My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-25-2018 Council Packet
Orono
>
City Council
>
2018
>
06-25-2018 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 10:10:41 AM
Creation date
5/24/2019 10:03:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8. IMPROVEMENTS. The Developer shall install and pay for the following as <br />required to be built in accordance with the approved Plans (the "Improvements"): <br />A. Site Grading, and Erosion Control <br />B. Setting of Iron Monuments <br />C. Surveying and Staking <br />D. Stormwater Management Facilities, Ponding, & Raingardens <br />E. Underground Utilities - Sanitary Sewer & Water Supply Systems <br />F. Retaining Walls <br />The Improvements shall be installed in accordance with the City subdivision ordinance; City <br />standard specifications for utilities; and any other ordinances including those concerning erosion <br />and drainage and any prohibiting grading, construction activity, and the use of power equipment. <br />The Developer shall submit plans and specifications which have been prepared by a competent <br />registered professional engineer to the City for approval by the City Engineer. The Developer <br />shall instruct its engineer to provide adequate field inspection personnel to assure an acceptable <br />level of quality control. In addition, the City may, at the City's discretion and at the Developer's <br />expense, have one or more City inspectors and an engineer inspect the work as the City may <br />reasonably determine. The Developer, its contractors and subcontractors, shall follow all <br />instructions received from the City's inspectors. The Developer's engineer shall provide for on- <br />site project management. The Developer's engineer is responsible for design changes and contract <br />administration between the Developer and the Developer's contractor. The Developer or its <br />engineer shall schedule a pre -construction meeting at a mutually agreeable time at the City Council <br />chambers with all parties concerned, including the City staff, to review the program for the <br />construction work. Within thirty (30) days after the completion of the Improvements and before the <br />"security" is released, the Developer shall supply the City with a complete set of reproducible "as <br />constructed" Plans, and an electronic file of the "as constructed" Plans in an auto CAD file based <br />upon the Hennepin County coordinate system, all prepared in accordance with City standards. <br />9. IRON MONUMENTS. In accordance with Minnesota Statutes Section 505.021 <br />and the Orono City Code, the final placement of iron monuments for all lot corners must be <br />completed before the "security" is released. The Developer's surveyor shall submit a written notice <br />to the City certifying that the monuments have been installed. <br />180976 <br />3 <br />196841A <br />
The URL can be used to link to this page
Your browser does not support the video tag.