Laserfiche WebLink
AGENDA ITEM <br />Item No.: 21 Date: May 22, 2018 <br />Item Description: Old Crystal Bay Road (CSAH 112-CSAH 6) Road Project <br />Presenter: Adam T. Edwards, P.E. Agenda Public Works Director/ <br />Public Works Director/City Engineer Section: City Engineer's Report <br />1. Purpose. The purpose of this action item is to gain council approval to commence design for Old <br />Crystal Bay Road (OCB) between County Road 112 and County Road 6. <br />2. Background. For some time there have been concerns regarding the ability of OCB to handle the <br />traffic associated with the Orono Public School operations. In particular, OCB and those roads that feed <br />it suffer from heavy congestion during school drop off and pickup times. In 2010 the city conducted a <br />traffic and safety study which was followed that same year by a feasibility study. However the <br />construction project ultimately was not approved. In 2012 a 1.5 inch overlay was applied to this section <br />of road. In 2016 the School performed a traffic study of the internal school facilities and the road corridor <br />which confirmed many of the same issues the 2010 studies had identified. At the April 24, 2017 the work <br />session the council directed staff to look at the road condition and congestion issues. On May 22' staff <br />presented some options to the City Council's School Committee and received guidance to proceed with <br />requesting the county reconfigure the OCB-6 intersection to right in/ right out and to work toward a long <br />term plan for the road with construction in 2018. In July Council authorized Bolton and Menk to <br />complete a feasibility study of project. On November 27' the Council authorized staff to initiate initial <br />design work. The City and school have held several productive meetings with consulting staff from both <br />the city and school. Council approved the preliminary design on January 22nd, 2018. <br />3. Scope. The Project will consist of the reconstruction and reconfiguration of Old Crystal Bay Road <br />between County Road 112 and County Road 6 and well as the replacement of associated water, sewer and <br />storm water utilities. <br />4. Cost. The Engineer's Estimate for the total project cost is $ 3,192,655.50. This estimate includes <br />pavement, utilities, stormwater, street lights, sidewalks, Parking lot improvements, engineering and <br />project management. <br />5. Project Funding. Several funding sources are available to pay for the project including Municipal <br />State Aid (MSA). In addition as this is project is in partnership with the school district a portion of the <br />project will be funded by them. <br />a. Funding. The table below contains cost from the Engineers Estimate and funding source. <br />Funding Sourse <br />Engr Estimate <br />Estimated EOY 2018 <br />Fund Balance <br />Orono School District <br />$ 839,367.50 <br />NA <br />Municipal State Aid <br />$ 1,413,496.75 <br />Requires 5yr Advance <br />Community Investment Fund (Street Lighting) <br />$ 132,600.00 <br />$ 521,014 <br />Stormwater <br />$ 386,316.25 <br />$ 1,410,101 <br />Sewer and Water <br />$ 420,875.00 <br />$ 2,440,474 <br />Total <br />$ 3,192,655.50 <br />b. MSA Advance. The MSA portion of the project exceeds the City's current MSA account <br />balance. The State does allow Cities to advance up to 5 years' worth of MSA Funding. The resolution <br />Prepared By: 7E Reviewed By: -Sb)6Z Approved By: -T)X <br />