Laserfiche WebLink
Streets <br />Project <br />Department <br />Description <br />Description/ Scope <br />Operating <br />CIP Amount <br />Funding source <br />Number <br />Engineering <br />Budget <br />Management Fund <br />19-001 <br />Streets <br />2019 Streets <br />Forest Arm Lane—Reconstruction with drainage improvements <br />$ 1,501,933 <br />Pavement Fund <br />East Long Lake Road — Reclamation and drainage improvements <br />Stormwater Fund <br />Tonkaview Lane - Reclamation with drainage improvements <br />Sanitary Fund <br />Chevy Chase Drive- Mill and overlay, reclamation and reconstruction with drainage improvements <br />Water Fund <br />19-002 <br />Streets <br />Ferndale Road N Mill and Overlay <br />Mill and overlay pavement and repair storm sewer. Shared MSA road with Plymouth. <br />$ 125,000 <br />Financing from <br />Plymouth <br />Stormwater Fund <br />19-003 <br />Streets <br />2019 Preventive Street Maintenance <br />Select streets shall have their cracks routed, cleaned and sealed. Spot sealing will be required on areas <br />$ 50,000 <br />Pavement Fund <br />with a concentration of small cracks. <br />19-004 <br />Streets <br />Annual Sign Inspection and <br />This activity includes the inspection all of the street signs in maintenance area 1. Damaged and failing <br />$ 17,400 <br />Streets Operating <br />Maintenance -2019 -Dist 1 <br />signs will be replaced in accordance the Traffic management policy and the Sigh Retro -reflectivity Policy. <br />Budget <br />19-005 <br />Streets <br />Right of Way Tree Trimming -2019 <br />Tree trimming and stump removals within the rights of way <br />$ 17,000 <br />Streets Operating <br />Budget <br />19-006 <br />Streets <br />2019-2020 Snow and Ice removal / <br />Annual Snow and Ice Removal. Performed in accordance with the Snow and Ice Policy <br />$ 120,000 <br />Streets Operating <br />treat <br />Budget <br />19-007 <br />Streets <br />Spring Street Sweeping <br />Spring Street Sweeping <br />$ 13,000 <br />Streets Operating <br />Budget <br />19-008 <br />Streets <br />Fall Street Sweeping <br />Fall Street Sweeping <br />$ 13,000 <br />Streets Operating <br />Budget <br />19-009 <br />Streets <br />2019 Road Patching <br />Reactive Street maintenance including in house and contracted patching. <br />$ 15,000 <br />$ 50,000 <br />Pavement Fund <br />19-010 <br />Streets <br />2019 ROW Mowing <br />Mowing of select potions of the ROW. <br />$ 10,000 <br />Streets Operating <br />Budget <br />19-011 <br />Streets <br />Light Pole Decorations -2019 <br />Light pole decorations for 2019-HolidayLights, Banners and Flags <br />$ 2,000 <br />Streets Operating <br />Budget <br />20-001 <br />Streets <br />2020 Street Project Design and <br />Prepare engineering plans for 2020 Streets projects <br />$ 135,000 <br />Pavement <br />Engineering <br />Management Fund <br />