My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-23-2018 Council Packet
Orono
>
City Council
>
2018
>
07-23-2018 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 10:01:39 AM
Creation date
5/24/2019 9:56:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No.: <br />Date: July 23, 2018 <br />Item Description: 2018 Road Maintenance Project- Change Order <br />Presenter: Adam Edwards Agenda Consent Agenda <br />Public Works Director/City Engineer Section: <br />1. Purpose. The purpose of this action item is to approve the change order for Forest Arms Landing. <br />2. Background. On April 23' 2018 the City awarded the 2018 Road Project. That award and <br />supporting design was based on a mill and overlay project for Forest Lake Landing. The Council heard <br />concerns from residents expressing a desire for curb and gutter for Forest Arms Landing. At the June 25' <br />Council work session the Council expressed a desire to change the design to a curb and gutter design and <br />to widen the pavement at the end of the road to improve turning around options. Staff redesigned the road <br />and produced a change order. <br />3. Change Order Scope. The change order consists of a full depth reclamation of the pavement; <br />installation of concrete curbing, an additional stormwater catch basin and additional pavement at the end <br />of the road on Forest Lake Landing. (Layout at Exhibit A) <br />4. Cost. The change order will cost $36,295.45. (Exhibit B) <br />5. Funding. Funding for the project will come from a combination of the pavement management fund, <br />stormwater fund, water fund and sewer fund. <br />Fund <br />As bid <br />Change Order <br />Total with Change Order <br />Pavement Fund <br />$ 976,070 <br />+$ 19,340 <br />$ 995,409 <br />Stormwater <br />$ 369,015 <br />$ 369,015 <br />Sewer and Water <br />$ 281,272 <br />+$ 16,956 <br />$ 298,228 <br />Total <br />$ 1,626,357 <br />+$ 36,296 <br />$ 1,662,653 <br />6. Staff Recommendation. I recommend approval of the change order. <br />COUNCIL ACTION REQUESTED <br />Move to approve the change order for the 2018 Road project for the installation of curb and gutter on <br />Forest Arms Landing. <br />Exhibits <br />Exhibit A. Forest Arms Landing Layout. <br />Exhibit B. Change Order <br />Prepared By: 4, <br />Reviewed By: <br />Approved By: -TV <br />
The URL can be used to link to this page
Your browser does not support the video tag.