Laserfiche WebLink
C)2018 Westwood Professional Services, Inc. <br />VARIABLE O ADA REQUIRED TRUNCATED <br />DOME PER DOT STD. <br />PLATE 7036F.F. <br />MN/DOT <br />APPROVED <br />MATERIAL. o m� <br />'a <br />N <br />24" MIN. ee„r-ie eSe " leoesepe 3.. <br />I° <br />g 9 <br />FACE OF I 2.� <br />CURB VARIABLE MATCH <br />EXISTING WIDTH <br />A -J <br />PLAN ROUND ALL SLOPED <br />TOP OF CURB INTERSECTIONS <br />VARIABLE MATCH <br />EXISTING WIDTH <br />2' 2' <br />VARIABLE <br />SECTION B -B <br />8" VARIES 4`0" <br />DESIGN STREET <br />GRADE <br />BITUMINOUS <br />MAZE ��- MAX 50:1 OR HWAY <br />MAX. 20'1 CONCRETE <br />SIDEWALK <br />6" CONCRETE <br />4" AGGREGATE BASE <br />SECTION A -A CONCRETE CURB & GUTTER <br />OV -Q `Y?- IAST REVISION: <br />PEDESTRIAN CURB RAMP IAN 2006 <br />PATHWAY/SIDEWALK <br />a PLATE NO. <br />p89' STR-11A <br />139-STR-I 1A.DWG <br />*2" MnDOT TYPE SPWEA340E WEARING COURSE <br />MnDOT SPEC. 2357 BITUMINOUS TACK COAT <br />2" MnDOT TYPE SPNWA330E BASE COURSE <br />10" MnDOT SPEC. 3138 CLASS 5, 100% CRUSHED AGGREGATE BASE <br />12" SELECT GRANULAR SUBBASE <br />COMPACTED SAND SUBGRADE (100% STANDARD PROCTOR) <br />REFER TO GEOTECTNICAL REPORT FOR ADDITIONAL REQUIREMENTS <br />PAVffiMM SECTION <br />FINISH <br />01*61111161111 <br />SEE PLATE NO. ST05 FOR RIPRAP PLACEMENT. <br />ANCHOR CLIP <br />TIE LAST 3 PIPE JOINTS. USE <br />2 TIE BOLT FASTENERS PER <br />JOINT. INSTALL AT 60° FROM <br />6" TOP OR BOTTOM OF PIPE. <br />MAX. <br />PROVIDE 3 ANCHOR CLIPS TO FASTEN <br />° TRASH GUARD TO FLARED END SECTION. <br />HOT DIP GALVANIZE AFTER <br />i FABRICATION. <br />H` <br />TRASH GUARD SIZING <br />PIPE H' BOLT STD. BAR HEAVY DUTY <br />SIZE DIA. DIA. BAR DIA. <br />12"-24" <br />CLASS III <br />d50=9' <br />4" 5/8" <br />5/8"0 <br />3/4"0 <br />27"-48" <br />Dia. <br />6" 3/4" <br />3/4"0 <br />1110 <br />54"-90" <br />L <br />8" 1 " <br />1110 1 <br />1/4"0 <br />winch nM <br />FLARED <br />END <br />SECTION <br />WITH TRASH <br />GUARD <br />F 7A- I 1 Fj <br />ACE OF <br />CURB <br />LAST REVISED: <br />011124107 <br />STXX <br />--I 1 <br />FACE OF <br />CURB <br />TABLE OF QUANITIES <br />9" MIN. <br />BITUMINOUS PAVEMENT <br />CL. 5 AGGREGATE <br />GRAN. SUBBASE <br />•� 4" PERFORATED PVC PIPE SDR 35 <br />W/ FABRIC SOCK <br />GROUT INSIDE & OUTSIDE <br />OF CATCH BASIN <br />4 NOTE: TYPICAL LENGTH = 50 L.F. <br />L CATCH BASIN <br />PLAN TYPICAL STREET SECTION <br />1.0' 1O CLASS III <br />CLASS III RIPRAP <br />3' 2' RIPRAP WEAR <br />BASE <br />1.0' 1O CL. 5 AGG. BASE <br />GEOTEXTILE FABRIC <br />MNDOT 3733, TYPE IV o a; o•oo a; o•oo a; o•o� o•o�o; o•o� <br />.o o a- .a <br />GEOTEXTILE FABRIC MNDOT <br />MIN <br />3733, <br />3733, TYPE IV. SEC, A -A SECTION B -B "t -VARIES <br />8" 8' <br />NOTE: --- - - O FOR PIPES GREATER OR EQUAL TO 30", USE 1.5'. <br />2. THE CONTRACTOR SHALL PLACE RIP RAP, PULVERIZED TOPSOIL, SEED AND WOODFIBER 4" PERF. PVC PIPE SDR 35 <br />BLANKET IMMEDIATELY AFTER PIPE IS INSTALLED, EXTEND AREA TO MATCH UNDISTURBED GRANULAR SUBBASE <br />SOIL. MIRAFI 140-S <br />O DIMENSION "E" EQUALS INSIDE WIDTH OF APRON. PEA ROCK OR WASHED FILTER FABRIC SOCK <br />4. RIP RAP SHALL BE CLASS 3 SIZE UNLESS OTHERWISE NOTED ON PLANS. GRAVEL IN THIS AREA <br />RIP -RAP AT RCP LA03 03ST V08D. LA03 03ST V08D <br />Nestwood OUTLETS Westwood FINGER DRAIN <br />ST05 ST08 <br />HANDICAP PARKING <br />SPACE WITH PAINTED NOTE: BOTTOM OF <br />INTERNATIONAL SYMBOL SIGNS TO BE <br />8' 8' 8' OF ACCESSIBILITY WITH MOUNTED 60"-66" <br />MIN. MIN. MIN CONTRASTING SQUARE FROM PARKING GRADE, CAP UNIT, ADHERED TO <br />BACKGROUND, CENTERED l(\./. SEE SIGN POST SWALE AT TOP OF WALL TOP COURSE WITH <br />TOWARD DRIVE AISLE INSTALLATION DETAIL MAY BE REQUIRED, VERIFY ADHESIVE <br />w l Nn� NO PARKING SIGN PARKING <br />MIN T 5' MIN. 5" 0O ® `0N� CENTERED AT HEAD OF VEHICLE <br />HANDICAP PARKING ANCHORING PINS(AS REQUIRED) <br />SPACE ON CENTER <br />PARRYLAN o� MIN. AERJPLAN MIN. Ldv STRIPE REQUIRED SIGN, 12'X18", OR 8" MIN. LOW PERMEABLE SOIL <br />PLAN VIEW OF DIAGONAL RAMP PLAN VIEW OF PERPENDICULAR RAMP HANDICAP SIGN UP TO $200 FINE PER LOCAL CODE CONCRETE MODULAR <br />CENTERED AT HEAD FOR VIOLATION III-III=1 - BLOCK <br />CURB FACE OR RAMP LANDING HANDICAP VAN <br />OF SPACE ON CENTER <br />GUTTER 5'-4" MIN. 4' MIN. ACCESSIBLE PARKING =III -1' 1" - 1 1/4" <br />STRIPE VAN FILTER FABRIC it <br />59• APPROACH _ ACCESSIBLE SIGN, 12'X6'; OR PER <br />SLOPE MAX i HANDICAP PARKING LOCAL CODE, 8 FINISHED GRADE _ <br />RETAINED SOIL CD <br />RAMP 8.33q RAMP ACCESS AISLE WITH AS APPLICABLE N - <br />SEE NOTE #4 MAX. SLOPE � AR° PAINTED 12" HIGH HANDICAP o = <br />. iPARKING UNIT DRAINAGE FILL <br />1/2" PREFORMED JOINT CONCRETE WALK uv LETTERING OF 'NO SIGN 1=III=III=III=III=III= - - <br />FILLER MATERIAL SECTION A -A PARKING" CENTERED (3/4" CRUSHED 111-1111111 <br />ROCK OR STONE) L,. - -III-III-III-III-III-III-III-III <br />6" HEIGHT MAX. SIDE FLARE ROUND ALL SLOPED NOTE. SEE PLAN FOR TOWARD DRIVE AISLE 50 �1 -11 II itll III-III-III-IIT=Ii1=1�1- <br />107 MAX. SLOPE INTERSECTIONS PARKING LAYOUT APPROXIMATE LIMITS -111 UNREINFORCED CONCRETE OR <br />OF EXCAVATION <br />4" WIDE PAINTED 10" DIAMETER CENTER CRUSHED STONE LEVELING PAD <br />5' MIN. 4' MIN. 5' MIN. n STRIPING, 45 DEGREE SYMBOL IN PARKING <br />�Ni>avJJJa CROSS HATCH STALL, ALL LINES 4" PERFORATED PVC DRAINAGE TILE NOTE: CONTRACTOR TO <br />SIDE FLARE RAMP SIDE FLARE ® ON�� PATTERN AT 2' 0. C. TO BE 5" WIDE. WRAPPED IN FILTER FABRIC, PROVIDE ENGINEERING AND <br />NOTES; ELEVATION OF RAMP AT ACCESS AISLE N TO DAYLIGHT OR STORM SYSTEM, FOUNDATION SOIL SHOP DRAWINGS IF WALL IS <br />1. PROVIDE A RELATIVELY FLAT MINIMUM 4'x4' LANDING BEHIND THE PEDESTRIAN RAMP, 2% MAXIMUM FACE OF CURB AS REQUIRED GREATER THAN 4 FEET TALL. <br />CROSS SLOPE BOTH DIRECTIONS. CONTRACTOR TO SUBMIT WALL <br />2. CURB RAMP AREA TO BE CONCRETE AND MEET LATEST ADA REQUIREMENTS. RAMP CROSS SLOPE 2% SIDEWALK _ BLOCK TYPE, SIZE, AND COLOR <br />MAXIMUM. BACK-TO-BACK PEDESTRIAN RAMPS SHALL HAVE MINIMUM 48" LANDING BETWEEN, OR �I FOR APPROVAL. <br />PROVIDE AT -GRADE CROSSING. <br />3. SIDE FLARES TO BE CONCRETE AND IMPLEMENTED WHERE ADJACENT TO PAVED AREAS. FLARED 4 <br />SLOPE TO BE 10% MAXIMUM. EXISTING CURB RAMP ALTERATIONS, WITH NO LANDING, SHALL BE HANDICAP SIGN <br />8.33% MAXIMUM. PROVIDE 10% MAXIMUM SLOPE, UNLESS NOTED OTHERWISE. CENTERED AT HEAD <br />4. ANY VERTICAL LIP THAT OCCURS AT THE FLOW LINE MAY NOT BE GREATER THAN 1/4 INCH. NO TE: STRIPING TO <br />5. RAMP AND FLARED SIDE SURFACE TO BE MEDIUM BROOM FINISH, PERPENDICULAR TO TRAVEL PATH. MATCH PARKING, OF SPACE, 2' MIN. <br />6. LANDING AND RAMP AREA IS CONSIDERED AS CONCRETE WALK, AND TRUNCATED DOME AREA IS UNLESS PER LOCAL AND 8' MAX. FROM <br />INCIDENTAL, UNLESS NOTED OTHERWISE. CODE FACE OF CURB <br />HANDICAP HANDICAP <br />PARKING SYMBOL <br />LAST REl/ISED: LAST REVISED: <br />PAVEMENT SECTIONS 1110,3115 Westwood PRIVATE PEDESTRIAN CURB RAMP 01131112 VVestvvood HANDICAP ACCESSIBLE SIGNAGE <br />SI19 SI09-CP AND STRIPING <br />VARIES, SEE GRADING ANTI-WASH/GEOJUTE EROSION CONTROL FABRIC(MN/DOT 3883, TYPE 2) <br />ON SIDESLOPES OF 3H:1 V OR GREATER. ANCHOR FABRIC WITH SOD STAPLES <br />AND LANDSCAPE PLANS 11 <br />AND PROVIDE 4 OVERLAP. TRENCH EDGES OF FABRIC TO <br />PREVENT UNDERCUT. COVER WITH 4" DEPTH SHREDDED HARDWOOD MULCH <br />THROUGHOUT. <br />FINISH GRADE <br />36" DEPTH PLANTING SOIL MIX, UNCOMPACTED IN 6" LIFTS <br />3:1 3' 1 AND TILL 6" DEPTH INTO NATIVE SOILS. <br />12", OR PER PLAN -70% SAND, (5% PASSING THE #200 SIEVE, AND A <br />FINISH GRADE MAXIMUM OF 60% PASSING THE #40 SIEVE.) <br />-30% ORGANIC (PEAT MOSS, HYPNUM OR SPHAGNUM) <br />PRE-TREATMENT NOTES: <br />1. IF NO PRE-TREATMENT STORM STRUCTURE OR SUMP IS IDENTIFIED, <br />PROVIDE SEDIMENT BASIN AT ALL INLETS WITH RIP RAP. VERIFY BASIN <br />SLOPED SUBGRADE SIZE(3'X5'X1' DEEP MIN.) AND RIP RAP TYPE PER PLAN, AND/OR WITH <br />ENGINEER/LANDSCAPE ARCHITECT. <br />6" PVC SLOTTED DRAINTILE, <br />ELEVATION MAY VARY IN AGGREGATE <br />COARSE FILTER AGGREGATE(MnDOT 3149.2H) <br />GEOTEXTILE FABRIC -POROUS FILTER FABRIC, 12" DIA. MIN. <br />FINISH GRADE L <br />3:1 <br />3/:1 <br />DRAINTILE/OVERFLOW SECTION <br />Westwood <br />Phone (952) 937-5150 7699 Anagram Drive <br />Fax (952) 937-5822 Eden Prairie, MN 55344 <br />Toll Free (888) 937-5150 westwoodps.com <br />Westwood Professional Services, Inc. <br />DRAINTILE WITH POSITIVE DRAINAGE, CONNECT TO <br />STORM SEWER OR DAYLIGHT <br />OVERFLOW STORM SEWER MANHOLE OR CATCH BASIN. <br />SEE STORM SEWER PLAN <br />DRAINTILE VALVE IN STORM STRUCTURE, NORMALLY CLOSED, <br />AS INDICATED ON PLAN <br />TYPICAL RAINGARDEN DETAIL <br />I hereby certify that this plan was prepared by me or under my Revisions. <br />direct supervision and that I am a duly licensed PROFESSIONAL <br />ENGINEER under laws of the State of Minnesota 08/07/17 - City Comments <br />03/20/18 - Final Development Approval Plans <br />05/30/18 - City Com ments/Storm water <br />07/11/18 - Watershed Comments <br />Ryan M. Bluhm 08/06/18 - City/Watershed Comments <br />08/08/18 -City Comments <br />Date 08/08/18 Liaenn No. 41257 <br />NOTES: <br />LAST REl9SED: LAST REl/ISED: <br />07119116�VgeilltWoodj MODULAR BLOCK RETAINING WALL 03131110 <br />S115 -C S134 -C <br />1. NO CONSTRUCTION EQUIPMENT SHALL TRAVEL WITHIN THE INFILTRATION BASIN <br />AREA. USE EXCAVATOR WITH TOOTHED BUCKET FOR INFILTRATION BASIN <br />EXCAVATION TO AVOID COMPACTING OR SMEARING OF SOILS. <br />2. FINAL EXCAVATION OF THE INFILTRATION BASIN AND <br />INSTALLATION/INCORPORATION OF SOIL -MEDIA MIX MUST OCCUR IN DRY SOIL <br />CONDITIONS TO PREVENT SMEARING AND COMPACTION. DO NOT WORK IN <br />INFILTRATION BASIN IF SOIL CONDITIONS ARE WET. <br />3. 48 -HOURS PRIOR TO INFILTRATION BASIN OVER -EXCAVATION, THE <br />CONTRACTOR SHALL NOTIFY THE OWNER (OR OWNER'S REPRESENTATIVE), THAT <br />OVER -EXCAVATION WILL BE OCCURRING, TO INSPECT PRIOR TO SOIL MEDIA <br />PLACEMENT, AND TO VERIFY THAT EXPECTED SUB -SOIL INFILTRATION RATES WILL <br />BE ACHIEVED. CONTRACTOR TO PROVIDE INFILTRATION TESTING, ONLY AS REQUIRED. <br />4. CARE MUST BE TAKEN TO AVOID CONTAMINATION OF SOIL MEDIA MIX WITH <br />SEDIMENT, IN-SITU OR TOPSOIL DURING AND AFTER INSTALLATION. MATERIALS MUST <br />BE SEGREGATED. <br />5. AFTER OVER -EXCAVATION, AND PRIOR TO PLACEMENT OF SOIL MEDIA MIX, <br />USE FROST RIPPER TO DEEPLY LOOSEN SUB -SOILS TO A MINIMUM DEPTH OF 24", <br />BEFORE BACK -FILLING WITH SOIL MEDIA MIX. UPON PLACEMENT OF SOIL MEDIA MIX, <br />INCORPORATE/RIP SOIL MEDIA MIX INTO THE LOOSENED UNDERLYING SOILS A <br />MINIMUM DEPTH OF 6". <br />6. USE EXCAVATOR BUCKET TO PLACE SOIL -AMENDMENT - DO NOT USE LOADER <br />WITHIN THE BASIN TO EXCAVATE OR PLACE SOIL AMENDMENT. LEVELING AND FINAL <br />GRADING WITHIN THE BIORETENTION BASINS MUST BE COMPLETED BY HAND. <br />7. IMMEDIATELY FOLLOWING BASIN CONSTRUCTION, THE BOTTOM AND SIDE SLOPES <br />OF THE BASIN SHALL BE FULLY STABILIZED. TEMPORARY SILT FENCE SHALL BE <br />INSTALLED AT THE TOP OF THE INFILTRATION BASIN SIDE -SLOPE AND AS REQUIRED <br />AT THE BOTTOM OF THE SIDE -SLOPE OF THE INFILTRATION BASIN PERIMETER. <br />EROSION CONTROL BLANKET ALONG SIDES AND BOTTOM. TEMPORARY EROSION <br />CONTROL TO REMAIN UNTIL THE DRAINAGE AREA IS STABILIZED WITH FINAL <br />IMPROVEMENTS. <br />8. INFILTRATION RATE OF RAIN GARDEN TO BE DRY WITHIN 48 HOUR PERIOD. <br />9. SEE LANDSCAPE PLAN FOR ADDITIONAL INFO ON MULCH AND PLANTINGS. <br />10. CONTRACTOR SHALL SUBMIT PRODUCT INFO/SAMPLE FOR APPROVAL PRIOR TO <br />INSTALLATION INVOLVING: SOIL, DRAINTILE, AGGREGATE, FILTER FABRIC, AND <br />EROSION CONTROL FABRIC. <br />N.T.S. <br />LAST REVISED: <br />06/05/15 <br />LA22 <br />RMB Prepared for: Apex HLLC <br />Checked: RMB <br />Drawn: sYE 2110 Lyndale Avenue South Suite C <br />Record Drawing by�date: Minneapolis, MN 55405 <br />20' <br />TRENCH DRAIN <br />RE=1016.90 <br />N <br />SLOPE <br />12" STM A <br />A . ° . ' • ° ° <br />LONGITUDINAL SECTION <br />BUILDING FACE NEENAH R -4990 -CX <br />TYPE C GRATE <br />MAX.3/16" <br />GAP BITUMINOUS <br />42" 12" 42" <br />SLOPE SLOPE <br />7EL.A ♦♦4d °d a °1Q d <br />12" STM VARIES ° m CONC. PAVING <br />• A <br />CROSS SECTION <br />LAST REVISED: <br />Westwood TRENCH DRAIN 021915 <br />STXX <br />Orono Senior <br />Housing <br />Orono, Minnesota <br />0011740DTPOl .dwg <br />Date: 06/19/17 Sheet- 8 of 13 <br />Civil Details <br />CLASS III <br />d50=9' <br />9" <br />Dia. <br />18' <br />Depth <br />Round <br />L <br />Depth <br />Granula <br />Pipe <br />Riprap <br />Fllter <br />(In.) <br />(Ft.) <br />(Cu. Yd.) <br />12 <br />8 <br />4.1 <br />2.1 <br />15 <br />8 <br />4.4 <br />2.2 <br />18 <br />10 <br />5.9 <br />3.0 <br />21 <br />10 <br />6.3 <br />3.2 <br />24 <br />12 <br />8.3 <br />4.2 <br />27 <br />12 <br />8.7 <br />4.4 <br />30 <br />14 <br />10.9 <br />5.5 <br />36 <br />16 <br />13.8 <br />6.9 <br />42 <br />18 <br />16.3 <br />8.2 <br />48 <br />20 <br />19.4 <br />9.7 <br />9" MIN. <br />BITUMINOUS PAVEMENT <br />CL. 5 AGGREGATE <br />GRAN. SUBBASE <br />•� 4" PERFORATED PVC PIPE SDR 35 <br />W/ FABRIC SOCK <br />GROUT INSIDE & OUTSIDE <br />OF CATCH BASIN <br />4 NOTE: TYPICAL LENGTH = 50 L.F. <br />L CATCH BASIN <br />PLAN TYPICAL STREET SECTION <br />1.0' 1O CLASS III <br />CLASS III RIPRAP <br />3' 2' RIPRAP WEAR <br />BASE <br />1.0' 1O CL. 5 AGG. BASE <br />GEOTEXTILE FABRIC <br />MNDOT 3733, TYPE IV o a; o•oo a; o•oo a; o•o� o•o�o; o•o� <br />.o o a- .a <br />GEOTEXTILE FABRIC MNDOT <br />MIN <br />3733, <br />3733, TYPE IV. SEC, A -A SECTION B -B "t -VARIES <br />8" 8' <br />NOTE: --- - - O FOR PIPES GREATER OR EQUAL TO 30", USE 1.5'. <br />2. THE CONTRACTOR SHALL PLACE RIP RAP, PULVERIZED TOPSOIL, SEED AND WOODFIBER 4" PERF. PVC PIPE SDR 35 <br />BLANKET IMMEDIATELY AFTER PIPE IS INSTALLED, EXTEND AREA TO MATCH UNDISTURBED GRANULAR SUBBASE <br />SOIL. MIRAFI 140-S <br />O DIMENSION "E" EQUALS INSIDE WIDTH OF APRON. PEA ROCK OR WASHED FILTER FABRIC SOCK <br />4. RIP RAP SHALL BE CLASS 3 SIZE UNLESS OTHERWISE NOTED ON PLANS. GRAVEL IN THIS AREA <br />RIP -RAP AT RCP LA03 03ST V08D. LA03 03ST V08D <br />Nestwood OUTLETS Westwood FINGER DRAIN <br />ST05 ST08 <br />HANDICAP PARKING <br />SPACE WITH PAINTED NOTE: BOTTOM OF <br />INTERNATIONAL SYMBOL SIGNS TO BE <br />8' 8' 8' OF ACCESSIBILITY WITH MOUNTED 60"-66" <br />MIN. MIN. MIN CONTRASTING SQUARE FROM PARKING GRADE, CAP UNIT, ADHERED TO <br />BACKGROUND, CENTERED l(\./. SEE SIGN POST SWALE AT TOP OF WALL TOP COURSE WITH <br />TOWARD DRIVE AISLE INSTALLATION DETAIL MAY BE REQUIRED, VERIFY ADHESIVE <br />w l Nn� NO PARKING SIGN PARKING <br />MIN T 5' MIN. 5" 0O ® `0N� CENTERED AT HEAD OF VEHICLE <br />HANDICAP PARKING ANCHORING PINS(AS REQUIRED) <br />SPACE ON CENTER <br />PARRYLAN o� MIN. AERJPLAN MIN. Ldv STRIPE REQUIRED SIGN, 12'X18", OR 8" MIN. LOW PERMEABLE SOIL <br />PLAN VIEW OF DIAGONAL RAMP PLAN VIEW OF PERPENDICULAR RAMP HANDICAP SIGN UP TO $200 FINE PER LOCAL CODE CONCRETE MODULAR <br />CENTERED AT HEAD FOR VIOLATION III-III=1 - BLOCK <br />CURB FACE OR RAMP LANDING HANDICAP VAN <br />OF SPACE ON CENTER <br />GUTTER 5'-4" MIN. 4' MIN. ACCESSIBLE PARKING =III -1' 1" - 1 1/4" <br />STRIPE VAN FILTER FABRIC it <br />59• APPROACH _ ACCESSIBLE SIGN, 12'X6'; OR PER <br />SLOPE MAX i HANDICAP PARKING LOCAL CODE, 8 FINISHED GRADE _ <br />RETAINED SOIL CD <br />RAMP 8.33q RAMP ACCESS AISLE WITH AS APPLICABLE N - <br />SEE NOTE #4 MAX. SLOPE � AR° PAINTED 12" HIGH HANDICAP o = <br />. iPARKING UNIT DRAINAGE FILL <br />1/2" PREFORMED JOINT CONCRETE WALK uv LETTERING OF 'NO SIGN 1=III=III=III=III=III= - - <br />FILLER MATERIAL SECTION A -A PARKING" CENTERED (3/4" CRUSHED 111-1111111 <br />ROCK OR STONE) L,. - -III-III-III-III-III-III-III-III <br />6" HEIGHT MAX. SIDE FLARE ROUND ALL SLOPED NOTE. SEE PLAN FOR TOWARD DRIVE AISLE 50 �1 -11 II itll III-III-III-IIT=Ii1=1�1- <br />107 MAX. SLOPE INTERSECTIONS PARKING LAYOUT APPROXIMATE LIMITS -111 UNREINFORCED CONCRETE OR <br />OF EXCAVATION <br />4" WIDE PAINTED 10" DIAMETER CENTER CRUSHED STONE LEVELING PAD <br />5' MIN. 4' MIN. 5' MIN. n STRIPING, 45 DEGREE SYMBOL IN PARKING <br />�Ni>avJJJa CROSS HATCH STALL, ALL LINES 4" PERFORATED PVC DRAINAGE TILE NOTE: CONTRACTOR TO <br />SIDE FLARE RAMP SIDE FLARE ® ON�� PATTERN AT 2' 0. C. TO BE 5" WIDE. WRAPPED IN FILTER FABRIC, PROVIDE ENGINEERING AND <br />NOTES; ELEVATION OF RAMP AT ACCESS AISLE N TO DAYLIGHT OR STORM SYSTEM, FOUNDATION SOIL SHOP DRAWINGS IF WALL IS <br />1. PROVIDE A RELATIVELY FLAT MINIMUM 4'x4' LANDING BEHIND THE PEDESTRIAN RAMP, 2% MAXIMUM FACE OF CURB AS REQUIRED GREATER THAN 4 FEET TALL. <br />CROSS SLOPE BOTH DIRECTIONS. CONTRACTOR TO SUBMIT WALL <br />2. CURB RAMP AREA TO BE CONCRETE AND MEET LATEST ADA REQUIREMENTS. RAMP CROSS SLOPE 2% SIDEWALK _ BLOCK TYPE, SIZE, AND COLOR <br />MAXIMUM. BACK-TO-BACK PEDESTRIAN RAMPS SHALL HAVE MINIMUM 48" LANDING BETWEEN, OR �I FOR APPROVAL. <br />PROVIDE AT -GRADE CROSSING. <br />3. SIDE FLARES TO BE CONCRETE AND IMPLEMENTED WHERE ADJACENT TO PAVED AREAS. FLARED 4 <br />SLOPE TO BE 10% MAXIMUM. EXISTING CURB RAMP ALTERATIONS, WITH NO LANDING, SHALL BE HANDICAP SIGN <br />8.33% MAXIMUM. PROVIDE 10% MAXIMUM SLOPE, UNLESS NOTED OTHERWISE. CENTERED AT HEAD <br />4. ANY VERTICAL LIP THAT OCCURS AT THE FLOW LINE MAY NOT BE GREATER THAN 1/4 INCH. NO TE: STRIPING TO <br />5. RAMP AND FLARED SIDE SURFACE TO BE MEDIUM BROOM FINISH, PERPENDICULAR TO TRAVEL PATH. MATCH PARKING, OF SPACE, 2' MIN. <br />6. LANDING AND RAMP AREA IS CONSIDERED AS CONCRETE WALK, AND TRUNCATED DOME AREA IS UNLESS PER LOCAL AND 8' MAX. FROM <br />INCIDENTAL, UNLESS NOTED OTHERWISE. CODE FACE OF CURB <br />HANDICAP HANDICAP <br />PARKING SYMBOL <br />LAST REl/ISED: LAST REVISED: <br />PAVEMENT SECTIONS 1110,3115 Westwood PRIVATE PEDESTRIAN CURB RAMP 01131112 VVestvvood HANDICAP ACCESSIBLE SIGNAGE <br />SI19 SI09-CP AND STRIPING <br />VARIES, SEE GRADING ANTI-WASH/GEOJUTE EROSION CONTROL FABRIC(MN/DOT 3883, TYPE 2) <br />ON SIDESLOPES OF 3H:1 V OR GREATER. ANCHOR FABRIC WITH SOD STAPLES <br />AND LANDSCAPE PLANS 11 <br />AND PROVIDE 4 OVERLAP. TRENCH EDGES OF FABRIC TO <br />PREVENT UNDERCUT. COVER WITH 4" DEPTH SHREDDED HARDWOOD MULCH <br />THROUGHOUT. <br />FINISH GRADE <br />36" DEPTH PLANTING SOIL MIX, UNCOMPACTED IN 6" LIFTS <br />3:1 3' 1 AND TILL 6" DEPTH INTO NATIVE SOILS. <br />12", OR PER PLAN -70% SAND, (5% PASSING THE #200 SIEVE, AND A <br />FINISH GRADE MAXIMUM OF 60% PASSING THE #40 SIEVE.) <br />-30% ORGANIC (PEAT MOSS, HYPNUM OR SPHAGNUM) <br />PRE-TREATMENT NOTES: <br />1. IF NO PRE-TREATMENT STORM STRUCTURE OR SUMP IS IDENTIFIED, <br />PROVIDE SEDIMENT BASIN AT ALL INLETS WITH RIP RAP. VERIFY BASIN <br />SLOPED SUBGRADE SIZE(3'X5'X1' DEEP MIN.) AND RIP RAP TYPE PER PLAN, AND/OR WITH <br />ENGINEER/LANDSCAPE ARCHITECT. <br />6" PVC SLOTTED DRAINTILE, <br />ELEVATION MAY VARY IN AGGREGATE <br />COARSE FILTER AGGREGATE(MnDOT 3149.2H) <br />GEOTEXTILE FABRIC -POROUS FILTER FABRIC, 12" DIA. MIN. <br />FINISH GRADE L <br />3:1 <br />3/:1 <br />DRAINTILE/OVERFLOW SECTION <br />Westwood <br />Phone (952) 937-5150 7699 Anagram Drive <br />Fax (952) 937-5822 Eden Prairie, MN 55344 <br />Toll Free (888) 937-5150 westwoodps.com <br />Westwood Professional Services, Inc. <br />DRAINTILE WITH POSITIVE DRAINAGE, CONNECT TO <br />STORM SEWER OR DAYLIGHT <br />OVERFLOW STORM SEWER MANHOLE OR CATCH BASIN. <br />SEE STORM SEWER PLAN <br />DRAINTILE VALVE IN STORM STRUCTURE, NORMALLY CLOSED, <br />AS INDICATED ON PLAN <br />TYPICAL RAINGARDEN DETAIL <br />I hereby certify that this plan was prepared by me or under my Revisions. <br />direct supervision and that I am a duly licensed PROFESSIONAL <br />ENGINEER under laws of the State of Minnesota 08/07/17 - City Comments <br />03/20/18 - Final Development Approval Plans <br />05/30/18 - City Com ments/Storm water <br />07/11/18 - Watershed Comments <br />Ryan M. Bluhm 08/06/18 - City/Watershed Comments <br />08/08/18 -City Comments <br />Date 08/08/18 Liaenn No. 41257 <br />NOTES: <br />LAST REl9SED: LAST REl/ISED: <br />07119116�VgeilltWoodj MODULAR BLOCK RETAINING WALL 03131110 <br />S115 -C S134 -C <br />1. NO CONSTRUCTION EQUIPMENT SHALL TRAVEL WITHIN THE INFILTRATION BASIN <br />AREA. USE EXCAVATOR WITH TOOTHED BUCKET FOR INFILTRATION BASIN <br />EXCAVATION TO AVOID COMPACTING OR SMEARING OF SOILS. <br />2. FINAL EXCAVATION OF THE INFILTRATION BASIN AND <br />INSTALLATION/INCORPORATION OF SOIL -MEDIA MIX MUST OCCUR IN DRY SOIL <br />CONDITIONS TO PREVENT SMEARING AND COMPACTION. DO NOT WORK IN <br />INFILTRATION BASIN IF SOIL CONDITIONS ARE WET. <br />3. 48 -HOURS PRIOR TO INFILTRATION BASIN OVER -EXCAVATION, THE <br />CONTRACTOR SHALL NOTIFY THE OWNER (OR OWNER'S REPRESENTATIVE), THAT <br />OVER -EXCAVATION WILL BE OCCURRING, TO INSPECT PRIOR TO SOIL MEDIA <br />PLACEMENT, AND TO VERIFY THAT EXPECTED SUB -SOIL INFILTRATION RATES WILL <br />BE ACHIEVED. CONTRACTOR TO PROVIDE INFILTRATION TESTING, ONLY AS REQUIRED. <br />4. CARE MUST BE TAKEN TO AVOID CONTAMINATION OF SOIL MEDIA MIX WITH <br />SEDIMENT, IN-SITU OR TOPSOIL DURING AND AFTER INSTALLATION. MATERIALS MUST <br />BE SEGREGATED. <br />5. AFTER OVER -EXCAVATION, AND PRIOR TO PLACEMENT OF SOIL MEDIA MIX, <br />USE FROST RIPPER TO DEEPLY LOOSEN SUB -SOILS TO A MINIMUM DEPTH OF 24", <br />BEFORE BACK -FILLING WITH SOIL MEDIA MIX. UPON PLACEMENT OF SOIL MEDIA MIX, <br />INCORPORATE/RIP SOIL MEDIA MIX INTO THE LOOSENED UNDERLYING SOILS A <br />MINIMUM DEPTH OF 6". <br />6. USE EXCAVATOR BUCKET TO PLACE SOIL -AMENDMENT - DO NOT USE LOADER <br />WITHIN THE BASIN TO EXCAVATE OR PLACE SOIL AMENDMENT. LEVELING AND FINAL <br />GRADING WITHIN THE BIORETENTION BASINS MUST BE COMPLETED BY HAND. <br />7. IMMEDIATELY FOLLOWING BASIN CONSTRUCTION, THE BOTTOM AND SIDE SLOPES <br />OF THE BASIN SHALL BE FULLY STABILIZED. TEMPORARY SILT FENCE SHALL BE <br />INSTALLED AT THE TOP OF THE INFILTRATION BASIN SIDE -SLOPE AND AS REQUIRED <br />AT THE BOTTOM OF THE SIDE -SLOPE OF THE INFILTRATION BASIN PERIMETER. <br />EROSION CONTROL BLANKET ALONG SIDES AND BOTTOM. TEMPORARY EROSION <br />CONTROL TO REMAIN UNTIL THE DRAINAGE AREA IS STABILIZED WITH FINAL <br />IMPROVEMENTS. <br />8. INFILTRATION RATE OF RAIN GARDEN TO BE DRY WITHIN 48 HOUR PERIOD. <br />9. SEE LANDSCAPE PLAN FOR ADDITIONAL INFO ON MULCH AND PLANTINGS. <br />10. CONTRACTOR SHALL SUBMIT PRODUCT INFO/SAMPLE FOR APPROVAL PRIOR TO <br />INSTALLATION INVOLVING: SOIL, DRAINTILE, AGGREGATE, FILTER FABRIC, AND <br />EROSION CONTROL FABRIC. <br />N.T.S. <br />LAST REVISED: <br />06/05/15 <br />LA22 <br />RMB Prepared for: Apex HLLC <br />Checked: RMB <br />Drawn: sYE 2110 Lyndale Avenue South Suite C <br />Record Drawing by�date: Minneapolis, MN 55405 <br />20' <br />TRENCH DRAIN <br />RE=1016.90 <br />N <br />SLOPE <br />12" STM A <br />A . ° . ' • ° ° <br />LONGITUDINAL SECTION <br />BUILDING FACE NEENAH R -4990 -CX <br />TYPE C GRATE <br />MAX.3/16" <br />GAP BITUMINOUS <br />42" 12" 42" <br />SLOPE SLOPE <br />7EL.A ♦♦4d °d a °1Q d <br />12" STM VARIES ° m CONC. PAVING <br />• A <br />CROSS SECTION <br />LAST REVISED: <br />Westwood TRENCH DRAIN 021915 <br />STXX <br />Orono Senior <br />Housing <br />Orono, Minnesota <br />0011740DTPOl .dwg <br />Date: 06/19/17 Sheet- 8 of 13 <br />Civil Details <br />