Laserfiche WebLink
CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />Approval will be granted. The Developer shall provide sufficient drainage <br />and utility easements as necessary to allow for future City maintenance <br />access for stormwater management facilities. <br />8) Grading, Erosion Control <br />a) Erosion control shall adhere to 'Best Management Practices for <br />Protecting Water Quality in Urban Areas" and to the approved SWPPP. <br />All erosion controls as required by the City and the MCWD shall be in place <br />prior to commencing excavation on the site. All such erosion control <br />measures shall be maintained in working order until the site is revegetated. <br />b) The construction limits shall be clearly marked with adequate <br />fencing to prevent any construction damage or disturbance of any trees and <br />vegetation outside of the construction limits area. <br />9. Plans and Specifications. <br />a) Proposed plans shall be provided to the City for final review and <br />approval with the Final Plan set. The Public Works Department and any <br />other pertinent reviewing agencies shall review and approve all utility <br />improvements. <br />b) Any additional plans and specifications deemed necessary by the <br />City as review progresses. <br />10. Fees required <br />Water and Sewer Connection and SAC charges apply, based on the number of SAC <br />units applied. These fees would be due at the time of Building Permit. <br />The following fees are based on the number of SAC units, as determined by the <br />Met Council, at the time of Building Permit: <br />SAC $2,485 x SAC units = $ TBD <br />Water $4,240 x SAC units = $ TBD <br />Sanitary Sewer $5,100 x SAC units = $ TBD <br />Storm water trunk fees apply to new development and redevelopment of existing <br />properties and provide funding for the storm water infrastructure necessary to serve <br />Page 9 <br />