My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-11-2018 Council Packet
Orono
>
City Council
>
2018
>
06-11-2018 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 12:25:15 PM
Creation date
5/24/2019 11:50:51 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
L. Stormwater Easement. Developer shall show on the final plat an easement <br />over the planned stormwater facility improvements. <br />M. The Final Plat will dedicate to the City a drainage and utility easement over <br />all existing City utilities on the Land. Alternatively, before the City signs the Plat, the Developer <br />shall provide the City with an appropriately executed drainage and utilities easement, in <br />recordable form, over all existing City utilities on the Land. <br />N. Orono Resolution 6821 contained a number of conditions applicable to the <br />development of the project: <br />a. Final plat approval <br />b. Approval for all permits related to the MCWD <br />c. Applicant shall receive approval from the DNR Commission prior to <br />received land alteration permit <br />d. WCA Approval <br />e. No parking on Ivy Place at any time <br />f. Beach Improvements stall be limited to the project scope. <br />g. A review of the road condition must be done before and after <br />construction, any damage will be repaired by developer. <br />h. Hauling hours are limited to 7:30-3:00pm and 4:00pm-8:00pm while <br />Westonka schools are in session. <br />i. Application shall confirm the location of the delineated wetland before <br />install of the driveway <br />O. Orono Public works will inspect the condition of Ivy Place prior to construction and any <br />damage observed during the course of development of the project, including house construction <br />will be repaired at the Developers expense. <br />25. SUMMARY OF SECURITY REQUIREMENTS. To guarantee compliance <br />with the terms of this Contract, payment of the costs of all Improvements and construction of all <br />Improvements, the Developer shall furnish the City with a letter of credit, in the form attached <br />10 <br />Ivy Place Development Contract <br />
The URL can be used to link to this page
Your browser does not support the video tag.