Laserfiche WebLink
Item No.: 9 Date: February 26, 2018 <br />Item Description: 2018 Road Maintenance Project - Approval to Solicit Bids <br />Presenter: Adam Edwards Agenda Public Works Director/ <br />Public Works Director/City Engineer Section: City Engineer Report <br />1. Purpose. The purpose of this action item is to update the Council on the designs for the 2018 Street <br />Maintenance Projects and authorize the solicitation of bids for the project. <br />2. Background. At the March 22"d, 2017 Council Work Session the Council provided guidance on a <br />way forward for road maintenance funding and projects for the 2017 and 2018 construction seasons. At <br />the April 24'x', 2018 council meeting, council provided direction to staff on roads to include in 2018 Street <br />Maintenance Project. On June 23rd, 2017 the Mayor requested the city Engineer look at realigning the <br />northern end of Linden Lane to remove long standing encroachments and improving drainage. On July <br />24'x', 2017 the Council approved the engineering and design for the selected roads. City staff and Bolton <br />and Menk then conducted surveying, assessments and prepared draft designs for the subject roads. Draft <br />plans were shared with residents at the open house on December 13", 2017. The onsite assessments and <br />feedback for residents resulted in additional planning to address stormwater issues on several of the roads. <br />The draft plans and bid packet is now ready for bid solicitation. <br />3. Scope of Work. The project consist of the reclamation and or mill and overlay of the bituminous <br />pavement, select subgrade corrections, and the replacement / improvement of the associated stormwater <br />systems Forest Arms Lane, the Wildhurst Trail Network, Vine Place, Lyric Avenue (Livingston to <br />Blaine), Minnetonka Avenue, and West Lafayette. Also include is the realignment of Linden Lane and <br />the replacement of the water main that runs underneath west Lafayette Rd. <br />4. Cost. The estimated cost based on the engineer's estimate is shown in the table below. This estimate <br />is based on the results of soils analysis, resident feedback and detailed design. The estimate is an increase <br />from the planning level estimates of the CIP. Increases in the pavement are primarily attributable to <br />increases in the amount of subgrade work required to address poor soils. Increases in the stormwater <br />estimates are primarily due to drainage issue on Wildhurst Lane. <br />5. Funding. Funding for the project will come from a combination of the pavement management fund, <br />Stormwater Fund, Water fund and Sewer fund. There is insufficient funding available in the pavement <br />Prepared By: Reviewed By:, ` Approved By: -196Z <br />Engineer's Estimate <br />City Streets <br />Pavement <br />Storm <br />Utilities <br />Total <br />Forest Arm Lane <br />$ 367,107 <br />$ <br />77,640 <br />$ <br />11,300 <br />$ <br />456,047 <br />Wildhurst Trail (includes Forest Lake <br />Landing) <br />$ 366,356 <br />$ 244,475 <br />$ <br />5,250 <br />$ <br />616,081 <br />Vine Place <br />$ 18,003 <br />$ <br />- <br />$ <br />3,000 <br />$ <br />21,003 <br />West Lafayette (Shadywood to end) <br />$ 216,680 <br />$ <br />24,275 <br />$ <br />250,290 <br />$ <br />491,245 <br />Lyric Avenue (Livingston to Blaine) <br />$ 37,085 <br />$ <br />3,000 <br />$ <br />3,750 <br />$ <br />43,835 <br />Minnetonka Highlands Lane <br />$ 59,900 <br />$ <br />17,975 <br />$ <br />750 <br />$ <br />78,625 <br />Linden Lane <br />$ 9,634 <br />$ <br />3,250 <br />$ <br />- <br />$ <br />12,884 <br />Engineering Desi <br />$ 90,822 <br />$ <br />21,441 <br />$ <br />21,737 <br />$ <br />134,000 <br />Engineering Construction Services <br />$ 107,477 <br />$ <br />37,062 <br />$ <br />27,434 <br />$ <br />171,972 <br />Total <br />$ 1,273,064 <br />$ 429,117 <br />$ 323,511 <br />$ 2,025,692 <br />5. Funding. Funding for the project will come from a combination of the pavement management fund, <br />Stormwater Fund, Water fund and Sewer fund. There is insufficient funding available in the pavement <br />Prepared By: Reviewed By:, ` Approved By: -196Z <br />