CONSTRUCTION LIMITS
<br />/ 30.30
<br />!029.92 MATCH --
<br />MATCH AT
<br />.81
<br />i g�1 00
<br />00 `
<br />30.38
<br />MATCH
<br />31.04 i
<br />` MATCH f
<br />` I\ 33.00
<br />N\� � 34.
<br />3.10 3 0
<br />M - CH
<br />33.50 34.00
<br />1
<br />1 \
<br />Lo `
<br />13.50
<br />1 � \ 34.0C
<br />30.37
<br />MATCH
<br />\
<br />`, \\ 9 1 ��
<br />NSTRUCTION LIMITS
<br />o �
<br />30.57 \
<br />MATCH %\
<br />Most westerly corner of Lot
<br />185, TAYLOR'S SUBDIVISION
<br />OF SPRING PARK LOTS
<br />,� ♦ sho''e
<br />6
<br />\Z31.28
<br />1rIATCH /
<br />IF
<br />do
<br />s contour \`
<br />#46
<br />�.. tS
<br />` "P
<br />30.97
<br />MATCH Oji
<br />e
<br />O
<br />mac'
<br />`33.009 ♦ 4%,�� `♦ ��
<br />�� ♦ m\
<br />34.00 � ��
<br />9 to .
<br />Most southerly corner of Lot
<br />185, TAYLOR'S SUBDIVISION -
<br />OF SPRING PARK LOTS
<br />'MATCH Qwi�
<br />31.27
<br />�♦ MATCH `
<br />11 `, �1
<br />1 IIID
<br />31.06
<br />MATCH
<br />3JO
<br />MTC i J_
<br />0
<br />_ 1
<br />` 29.23
<br />MATCH
<br />. 1/
<br />o�
<br />93
<br />go 14
<br />INSET A
<br />nd 1/2" Iron Pipe ----
<br />00 -a+
<br />1.7
<br />.07� �h5
<br />�b
<br />N"
<br />10��
<br />ATCHF,�\�#
<br />- 34.20
<br />MATCH
<br />SEE INSET A
<br />EROSION CONTROL NOTES:
<br />SEE SWPPP ON SHEETS SW1.0-SW1.5
<br />GROUNDWATER INFORMATION:
<br />PER GEOTECHNICAL REPORT BY NORTHERN TECHNOLOGIES, INC., DATED 03-30-2016
<br />GROUNDWATER WAS OBSERVED AT ELEVATIONS RANGING FROM 914.80 TO 925.70
<br />THE BORINGS & GROUNDWATER ARE AS FOLLOWS:
<br />SB -1 914.80
<br />SB -2 919.10
<br />SB -3 925.70
<br />SB -4 924.90
<br />REFER TO GEOTECHNICAL REPORT FOR ALL FINDINGS AND RECOMMENDATIONS
<br />CITY OF ORONO GRADING NOTES:
<br />1. RESERVED FOR CITY SPECIFIC GRADING NOTES.
<br />GENERAL GRADING NOTES:
<br />1. SEE SITE PLAN FOR HORIZONTAL LAYOUT & GENERAL GRADING NOTES.
<br />2. THE CONTRACTOR SHALL COMPLETE THE SITE GRADING CONSTRUCTION (INCLUDING BUT NOT
<br />LIMITED TO SITE PREPARATION, SOIL CORRECTION, EXCAVATION, EMBANKMENT, ETC.) IN
<br />ACCORDANCE WITH THE REQUIREMENTS OF THE OWNER'S SOILS ENGINEER. ALL SOIL TESTING
<br />SHALL BE COMPLETED BY THE OWNER'S SOILS ENGINEER. THE CONTRACTOR SHALL BE
<br />RESPONSIBLE FOR COORDINATING ALL REQUIRED SOIL TESTS AND INSPECTIONS WITH THE SOILS
<br />ENGINEER.
<br />3. GRADING AND EXCAVATION ACTIVITIES SHALL BE PERFORMED IN ACCORDANCE WITH THE
<br />NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT REQUIREMENTS &
<br />PERMIT REQUIREMENTS OF THE CITY.
<br />4. PROPOSED SPOT GRADES ARE FLOW -LINE FINISHED GRADE ELEVATIONS, UNLESS OTHERWISE
<br />NOTED.
<br />5. GRADES OF WALKS SHALL BE INSTALLED WITH 5% MAX. LONGITUDINAL SLOPE AND 1 % MIN. AND
<br />2% MAX. CROSS SLOPE, UNLESS OTHERWISE NOTED.
<br />6. PROPOSED SLOPES SHALL NOT EXCEED 3:1 UNLESS INDICATED OTHERWISE ON THE DRAWINGS.
<br />MAXIMUM SLOPES IN MAINTAINED AREAS IS 4.1
<br />7. PROPOSED RETAINING WALLS, FREESTANDING WALLS, OR COMBINATION OF WALL TYPES
<br />GREATER THAN 4' IN HEIGHT SHALL BE DESIGNED AND ENGINEERED BY A REGISTERED RETAINING
<br />WALL ENGINEER. DESIGN DRAWINGS SHALL BE SUBMITTED FOR REVIEW AND APPROVAL PRIOR TO
<br />CONSTRUCTION.
<br />8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF GRADE STAKES THROUGHOUT
<br />THE DURATION OF CONSTRUCTION TO ESTABLISH PROPER GRADES. THE CONTRACTOR SHALL
<br />ALSO BE RESPONSIBLE FOR A FINAL FIELD CHECK OF FINISHED GRADES ACCEPTABLE TO THE
<br />ENGINEER/LANDSCAPE ARCHITECT PRIOR TO TOPSOIL AND SODDING ACTIVITIES.
<br />9. IF EXCESS OR SHORTAGE OF SOIL MATERIAL EXISTS, THE CONTRACTOR SHALL TRANSPORT ALL
<br />EXCESS SOIL MATERIAL OFF THE SITE TO AN AREA SELECTED BY THE CONTRACTOR, OR IMPORT
<br />SUITABLE MATERIAL TO THE SITE.
<br />10. EXCAVATE TOPSOIL FROM AREAS TO BE FURTHER EXCAVATED OR REGRADED AND STOCKPILE IN
<br />AREAS DESIGNATED ON THE SITE. THE CONTRACTOR SHALL SALVAGE ENOUGH TOPSOIL FOR
<br />RESPREADING ON THE SITE AS SPECIFIED. EXCESS TOPSOIL SHALL BE PLACED IN EMBANKMENT
<br />AREAS, OUTSIDE OF BUILDING PADS, ROADWAYS AND PARKING AREAS. THE CONTRACTOR SHALL
<br />SUBCUT CUT AREAS, WHERE TURF IS TO BE ESTABLISHED, TO A DEPTH OF 6 INCHES. RESPREAD
<br />TOPSOIL IN AREAS WHERE TURF IS TO BE ESTABLISHED TO A MINIMUM DEPTH OF 6 INCHES.
<br />11. FINISHED GRADING SHALL BE COMPLETED. THE CONTRACTOR SHALL UNIFORMLY GRADE AREAS
<br />WITHIN LIMITS OF GRADING, INCLUDING ADJACENT TRANSITION AREAS. PROVIDE A SMOOTH
<br />FINISHED SURFACE WITHIN SPECIFIED TOLERANCES, WITH UNIFORM LEVELS OR SLOPES
<br />BETWEEN POINTS WHERE ELEVATIONS ARE SHOWN, OR BETWEEN SUCH POINTS AND EXISTING
<br />GRADES. AREAS THAT HAVE BEEN FINISH GRADED SHALL BE PROTECTED FROM SUBSEQUENT
<br />CONSTRUCTION OPERATIONS, TRAFFIC AND EROSION. REPAIR ALL AREAS THAT HAVE BECOME
<br />RUTTED BY TRAFFIC OR ERODED BY WATER OR HAS SETTLED BELOW THE CORRECT GRADE. ALL
<br />AREAS DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED TO EQUAL OR
<br />BETTER THAN ORIGINAL CONDITION OR TO THE REQUIREMENTS OF THE NEW WORK.
<br />12. PRIOR TO PLACEMENT OF THE AGGREGATE BASE, A TEST ROLL WILL BE REQUIRED ON THE
<br />STREET AND/OR PARKING AREA SUBGRADE. THE CONTRACTOR SHALL PROVIDE A LOADED
<br />TANDEM AXLE TRUCK WITH A GROSS WEIGHT OF 25 TONS. THE TEST ROLLING SHALL BE AT THE
<br />DIRECTION OF THE SOILS ENGINEER AND SHALL BE COMPLETED IN AREAS AS DIRECTED BY THE
<br />SOILS ENGINEER. THE SOILS ENGINEER SHALL DETERMINE WHICH SECTIONS OF THE STREET OR
<br />PARKING AREA ARE UNSTABLE. CORRECTION OF THE SUBGRADE SOILS SHALL BE COMPLETED IN
<br />ACCORDANCE WITH THE REQUIREMENTS OF THE SOILS ENGINEER.
<br />13. TOLERANCES
<br />13.1. THE BUILDING SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN
<br />0.30 FOOT ABOVE, OR 0.30 FOOT BELOW, THE PRESCRIBED ELEVATION AT ANY POINT WHERE
<br />MEASUREMENT IS MADE.
<br />13.2. THE STREET OR PARKING AREA SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY
<br />BY MORE THAN 0.05 FOOT ABOVE, OR 0.10 FOOT BELOW, THE PRESCRIBED ELEVATION OF
<br />ANY POINT WHERE MEASUREMENT IS MADE.
<br />13.3. AREAS WHICH ARE TO RECEIVE TOPSOIL SHALL BE GRADED TO WITHIN 0.30 FOOT ABOVE OR
<br />BELOW THE REQUIRED ELEVATION, UNLESS DIRECTED OTHERWISE BY THE ENGINEER.
<br />13.4. TOPSOIL SHALL BE GRADED TO PLUS OR MINUS 1/2 INCH OF THE SPECIFIED THICKNESS.
<br />14. MAINTENANCE
<br />14.1. THE CONTRACTOR SHALL PROTECT NEWLY GRADED AREAS FROM TRAFFIC AND EROSION,
<br />AND KEEP AREA FREE OF TRASH AND DEBRIS.
<br />14.2. CONTRACTOR SHALL REPAIR AND REESTABLISH GRADES IN SETTLED, ERODED AND RUTTED
<br />AREAS TO SPECIFIED TOLERANCES. DURING THE CONSTRUCTION, IF REQUIRED, AND DURING
<br />THE WARRANTY PERIOD, ERODED AREAS WHERE TURF IS TO BE ESTABLISHED SHALL BE
<br />RESEEDED AND MULCHED.
<br />14.3. WHERE COMPLETED COMPACTED AREAS ARE DISTURBED BY SUBSEQUENT CONSTRUCTION
<br />OPERATIONS OR ADVERSE WEATHER, CONTRACTOR SHALL SCARIFY, SURFACE, RESHAPE,
<br />AND COMPACT TO REQUIRED DENSITY PRIOR TO FURTHER CONSTRUCTION.
<br />GRADING PLAN LEGEND:
<br />EX. 1' CONTOUR ELEVATION INTERVAL
<br />1137 1.0' CONTOUR ELEVATION INTERVAL
<br />881.26 SPOT GRADE ELEVATION (GUTTER/FLOW LINE
<br />UNLESS OTHERWISE NOTED)
<br />891.00 G SPOT GRADE ELEVATION GUTTER
<br />891.00 TC SPOT GRADE ELEVATION TOP OF CURB
<br />891.00 BS/TS SPOT GRADE ELEVATION BOTTOM OF STAIRS/TOP OF STAIRS
<br />CURB AND GUTTER (T.0 = TIP OUT)
<br />EMERGENCY OVERFLOW
<br />EOF=891.00
<br />GOPHER STATE ONE CALL
<br />WWW.GOPHERSTATEONECALL.ORG
<br />(800) 252-1166 TOLL FREE
<br />(651) 454-0002 LOCAL
<br />Alp�'
<br />1 " = 30'-0"
<br />15-0" 0 30'-0"
<br />(C�OVHO
<br />sRote
<br />R Co n -g
<br />4931 W. 35TH ST. SUITE 200
<br />ST. LOUIS PARK, MN 55416
<br />CivilSiteGroup.com
<br />Matt Pavek Pat Sarver
<br />763-213-3944 952-250-2003
<br />LAKE, IIIA
<br />DEVELOPMENT, LLE
<br />711-
<br />(3)
<br />cY)
<br />Lf')
<br />L0
<br />O
<br />0
<br />0
<br />LU0
<br />Q
<br />O
<br />O
<br />C0
<br />Cy')
<br />Lo
<br />J co
<br />Lo
<br />z
<br />Z Y
<br />Lu
<br />z
<br />0
<br />LU
<br />az
<br />O z
<br />J 2i
<br />W
<br />CN
<br />N
<br />W Lu
<br />W a
<br />(D
<br />W 2
<br />L0
<br />QN
<br />Liz
<br />J
<br />I HEREBY CERTIFY THAT THIS PLAN,
<br />SPECIFICATION, OR REPORT WAS
<br />PREPARED BY ME OR UNDER MY DIRECT
<br />SUPERVISION AND THAT I AM A DULY
<br />LICENSED PROFESSIONAL ENGINEER
<br />UNDER THE LAWS OF THE STATE OF
<br />MINNESOTA.
<br />- MaTthew R. Pavek
<br />DATE 06/07/18 LICENSE NO. 44263
<br />ISSUE/SUBMITTAL SUMMARY
<br />DATE I DESCRIPTION
<br />11/09/17 (PLANNING COMMISSION COMMENTS
<br />04/24/18 WATERSHED REVISIONS
<br />04/26/18 WATERSHED REVISIONS
<br />06/07/18 CONSTRUCTION PLANS
<br />REVISION SUMMARY
<br />PROJECT NO.: 17059
<br />GRADING PLAN
<br />C300
<br />©COPYRIGHT 2017 CIVIL SITE GROUP INC.