The engineering as well and the eventual projects will be funded with a combination of <br />Municipal State Aid and the respective utility funds. The project will require an MSA Advance <br />which could provide up to approximately $1.3M. Concurrent with the preliminary design <br />process staff will draft a cooperative agreement outlining the cost sharing responsibilities. As a <br />starting point the City would be responsible for any required work in the right of way and the <br />school anything on school property. Further amenities and items in the ROW but for the benefit <br />of the school could also be cost shared. A possible cost share breakdown is listed below. Any <br />cost share and cooperative agreement will require negotiation and eventual approval by both <br />parties. <br />6. Timing. <br />Nov 27, 2017 <br />Feasibility report presentation / Design Fee Approval <br />Nov -Jan <br />Coordination meetings with School/ preliminary design development <br />OCB Cost Share Draft <br />Authorization to complete detailed design <br />April 2018 <br />Solicit Bids; Cooperative agreement approval <br />Total <br />Award <br />city <br />School Remarks <br />City Funding <br />Source <br />Parking Lot/access <br />$ <br />740,000 <br />$ <br />740,000 <br />NA <br />Road <br />$ <br />1,364,400 <br />$ <br />1,364,400 <br />MSA / PMF <br />Pavement Subtotal <br />$ <br />2,104,400 <br />$ <br />1,364,400 $ <br />740,000 <br />Sidewalk <br />$ <br />64,800 <br />$ <br />32,400 $ <br />32,400 50/50 cost share MSA / PMF <br />Lighting <br />$ <br />100,000 <br />$ <br />50,000 $ <br />50,000 50/50 cost share MSA / PMF <br />Pedestrian Signal <br />$ <br />25,000 <br />$ <br />12,500 $ <br />12,500 50/50 cost share MSA / PMF <br />Amenities subtotal <br />$ <br />189,800 <br />$ <br />94,900 $ <br />94,900 <br />Water Line <br />$ <br />210,000 <br />$ <br />210,000 <br />Water Fund <br />Sewer Line <br />$ <br />190,000 <br />$ <br />190,000 <br />Sanitary Sewer Fund <br />Stormwater <br />$ <br />250,000 <br />$ <br />250,000 <br />Possible cost <br />share <br />Stormwater Fund <br />Utility Subtotal <br />$ <br />650,000 <br />$ <br />650,000 <br />$ <br />- <br />Feasibility Study <br />$ <br />24,900 <br />$ <br />24,900 <br />MSA/ Utility Funds <br />Design/Engineering <br />$ <br />247,500 <br />$ <br />247,500 <br />MSA/ Utility Funds <br />Construction Oversight $ <br />275,440 <br />$ <br />275,440 <br />MSA/ Utility Funds <br />Engineering Subtotal <br />$ <br />547,840 <br />$ <br />547,840 <br />Total <br />$ <br />3,492,040 <br />$ <br />2,657,140 <br />$ <br />834,900 <br />MSA=Municipal State Aid PMF=Pavement Management Fund <br />6. Timing. <br />Nov 27, 2017 <br />Feasibility report presentation / Design Fee Approval <br />Nov -Jan <br />Coordination meetings with School/ preliminary design development <br />January 22, 2018 <br />Authorization to complete detailed design <br />April 2018 <br />Solicit Bids; Cooperative agreement approval <br />May14, 2018 <br />Award <br />Jun -Sep 2018 <br />Construction of Phase 1 <br />Jun -Sep 2019 <br />Construction of Phase 2 - If needed <br />Prepared By: Reviewed By: Approved By: _19a <br />