My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-29-2018 Council Packet
Orono
>
City Council
>
2018
>
05-29-2018 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 8:47:06 AM
Creation date
5/24/2019 8:39:26 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Old Crystal Bay Road Improvements <br />May 23, 2018 <br />Page 2 <br />Fee Estimate <br />Based on the scope of services described above, we propose a not -to -exceed of $220,000 to be billed on <br />an hourly basis. This fee accounts for the additional design services that were provided to evaluate <br />drainage issues not included in the original scope of the project and includes coordinating the work of a <br />geotechnical engineering firm to complete materials testing for the project. A separate proposal for <br />materials testing services will be submitted to the City for Review. <br />Please let me know if you have questions or need additional information. <br />Sincerely, <br />Bolton & Menk, Inc. <br />--�D'Q ? V� <br />David P. Martini, P.E. <br />Principal Engineer <br />H:\ORNO\C13114606\1_Corres\C_To Others\OCB Construction Services 4-23-18.docx <br />BoLton & Menk is an <br />
The URL can be used to link to this page
Your browser does not support the video tag.