br />construction. <br />1.12 The applicant will be required to submit a Maintenance Agreement for all stormwater <br />management structures and facilities. The agreement should define maintenance <br />responsibilities following completion of project, specify types and frequencies of inspection <br />H:\ORNO\C13115486\z-18-3999_BmckePs Point\Sauthw ys ?mPlatReview-1_2018-01-09.docx <br />Bolton & Menk is an <br />