My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-26-2018 Council Packet
Orono
>
City Council
>
2018
>
11-26-2018 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2019 2:00:32 PM
Creation date
5/23/2019 1:56:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br /> <br />Prepared By: Reviewed By: Approved By: DJR <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1. Purpose. The purpose of this item to gain council approval of the East Long Lake Trail Concept <br />Plan. <br /> <br />2. Background. At the May 29th, 2018 meeting, the City Council directed staff and the Parks <br />Commission to develop a plan for the conversion of northern section East Long Lake Road to a trail. At <br />the July 2nd Parks Commission meeting, the Commission established a special committee to develop a <br />plan. Bolton and Menk was selected by the city to provide landscape architect planning consultation for <br />the project. That committee, city staff and our consultant have held several meetings and developed a <br />concept plan for the trial. The Parks commission reviewed the plan and endorsed it at their November 5th <br />meeting. <br /> <br />3. Scope of Work. The project would convert the existing roadway to a bike trail. This will include the <br />removal of the existing asphalt, stabilizing the lakeshore where required, construction of a 10ft wide <br />multipurpose trail and adding some amenities such as benches, rock fishing points, a dock, and <br />interpretive signage. See Exhibit A for the concept layout. <br /> <br />4. Coordination to Date. To date the committee has met twice to review the draft plan, Staff has <br />coordinated with Three Rivers Park District, Hennepin County, Minnehaha Creek Watershed District and <br />MN DNR. There are two key partnering opportunities with this project: one; since the project is located <br />on a designated regional route regional funding is available and two; the 900 Old Long Lake parcel that <br />abuts the project area is due to be included in the Woodrill SNA by 2020 providing possible collaboration <br />opportunities with the MN DNR. <br /> <br />5. Public Comment. The plan was posted on the city website for public comment in October with a <br />mailing sent to those property owners in the vicinity of the project. A listing of comments received is <br />provided in Exhibit C. The general comments are supportive and encourage the City to maintain / restore <br />as many natural aspects of the corridor as possible. The majority of the specific comments are items that <br />the project is already incorporating or should be considered during detailed design work. Several Spring <br />Hill road residents did provided concerns about parking on the north end of the trail. The plan current <br />envisions 1-2 spots within the exiting foot print. <br /> <br />6. Cost And Funding. The probable cost based on the concept layout is $347K. See Exhibit B. The <br />intent is to fund a significant portion of the project with grants. The concept plan, once approved will be <br />used for the solicitation of those grants. The portions of the cost borne by the city will be funded by the <br />City’s Stormwater Fund and Park Funds. The City will be applying for the Hennepin County Trail Grant, <br />the DNRs Local Trails Connection Program, and have requested inclusion on the Three Rivers Parks <br />District CIP for 2020. <br /> <br />7. Way Forward. Once approved, the concept plan will be used to seek grants, funding and secure <br />partnerships with other agencies. Once funding is secured then we will complete detailed design with a <br />goal of constructing in 2020. <br /> <br /> <br /> <br /> <br />Item No.: 8 Date: November 26, 2018 <br />Item Description: East Long Lake Trial Master/ Concept Pan. <br />Presenter: Adam T. Edwards <br />Public Works Director/City Engineer <br />Agenda <br />Section: <br />Public Works/City <br />Engineer Report
The URL can be used to link to this page
Your browser does not support the video tag.