Laserfiche WebLink
<br /> <br /> Minimum Requirement Checklist <br /> City of Orono <br />Page 9 <br /> <br />Copy of any intercommunity service agreements <br />entered into with an adjoining community after <br />December 31, 2008; including a map of areas <br />covered by the agreement. <br />Appendix 4B-D <br />Copies of the associated National Pollutant <br />Discharge Elimination System (NPDES) or State <br />Disposal System (SDS) permits. <br />MS4 permit provided as <br />Appendix 4B-C <br /> <br />An electronic map or maps (GIS shape files or <br />equivalent must also be submitted) that show the <br />following information: <br /> Your existing sanitary sewer system identifying lift <br />stations, existing connection points to the <br />metropolitan disposal system, and future connection <br />points. <br /> Local sewer service districts by connection point. <br /> Intercommunity connections and any proposed <br />changes in government boundaries based on Orderly <br />Annexation Agreements. <br /> The location of all private and public wastewater <br />treatment plants in your community. <br /> <br />Provided <br /> <br /> <br /> <br /> <br /> <br /> <br />N/A <br /> <br /> <br />N/A <br /> <br /> <br /> <br /> <br />Map 4B-3 <br /> <br />Map 4B-1 <br /> <br /> <br /> <br /> <br /> <br /> <br />Current subsurface sewage treatment system <br />ordinance Appendix 4B-A <br />A table or tables that contain the following <br />information: <br /> Capacity and design flows for existing trunk sewers <br />and lift stations. <br /> Assignment of 2040 growth forecasts by Metropolitan <br />interceptor facility. In the absence of this information <br />the Council will make its own assignments for the <br />purpose of system capacity needs determination. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Acknowledged <br /> <br />Table 4B-7 <br /> <br /> <br /> <br /> <br /> <br />Community and Subsurface Treatment Systems <br />A table that details the households and <br />employment forecasts in 10-year increments <br />through 2040, based on the Council’s forecasts and any subsequent negotiated modifications. This should be broken down by areas served by the Metropolitan Disposal System, locally owned and operated wastewater treatment systems, and Community and Subsurface sewage treatment systems. The forecasts used in your wastewater plan must be consistent with the forecasts used <br />throughout your plan, including in land use, <br />transportation, and water supply. <br /> Tables 4B- <br />4, 7