My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-11-2018 Council Packet
Orono
>
City Council
>
2018
>
06-11-2018 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 12:25:15 PM
Creation date
5/24/2019 11:50:51 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO. 6835 <br />9. Violation of or non-compliance with any of the terms and conditions of this <br />resolution may result in the termination of any authority granted herein. <br />C. Plans and Specifications. The following plans and specifications shall be submitted <br />for review and approval by the City and other appropriate jurisdictions: <br />1) Final plans and specifications for all proposed utility lines and services, including <br />any proposed revisions to existing service facilities. Proposed plans shall be <br />provided to the City for final review and approval with the Final Plan set. The <br />Public Works Department and any other pertinent reviewing agencies shall <br />review and approve all utility improvements. Final sanitary sewer and watermain <br />plans shall be provided and are subject to approval by the Public Works <br />Department and City Engineer. <br />2) Final Street and Storm Sewer Plans. <br />3) Final Grading, Drainage and Erosion Control Plan and SWPPP showing existing <br />and proposed contours, building locations, elevations, stormwater facilities and <br />calculations, utilities and erosion control measures to be used during construction. <br />General Development Plan Approval will not be granted until the Minnehaha <br />Creek Watershed District has approved the stormwater plans. <br />4) Landscaping plan to reflect a more natural pattern of replacement trees, versus a <br />lineal replacement pattern along the new Bracketts Point <br />5) Any additional plans and specifications deemed necessary by the City as review <br />progresses. <br />D. Platting Process. Applicant shall complete all requirements for Final Plat Approval as <br />follows. The following list of final submittals must be submitted to the City <br />Administrator 2 weeks prior to the regularly scheduled Council meeting on the second <br />and fourth Mondays of the month. These submittals are as follows: <br />1). Record plat drawings in the form of two (3) mylar copies (one copy for the City's <br />records and one for filing with Hennepin County) and one (1) copy reduced to 1" _ <br />200'. Drawing to include: <br />
The URL can be used to link to this page
Your browser does not support the video tag.