Laserfiche WebLink
DATE: <br />PROJECT: <br />CONTRACTOR: <br />F—P— H:\ORNO\C13112902\7 Co ,.,i..T Pav Aoolicatimie\f2018-1-10 112902 Pavi lim 1 IRA. WPR1 <br />REQUEST FOR PAYMENT <br />2017 SANITARY SEWER IMPROVEMENTS <br />INSITUFORM TECHNOLOGIES <br />REQUEST NO.: 1 & Final <br />ITEM <br />NO. <br />BID ITEM <br />ORIGINAL BID <br />COMPLETED <br />UNIT <br />BID <br />QUANTITY <br />UNIT <br />PRICE <br />THIS MONTH <br />TO DATE <br />QUANTITY1 <br />AMOUNT <br />QUANTITY <br />AMOUNT <br />1 MOBILIZATION <br />2 TRAFFIC CONTROL <br />3 CURED IN PLACE PIPE (CIPP) APPROXIMATELY 8" MEASURE <br />4 CURED IN PLACE PIPE (CIPP) APPROXIMATELY 9" MEASURE <br />5 CURED IN PLACE PIPE (CIPP) APPROXIMATELY 10" MEASURE <br />6 LATERAL REINSTATEMENT (ANY SIZE) <br />7 PROTRUDING TAP TRIMMING (NON -IRON, ANY SIZE) <br />8 PROTRUDING TAP TRIMMING (IRON, ANY SIZE) <br />9 SHORT LINER REPAIR (4' LENGTH) <br />10 SHORT LINER REPAIR (ADDITIONAL LENGTH) <br />LS <br />LS <br />LF <br />LF <br />LF <br />EACH <br />EACH <br />EACH <br />EACH <br />LF <br />1 <br />1 <br />3,817 <br />1,009 <br />353 <br />54 <br />1 <br />1 <br />15 <br />10 <br />11728.20 <br />1 <br />1 <br />3977 <br />1015 <br />53 <br />13 <br />$11,728.20 <br />1 <br />1 <br />3977 <br />1015 <br />53 <br />13.00 <br />$11,728.20 <br />544.80 <br />$4,544.80 <br />$4,544.80 <br />26.40 <br />$104,992.80 <br />$104,992.80 <br />$27.00 <br />$27,405.00 <br />$27,405.00 <br />$28.30 <br />$117.10 <br />$6.206.30 <br />$6,206.30 <br />$687.60 <br />687.60 <br />$4019.80 <br />r 52 257.40 <br />$52,257.40 <br />$105.80 <br />$223,328.30 $207,134.50 $207,134.50 <br />