My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-23-2018 Council Packet
Orono
>
City Council
>
2018
>
04-23-2018 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 9:02:29 AM
Creation date
5/24/2019 8:56:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No.: 20 Date: April 23, 2018 <br />Item Description: Approval for Big Island Master Plan <br />Presenter: Adam T. Edwards, PE Agenda Public Works Director/ <br />Public Works Director/City Engineer Section: City Engineer's Report <br />1. Purpose. The purpose of this action item is to gain approval the Big Island Park Master Plan. <br />2. Background. Big Island Park was purchased by the City of Orono in 2006. Part of the purchase was <br />funded by grant from the Minnehaha Creek Watershed District (MCWD) in exchange for a conservation <br />easement over the property. In 2011 the City and MCWD partnered to create the Big Island <br />Management Plan as a continuance of the easement agreement and to provide long term management <br />direction for the Park. In early 2017 the Big Island Committee was established to evaluate and develop <br />plan to improve the Park and meet the goals of the Big Island Management Plan. In order to inform <br />decision making and move forward with planning and applying for grant opportunity a master plan is <br />required. On Nov13', 2018 the City Council authorized Bolton and Menk (BMI) to prepare master plan <br />and develop grant applications. <br />3. Coordination. The table below outlines the coordination completed to date with respect to the Big <br />island Master Plan. <br />When <br />Dec 1St, 2017 <br />What <br />Staff met with and provided Direction to BMI for Master plan. <br />Jan 5th, 2018 <br />BMI provided draft plan to Staff and representatives from the Big island Steering <br />Committee. <br />Jan 31St, 2018 <br />City Staff and Minnehaha Creek watershed District (MCWD) staff met to review <br />the draft plan and work out future coordination between the agencies <br />Feb 9th, 2018 <br />The Big Island Steering Committee met to review and prioritize the Plan <br />Mar 5, 2018 <br />The Park Commission endorsed the plan <br />Apr 11th, 2018 <br />The plan was presented to the Big Island Committee <br />Apr 12th, 2018 <br />The plan was presented to the MCWD Board <br />4. Project Scope. The master plan is a conceptual plan with cost estimates including ADA accessible <br />pathways and destinations throughout park, dock area improvements, overlook / pavilion area, beach <br />improvements, and restroom facilities. The plan map and example amenities are at Exhibit A. <br />5. Cost. The estimated cost to for all of the proposed improvements is $226,650. A detailed cost estimate <br />is at Exhibit B. <br />6. Funding. The intent of the Big Island Committee is to fund the various elements of the plan via <br />donations and grants. The City may provide funding for select projects on the plan from either the Parks <br />Operating Budget or Parks Enterprise Fund. As elements of the plan are brought forward for execution <br />each will go through a project approval process to determine funding. Ongoing maintenance for any <br />improvements made will come from the Parks Operating Budget. <br />7. Way Forward. Smaller cost items such as the select security measures, signage and bollard/boulders <br />will be planned, coordinated and executed this year by staff. Larger cost items will follow the process in <br />the table below. <br />Prepared By: Reviewed By: -1)J2, Approved By: -1)a <br />
The URL can be used to link to this page
Your browser does not support the video tag.