My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-23-2018 Council Packet
Orono
>
City Council
>
2018
>
04-23-2018 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 9:02:29 AM
Creation date
5/24/2019 8:56:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No.: 17 <br />Date: April 23rd, 2018 <br />Item Description: 2018 Road Maintenance Project- Award <br />Presenter: Adam Edwards Agenda Public Works Director/ <br />Public Works Director/City Engineer Section: City Engineer's Report <br />1. Purpose. The purpose of this action item is to award the contract for the 2018 Street Maintenance <br />Project. <br />2. Background. At the March 22nd, 2017 Council Work Session the Council provided guidance on a <br />way forward for road maintenance funding and projects for the 2017 and 2018 construction seasons. At <br />the April 24', 2018 council meeting, council provided direction to staff on roads to include in 2018 Street <br />Maintenance Project. On June 23rd, 2017 the Mayor requested the City Engineer look at realigning the <br />northern end of Linden Lane to remove long standing encroachments and improving drainage. On July <br />24th, 2017 the Council approved the engineering and design for the selected roads. City staff and Bolton <br />and Menk then conducted surveying, assessments and prepared draft designs for the subject roads. Draft <br />plans were shared with residents at the open house on December 131, 2017. The onsite assessments and <br />feedback from residents resulted in additional planning to address stormwater issues on several of the <br />roads. The Council approved solicitation for bid at the end of February. Since the engineer estimates for <br />the projects were higher than the projected fund availability for street projects, the bid was broken in to <br />two parts. Forest Arms Lane be listed as a bid alternate (Part B) during the solicitation process. The <br />other roads are the base (Part A) of the bid. <br />3. Scope of Work. The project consists of the reclamation and or mill and overlay of the bituminous <br />pavement, select subgrade corrections, and the replacement / improvement of the associated stormwater <br />systems for the Wildhurst Trail Network, Vine Place, Lyric Avenue (Livingston to Blaine), Minnetonka <br />Highlands, and West Lafayette. Also included is the realignment of Linden Lane and the replacement of <br />the water main that runs underneath West Lafayette Rd. <br />4. Cost. The city received four bids. The Bid Summary is at Exhibit A. Due to funding constraints <br />Staff is recommending only awarding Bid Part A. The low bid is for $1,209,357.00 is from Park <br />Construction. In addition to the construction cost, Bolton and Menk provided an estimate for construction <br />oversight. (Exhibit B) <br />Who <br />Work <br />Cost <br />Status <br />Bolton <br />&Menk, Inc <br />Design and Bid Engineering Construction <br />Oversight <br />$ 134,000 <br />Not to exceed <br />Park <br />Construction <br />Reclamation and Resurfacing of <br />$1,209,357 <br />Pending award <br />Bolton <br />&Menk, Inc <br />Construction Oversight (Includes Leaf <br />Street which is a separate award item) <br />$ 283,000 <br />Not to exceed <br />TOTAL <br />$ 1,626,357 <br />5. Funding. Funding for the project will come from a combination of the pavement management fund, <br />stormwater fund, water fund and sewer fund. <br />Fund Engr Estimate As bid Estimated EOY 2018 Fund Balance <br />Pavement Fund $ 853,537 $ 976,070 $ 18,930 <br />Stormwater $ 357,570 $ 369,015 $ 1,410,101 <br />Prepared By:,! <br />Reviewed By: <br />Approved By: <br />
The URL can be used to link to this page
Your browser does not support the video tag.