Laserfiche WebLink
attached hereto, from all parties who have an interest in the Land; that there are no unrecorded <br />interests in the Land; and that the Developer will indemnify and hold the City harmless for any <br />breach of the foregoing covenants. <br />I. Each right, power or remedy herein conferred upon the City is cumulative <br />and in addition to every other right, power or remedy, express or implied, now or hereafter <br />arising, available to the City, at law or in equity, or under any other agreement, and each and <br />every right, power and remedy herein set forth or otherwise so existing may be exercised from <br />time to time as often and in such order as may be deemed expedient by the City and shall not be a <br />waiver of the right to exercise at any time thereafter any other right, power or remedy. <br />J. The Developer may not assign this Contract without the written permission <br />of the City Council. The Developer's obligations hereunder shall continue in full force and effect <br />even if the Developer sells one or more lots in the Plat, the Land, or any part of it. Upon request, <br />the City shall provide, in recordable form, a release of any lot in the Plat from this Development <br />Contract if the City determines that the teams and conditions of this Contract have been satisfied. <br />K Developer shall be responsible for all snow removal from vacant lots to <br />the extent that City Ordinance requires snow removal. Developer shall be responsible for <br />ensuring that all vacant lots comply with the City's Code regarding nuisances. <br />L. Retaining walls that require a building permit shall be constructed in <br />accordance with plans and specifications prepared by a structural or geotechnical engineer <br />licensed by the State of Minnesota. Following construction, a certification signed by the design <br />engineer shall be filed with the City Engineer evidencing that the retaining wall was constructed <br />in accordance with the approved plans and specifications. All retaining walls required to be <br />constructed by the Plans, or special conditions referred to in this Contract, shall be constructed <br />16 <br />Southways V3 <br />