Laserfiche WebLink
SCHEDULE OF UNIT PRICES <br />CITY OF ORONO <br />2018 STREET IMPROVEMENTS <br />BMI PROJECT NUMBER - C13.114279 <br />UNIT <br />ITEM BID ITEM NOTES UNIT QUANTITY PRICE AMOUNT <br />CHANGE ORDER 1 - ITEMS TO BE DELETED <br />78 <br />STREETS <br />EACH <br />2 <br />$693.00 <br />$1,386.00 <br />4 <br />SAWING BITUMINOUS (FULL DEPTH) <br />LIN FT <br />250 <br />$1.90 <br />$475.00 <br />6 <br />MILL BITUMINOUS PAVEMENT (ANY DEPTH) <br />5 <br />SQ YD <br />670 <br />$1.30 <br />$871.00 <br />7 <br />MILL ADJACENT TO BITUMINOUS CURB <br />$329.00 <br />LIN FT <br />50 <br />$0.59 <br />$29.50 <br />10 <br />CRACK REPAIR <br />[1] <br />LIN FT <br />50 <br />$6.90 <br />$345.00 <br />15 <br />SALVAGE & REINSTALL LANDSCAPE ROCK <br />[2] <br />SQ FT <br />300 <br />$2.05 <br />$615.00 <br />21 <br />COMMON EXCAVATION (PATCHING) (CV) <br />[1] <br />CU YD <br />100 <br />$29.80 <br />$2,980.00 <br />25 <br />AGGREGATE BASE CLASS 5 (100% CRUSHED) <br />TON <br />TON <br />115 <br />$17.90 <br />$2,058.50 <br />27 <br />TYPE SP 9.5 WEAR COURSE MIX (2,B) <br />100 <br />TON <br />120 <br />$63.50 <br />$7,620.00 <br />29 <br />TYPE SP 12.5 NON WEAR COURSE MIX (2,B) FOR PATCHING <br />[1] <br />TON <br />40 <br />$86.60 <br />$3,464.00 <br />31 <br />3" BITUMINOUS DRIVEWAY <br />$800.00 <br />SQ YD <br />60 <br />$21.90 <br />$1,314.00 <br />32 <br />BITUMINOUS CURB <br />LIN FT <br />100 <br />$6.30 <br />$630.00 <br />41 <br />GUIDE POST TYPE B <br />EACH <br />1 <br />$52.00 <br />$52.00 <br />44 <br />COMMON TOPSOIL BORROW (LV) <br />[5] <br />CU YD <br />20 <br />$41.70 <br />$834.00 <br />47 <br />SOD <br />SQ YD <br />150 <br />$6.00 <br />$900.00 <br />SANITARY SEWER & WATERMAIN <br />78 <br />ADJUST FRAME & RING CASTING <br />EACH <br />2 <br />$693.00 <br />$1,386.00 <br />STORM SEWER <br />82 <br />6" HDPE DRAINTILE <br />LIN FT <br />5 <br />$21.70 <br />$108.50 <br />84 <br />12' HDPE PIPE APRON <br />EACH <br />1 <br />$329.00 <br />$329.00 <br />89 <br />12" RC PIPE SEWER DES 3006 CL V <br />LIN FT <br />229 <br />$50.00 <br />$11,450.00 <br />90 <br />12" HDPE PIPE SEWER - DIRECTIONAL DRILL <br />LIN FT <br />66 <br />$74.60 <br />$4,923.60 <br />99 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN H <br />LIN FT <br />15.0 <br />$301.00 <br />$4,515.00 <br />106 <br />FURNISH & INSTALL CASTING ASSEMBLY - STORM <br />EACH <br />5 <br />$697.00 <br />$3,485.00 <br />107 <br />RANDOM RIPRAP CLASS III <br />TON <br />8 <br />$66.90 <br />$535.20 <br />108 <br />SILT FENCE, TYPE MS <br />LIN FT <br />100 <br />$2.05 <br />$205.00 <br />110 <br />STORM DRAIN INLET PROTECTION <br />EACH <br />5 <br />$136.00 <br />$680.00 <br />111 <br />SEDIMENT CONTROL LOG TYPE STRAW <br />LIN FT <br />100 <br />$8.00 <br />$800.00 <br />PART A TOTAL: $50,605.30 <br />NOTES: <br />[P] DENOTES PLAN QUANTITY <br />[LV] DENOTES LOOSE VOLUME <br />[CV] DENOTES COMPACTED VOLUME <br />[1] AS DETERMINED IN THE FIELD BY THE ENGINEER <br />[2] ANY TYPE. ANY SIZE. <br />[5] USED FOR SLOPE DRESSING MATERIAL <br />CITY OF ORONO - C13.114279 BOLTON MENK, INC. 2018 SCHEDULE OF UNIT PRICES <br />January 2018 Page 00520-7 <br />