Laserfiche WebLink
FILE # LA18-000062 <br />22 Jan 2019 <br />Page 3 of 4 <br /> <br />by the Minnehaha Creek Watershed District. <br /> <br />Private, Shared Driveway. The property is proposed to be served via a private driveway <br />accessing Orono Orchard Road South at the northern point of “Parcel A” and meeting up with <br />the existing drive. The driveway will be expanded to serve “Parcel B” and an access easement <br />should be established for each of proposed lots; a maintenance agreement for the private <br />driveway should also be provided by the developer. A maximum of two lots can be served via a <br />private driveway. <br /> <br />Park Dedication <br />The Comprehensive Plan does not suggest the need for new trails or sidewalks along this section <br />of Orono Orchard Road. There are no plans for future park land needs on the subject property, <br />staff anticipates park dedication being satisfied via a cash donation. The Park Fee is determined <br />as 8% of the fair market value of the land being subdivided, but must be between a minimum of <br />$3,250 and a maximum of $5,550 per residential dwelling unit. For the proposed development, <br />the Park Fee would be based only on the one newly created lot. The City’s Assessor will be <br />consulted to determine the market value of the land for establishing the amount of the fee. <br /> <br />Stormwater and Drainage Improvements <br />The developer should coordinate with the MCWD and provide confirmation regarding the <br />permits or approvals they will require for this subdivision. According to the Anderson <br />Engineering report, conservation easements will protect the wetland buffer areas as required by <br />the MCWD. Additionally, according to the report, there were to be two stormwater infiltration <br />basins installed, following MCWD approval of a stormwater plan, the grading plan should be <br />updated to reflect any necessary stormwater pond areas. Placement and sizing will be <br />determined by the Minnehaha Creek Watershed District Rules. <br /> <br />The development is subject to the 2019 Stormwater and Drainage Trunk Fee of $8,060.00 per <br />lot in a 2 acre zone. Therefore $8,060 x 2 lots = $16,120.00. <br /> <br />Utility Locations and Availability <br />The subject property is not located within the Metropolitan Urban Service Area (MUSA). <br />Therefore City sewer is not available to the property. They have provided septic system designs <br />for each of the lots which appear to be acceptable. The plans will be reviewed more closely at <br />permitting by the Building Official for conformance with the regulations. <br /> <br />Planning Staff Recommendation <br />Staff recommends approval in accordance with the forthcoming recommendations of the City <br />Engineer as well as the requirements of the MCWD. The Planning Commission’s options for <br />action on the proposed plat are: <br />• Recommend approval of the plat as presented, with appropriate conditions; <br />• Recommend denial, stating reasons; or <br />• Table the application providing direction and guidance to the developer. <br /> <br />List of Exhibits <br />Exhibit A. Preliminary Plat Drawing 12/07/18 <br />Exhibit B. Proposed preliminary grading plan 12/07/18