Laserfiche WebLink
CONSTRUCTION LIMITS <br />Or -929.4 contour - <br />�I----------- <br />�i' , �.� ♦♦ GUTTER REAR HALF OF HOUSES <br />TO AREA DRAIN AND PIPE INTO <br />` UNDERGROUND SYSTEM, TYP. <br />♦ <br />COORD. LOCATION OF <br />DOWNSPOUT CONNECTIONS W/ <br />7 <br />♦v : w' sho ARCH PRIOR TO CONSTRUCTION. <br />UNDERGROUND STORMWATER PROVIDE POSITIVE SLOPE ON ALL <br />DETENTION SYSTEM 2 �\ PVC CONNECTIONS TO <br />12" PERF. CMP \ ♦ UNDERGROUND SYSTEMS <br />(2) HEADERS ��\` <br />12" SIDE & END STONE, <br />12" STONE PIPE SEPARATION <br />6" STONE COVER <br />' r FOOTPRINT=17.0'x64.0' <br />IE 12" CMP=930.00 <br />N`� MH OE 2" ORIFICE=930.00 % <br />< Top 931.24 OE 6" ORIFICE=930.40 <br />Inv. 9.80 S \ Inv. 92121.24 w OE 6" ORIFICE=930.50 � ` ♦ <br />\ TOP 12" CMP=931.00 <br />TOP STONE=931.50 \ \ ♦♦ <br />100 -YR HWL=931.38 <br />54LF 11 <br />\ CONNECT TO EXISTIN STORM @ <br />SANITARY STUB�`���`���`�� <br />CONTRACTOR TO VERIFY <br />LOCATION, SIZE, AND <br />� ELEVATION OF EXISTIN <br />SANITARY SERVICE. REP T <br />FINDINGS TO ENGINEER <br />22LF 2" PVC <br />CONSTRUCTION LIMITSO ° i <br />, OO STORM @ 1.05% <br />O 22LF 6"x2 PVC <br />OO STORM @ 3.32%, / <br />\ OO 2.86% <br />�. STUB 2" WAT / <br />SERVICE TO WITHIN 5' 2 2" PVC / �< <br />FROM HOUSE OO STORMM @ 0.79% / y <br />♦ 26, <br />STUB 2" WATER <br />♦ <br />♦ O SERVICE TO WITHI <br />O <br />FROM HOUSE <br />r\� � <br />♦ <br />r <br />1 , I <br />1i <br />1� 1 e• I 2" COPPER WATER . i SERVICE. COORDIN <br />SIZING W/ MECHANI <br />WET TAP (2) SERVICES 1 CO DESIGNING IN HOU; <br />TO EXISTING WATER �i SPRINKLER SYSTEM <br />STUB. COORDINATE W/ PRI : R TO CONSTRL <br />CITY - <br />fr <br />lop 932.10 <br />Inv. 927.20 � <br />Found Spike- <br />0 <br />Most westerly corner of Lot <br />185 TAYLOR'S SUBDIVISION <br />Hyd. <br />OF SPRING PARK LOTS \\ : <br />Most southerly corner of Lot <br />185, TAYLOR'S SUBDIVISION ----------- f \\ <br />OF SPRING PARK LOTS <br />COOR TO VERIFY <br />OCA41N SIZE, AND <br />ELEVATION OF EXISTING <br />WATER SERVICE. REPORT <br />FINDINGS TO ENGINEER <br />/ <br />/ <br />`5,1- �/� <br />js <br />c92 0 <br />.(9& !�k <br />(3) ACCESS RISER, TYP. /10a_ <br />12" SLOTTED GRATE TO ALLO1�f� <br />INFLOW, TYP. <br />HDPE FES 1 4- <br />I E=±929.50 •/ <br />RIPRAP TO NWL <br />INSTALL NON -RETURN VALVE TO <br />DISALLOW LAKE/FLOOD WATER FROM <br />ENTERING SYSTEM. <br />,INSTALL CONCRETE HEADWALL AND <br />NDENT GUARD PER MANUF. SPECS. <br />PROVIDE CLAY LINER <br />♦ BENEATH AND ON SIDES <br />♦ OFUNDERGROUND <br />4 1'' FILTRATION SYSTEMS, TYP. <br />41 <br />R <br />- CONFECT TO EXISTING <br />SANITARY STUB <br />CONTRACTOR TO VERIFY <br />LOCATION, SIZE, AND <br />ELEVATION OF EXISTING <br />SANITARY SERVICE. REPORT <br />FINDINGS TO ENGINEER <br />(3) ACCESS RISER, TYP. <br />12" SLOTTED GRATE TO ALLOW <br />INFLOW, TYP. <br />- UNDERGROUND STORMWATER <br />DETENTION SYSTEM 1 <br />12" PERF. CMP <br />J(g�HEADERS <br />1 SIDE & END STONE, <br />12" STONE PIPE SEPARATION <br />6" STONE COVER <br />FOOTPRINT=11.0'x64.0' <br />IE 12" CMP=930.00 <br />OE 2" ORIFICE=930.00 <br />OE (x2) 4" ORIFICE=930.25 <br />TOP 12" CMP=931.00 <br />TOP STONE=931.50 <br />100 -YR HWL=931.47 <br />CITY OF ORONO UTILITY NOTES: <br />1. TELEVISE EXISTING SANITARY SEWER MAIN AND REPORT FINDINGS TO <br />ENGINEER PRIOR TO CONSTRUCTION. <br />2. ONCE SANITARY SEWER STUBS ARE EXPOSED AND LOCATION, SIZE, AND <br />ELEVATION ARE FIELD VERIFIED, LAYOUT AND DESIGN OF SERVICE <br />CONNECTION SHOULD BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL <br />PRIOR TO CONSTRUCTION. <br />3. THE CONSTRUCTION OF THE UNDERGROUND STORMWATER MANAGEMENT <br />SYSTEM SHOULD BE OBSERVED BY THE CITY TO ENSURE IT IS INSTALLED AS <br />PROPOSED. THE CONTRACTOR MUST DOCUMENT THE INSTALLATION WITH <br />PICTURES TO PROVIDE A GRAPHIC RECORD. <br />GENERAL UTILITY NOTES: <br />1. SEE SITE PLAN FOR HORIZONTAL DIMENSIONS AND LAYOUT. <br />2. CONTRACTOR SHALL FIELD VERIFY LOCATION AND ELEVATION OF EXISTING UTILITIES AND <br />TOPOGRAPHIC FEATURES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL IMMEDIATELY <br />NOTIFY THE ENGINEER OF DISCREPANCIES OR VARIATIONS FROM THE PLANS. <br />3. ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE <br />CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO <br />CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILTIES THAT ARE <br />DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. <br />4. UTILITY INSTALLATION SHALL CONFORM TO THE CURRENT EDITION OF "STANDARD <br />SPECIFICATIONS FOR WATER MAIN AND SERVICE LINE INSTALLATION" AND "SANITARY SEWER AND <br />STORM SEWER INSTALLATION" AS PREPARED BY THE CITY ENGINEERS ASSOCIATION OF <br />MINNESOTA (CEAM), AND SHALL CONFORM WITH THE REQUIREMENTS OF THE CITY AND THE <br />PROJECT SPECIFICATIONS. <br />5. CASTINGS SHALL BE SALVAGED FROM STRUCTURE REMOVALS AND RE -USED OR PLACED AT THE <br />DIRECTION OF THE OWNER. <br />6. ALL WATER PIPE SHALL BE CLASS 52 DUCTILE IRON PIPE (DIP) UNLESS OTHERWISE NOTED, <br />7. ALL SANITARY SEWER SHALL BE SDR 26 POLYVINYL CHLORIDE (PVC) UNLESS OTHERWISE NOTED. <br />8. ALL STORM SEWER PIPE SHALL BE HDPE UNLESS OTHERWISE NOTED. <br />9. PIPE LENGTHS SHOWN ARE FROM CENTER TO CENTER OF STRUCTURE OR TO END OF FLARED <br />END SECTION. <br />10. UTILTIES ON THE PLAN ARE SHOWN TO WITHIN SOF THE BUILDING FOOTPRINT. THE <br />CONTRACTOR IS ULTIMATELY RESPONSIBLE FOR THE FINAL CONNECTION TO BUILDING LINES. <br />COORDINATE WITH ARCHITECTURAL AND MECHANICAL PLANS. <br />11. CATCH BASINS AND MANHOLES IN PAVED AREAS SHALL BE SUMPED 0.04 FEET. ALL CATCH <br />BASINS IN GUTTERS SHALL BE SUMPED 0.15 FEET PER DETAILS. RIM ELEVATIONS SHOWN ON THIS <br />PLAN DO NOT REFLECT SUMPED ELEVATIONS. <br />12. ALL FIRE HYDRANTS SHALL BE LOCATED 5 FEET BEHIND BACK OF CURB UNLESS OTHERWISE <br />NOTED. <br />13. HYDRANT TYPE, VALVE, AND CONNECTION SHALL BE IN ACCORDANCE WITH CITY REQUIREMENTS. <br />HYDRANT EXTENSIONS ARE INCIDENTAL. <br />14. A MINIMUM OF 8 FEET OF COVER IS REQUIRED OVER ALL WATERMAIN, UNLESS OTHERWISE <br />NOTED. EXTRA DEPTH MAY BE REQUIRED TO MAINTAIN A MINIMUM OF 18" VERTICAL <br />SEPARATION TO SANITARY OR STORM SEWER LINES. EXTRA DEPTH WATERMAIN IS INCIDENTAL. <br />15. A MINIMUM OF 18 INCHES OF VERTICAL SEPARATION AND 10 FEET OF HORIZONTAL SEPARATION <br />IS REQUIRED FOR ALL UTILITIES, UNLESS OTHERWISE NOTED. <br />16. ALL CONNECTIONS TO EXISTING UTILITIES SHALL BE IN ACCORDANCE WITH CITY STANDARDS AND <br />COORDINATED WITH THE CITY PRIOR TO CONSTRUCTION. <br />17. CONNECTIONS TO EXISTING STRUCUTRES SHALL BE CORE -DRILLED. <br />18. COORDINATE LOCATIONS AND SIZES OF SERVICE CONNECTIONS WITH THE MECHANICAL <br />DRAWINGS. <br />19. COORDINATE INSTALLATION AND SCHEDULING OF THE INSTALLATION OF UTILITIES WITH <br />ADJACENT CONTRACTORS AND CITY STAFF. <br />20. ALL STREET REPAIRS AND PATCHING SHALL BE PERFORMED PER THE REQUIREMENTS OF THE <br />CITY. ALL PAVEMENT CONNECTIONS SHALL BE SAWCUT. ALL TRAFFIC CONTROLS SHALL BE <br />PROVIDED BY THE CONTRACTOR AND SHALL BE ESTABLISHED PER THE REQUIREMENTS OF THE <br />MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MMUTCD) AND THE CITY. THIS <br />SHALL INCLUDE BUT NOT BE LIMITED TO SIGNAGE, BARRICADES, FLASHERS, AND FLAGGERS AS <br />NEEDED. ALL PUBLIC STREETS SHALL BE OPEN TO TRAFFIC AT ALL TIMES. NO ROAD CLOSURES <br />SHALL BE PERMITTED WITHOUT APPROVAL BY THE CITY. <br />21. ALL STRUCTURES, PUBLIC AND PRIVATE, SHALL BE ADJUSTED TO PROPOSED GRADES WHERE <br />REQUIRED. THE REQUIREMENTS OF ALL OWNERS MUST BE COMPLIED WITH. STRUCTURES BEING <br />RESET TO PAVED AREAS MUST MEET OWNERS REQUIREMENTS FOR TRAFFIC LOADING. <br />22. CONTRACTOR SHALL CORDINATE ALL WORK WITH PRIVATE UTILITY COMPANIES. <br />23. CONTRACTOR SHALL COORDINATE CONNECTION OF IRRIGATION SERVICE TO UTILITIES. <br />COORDINATE THE INSTALLATION OF IRRIGATION SLEEVES NECESSARY AS TO NOT IMPACT <br />INSTALLATION OF UTILITIES. <br />24. CONTRACTOR SHALL MAINTAIN AS -BUILT PLANS THROUGHOUT CONSTRUCTION AND SUBMIT <br />THESE PLANS TO ENGINEER UPON COMPLETION OF WORK. <br />25. ALL JOINTS AND CONNECTIONS IN STORM SEWER SYSTEM SHALL BE GASTIGHT OR WATERTIGHT. <br />APPROVED RESILIENT RUBBER JOINTS MUST BE USED TO MAKE WATERTIGHT CONNECTIONS TO <br />MANHOLES, CATCHBASINS, OR OTHER STRUCTURES. <br />26. ALL PORTIONS OF THE STORM SEWER SYSTEM LOCATED WITHIN 10 FEET OF THE BUILDING OR <br />WATER SERVICE LINE MUST BE TESTED IN ACCORDANCE WITH MN RULES, CHAPTER 4714, <br />SECTION 1109.0. <br />GRADING FLOODPLAIN NOTES (CITY & WATERSHED): <br />1. FILLING IN THE FLOODPLAIN WILL BE MITIGATED ON SITE AT A 1:1 VOLUME <br />RAT 10. <br />2. PER CITY OF ORONO RULES, THE LOW FLOOR ELEVATION (LFE) OF PROPOSED <br />STRUCTURES MUST BE 932.5 OR HIGHER. <br />3. PER MINNEHAHA CREEK WATERSHED DISTRICT RULES, THE LOW OPENING OF <br />PROPOSED STRUCTURES MUST BE 933.5 OR HIGHER. <br />UTILITY LEGEND: <br />• CATCH BASIN <br />m MANHOLE <br />►� GATE VALVE AND VALVE BOX <br />PROPOSED FIRE HYDRANT <br />WATER MAIN <br />SANITARY SEWER <br />>> STORM SEWER <br />> ----- () PVC STORM SEWER <br />FES AND RIP RAP <br />GOPHER STATE ONE CALL A' <br />WWW.GOPHERSTATEONECALL.ORG I \1 <br />(800) 252-1166 TOLL FREE ���111 <br />(651) 454-0002 LOCAL <br />O1 " = 30'-0" <br />15-0" 0 30'-0" <br />C�' <br />7H, <br />0 <br />R <br />4931 W. 35TH ST. SUITE 200 <br />ST. LOUIS PARK, MN 55416 <br />CivilSiteGroup.com <br />Matt Pavek <br />763-213-3944 <br />Pat Sarver <br />952-250-2003 <br />LAKE', IIIA <br />DEVELOPMENT, LLE <br />LO <br />J co <br />J Lr) <br />L0 <br />z <br />z Y <br />W z <br />0 <br />a LU <br />Oz <br />J 2i <br />W <br />O <br />>lt <br />N <br />W Lu <br />U) <br />C/) <br />W a <br />W 2 <br />Ln <br />QN <br />Liz <br />J <br />I HEREBY CERTIFY THAT THIS PLAN, <br />SPECIFICATION, OR REPORT WAS <br />PREPARED BY ME OR UNDER MY DIRECT <br />SUPERVISION AND THAT I AM A DULY <br />LICENSED PROFESSIONAL ENGINEER <br />UNDER THE LAWS OF THE STATE OF <br />MINNESOTA. <br />- Matthew R. Pavek <br />DATE 06/07/18 LICENSE NO. 44263 <br />ISSUE/SUBMITTAL SUMMARY <br />DATE I DESCRIPTION <br />11/09/17 (PLANNING COMMISSION COMMENTS <br />04/24/18 1 WATERSHED REVISIONS <br />06/07/18 CONSTRUCTION PLANS <br />REVISION SUMMARY <br />PROJECT N0.:1705UTILITY PLAN <br />C4.0 <br />©COPYRIGHT 2017 CIVIL SITE GROUP INC.' <br />