My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-25-2018 Council Packet
Orono
>
City Council
>
2018
>
06-25-2018 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 10:10:41 AM
Creation date
5/24/2019 10:03:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
18. CITY ENGINEERING ADMINISTRATION AND CONSTRUCTION <br />OBSERVATION. The Developer shall pay a fee for engineering administration. City engineering <br />administration will include monitoring of construction observation, consultation with Developer and <br />its engineer on status or problems regarding the project, coordination for final inspection and <br />acceptance, project monitoring during the warranty period, and processing of requests for reduction <br />in the "security." Fees for this service shall be at standard hourly rates. These fees shall be billed <br />monthly. <br />Contemporaneously with the execution of this Contract, the Developer shall deposit <br />$10,000.00 cash with the City ("Escrow"). All accrued interest, if any, shall be paid to the City to <br />reimburse the City for its cost in administering the escrow account. The purpose of the Escrow is to <br />guarantee reimbursement to the City for all out-of-pocket costs (including, but not limited to, <br />planning, engineering oversight, or legal consultant review) the City has incurred or will incur related <br />to the Development and for all out-of-pocket costs the City has incurred or will incur to assure that <br />the work is completed in accordance with the Stormwater Pollution Prevention Plan and the <br />provisions of Orono City Code Chapter 79. The Escrow may also be used by the City to eliminate <br />any hazardous conditions associated with the work and to repair any damage to public property or <br />infrastructure that is caused by the work associated with this Contract, if compliance with the terms <br />of this Contract are not accomplished. As the City receives consultant bills for incurred costs, the <br />City will in turn send a bill to the Developer. The Developer shall be responsible for payment to the <br />City within 30 days of the Developer's receipt of bill. In the event that the Developer does not make <br />payment to the City within the timeframe outlined in this Section, the City may immediately draw <br />from the escrow account without further approval of the Developer to reimburse the City for eligible <br />expenses the City has incurred. If the balance of the escrow account is insufficient to reimburse the <br />City its costs under this Section, the Developer will promptly reimburse the City any additional costs. <br />If the eligible expenses incurred by the City exceed the amount in escrow and are not promptly <br />reimbursed by the Developer, the City shall have the right to certify the unpaid balance to the subject <br />property pursuant to Minn. Stat. §§ 415.01 and 366.012. The Balance on deposit in the escrow, if <br />any, shall be returned to the Developer when the Development has been completed and written <br />notification is received from the Developer requesting the funds. <br />19. STORM WATER AND DRAINAGE TRUNK FEE. The Land is subject to the <br />standard Storm Water and Drainage Trunk Fee for three new % acre lots at $6,050.00 per acre. <br />$6,050.00 per acre x [3 lots at 0.5 acres each = 1.5 acres] = $9,075.00 <br />180976 <br />0 <br />196841A <br />
The URL can be used to link to this page
Your browser does not support the video tag.