Laserfiche WebLink
Keep all heavy equipment off of the proposed treatment area before and after <br /> construction. The treatment area should be marked off before construction. This <br /> design is not valid&the system will need to be relocated if failure to protect the <br /> sites for new onsite sewage systems. <br /> MANAGEMENT PLAN: <br /> The tanks need to be maintained at a minimum of I time every 2 years,check with <br /> you pumper to set up a schedule. <br /> System inspected for areas by owner&or Inspector as determined by the local unit <br /> of Government. <br /> Any other requirements as determined by the local unit of Government. <br /> With proper installation&maintenance,this system should have no problem In <br /> treating septic effluent effectively. <br /> Nothing other than human waste,toilet tissue,laundry,showers,water softners etc. <br /> should be disposed of into the system. Recommend Iron filters be diverted out of the <br /> system.Garbage disposals are not recommended. Excessive amounts of soaps, <br /> antibacterial soaps,cleaning agents,shower cleaners used every shower&chlorine <br /> agents may kill the bacteria needed to treat septic effluent. Additives are not <br /> recommended. Recommend laundering be limited to 3 to 4 loads per day. The Multi- <br /> Flo Unit will need to be pumped when the settable solids reach 40%. Schirmers <br /> Wastewater will meet the pumper&clean out the Multi-Flo at the same time. There <br /> will not be a charge from Schirmers Wastewater as long as pumping is only needed 1 <br /> time every 3 years. The pumping charges from a licensed pumper are you <br /> responsibility. <br /> Thank You <br /> ,.,. .- h. 4„,,.../,...., <br /> Steven B.Schirmers <br /> This sign requ a signature from an Advanced Designer <br /> Zei.:VitVq21- 1Y/e0/1 7* <br /> Bernie Miller 2300 Fox St.,Orono Date <br /> Date <br /> ., it', / <br />