My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-23-2018 Council Packet
Orono
>
City Council
>
2018
>
07-23-2018 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 10:01:39 AM
Creation date
5/24/2019 9:56:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br />Item No.: <br />Date: July 23, 2018 <br />Item Description: 2018 Stormwater Improvement Projects Award <br />Presenter: Adam T. Edwards, PE Agenda Consent Agenda <br />City Engineer/Director of Public Works Section: <br />1. Purpose. The purpose of this action item is to Award the contract for the 2018 Stormwater <br />improvement projects and accept the proposal from Bolton and Menk (BMI) for construction inspections. <br />2. Background. Each year the public works department works to repair and upgrade the City's <br />stormwater infrastructure. Inspections in 2017 identified a number of structures for repair or replacement. <br />On April 23' the Council approved engineering and design. <br />Project Scope. Replace, repair or install new stormwater structures as listed below: <br />a. Orono Orchard Road — Replace storm sewer inlet <br />b. Far -view Lane — Replace culvert <br />c. Turnham Road — Replace inlet and storm sewer outlet <br />d. North Arm Drive — Install drop structure on culvert and stabilize ravine <br />e. Fagerness Point Road — Replace inlet and storm sewer outlet <br />f. Watertown Road — Install curb and gutter <br />4. Cost. The city received 7 bids. The lowest bid was from Minger contracting for $98,048.70 BMI <br />provided an estimate of NTE $23,000 to perform construction management for the projects. <br />Contractor <br />Bid <br />Minger <br />$ 98,048.70 <br />Kusske Construction <br />$ 134,754.00 <br />G.F. Jedliki <br />$ 146,230.00 <br />Meyer Contracting <br />$ 147,836.43 <br />Astech <br />$ 147,272.00 <br />Geislin er and Sons <br />$ 162,540.50 <br />Urban Companies <br />$ 184,582.00 <br />5. Funding. This project will be funded through the Stormwater Enterprise Fund. The Capital <br />Improvement Plan (CIP) budgeted $209,989 for general storm sewer improvement projects for 2018. The <br />EOY 17 Fund balance is proj ected to be $1,410,101. <br />6. Staff Recommendation. I recommend that council award the contract to Minger. <br />COUNCIL ACTION REQUESTED <br />Motion to award the 2018 storm water Contract to Minger for $98,048.70 and accept the proposal from <br />BMI for an amount not to exceed $ 23,000 for construction oversight. <br />Exhibits <br />Exhibit A. BMI Proposal <br />Prepared By: ,/ <br />Reviewed By: <br />Approved By: -TV <br />
The URL can be used to link to this page
Your browser does not support the video tag.