Laserfiche WebLink
CMP Part 4A. Transportation Plan <br /> <br /> <br />City of Orono Community Management Plan 2020-2040 Part 4A, Page 1 <br />TABLE OF CONTENTS CMP PART 4A <br /> <br />TRANSPORTATION PLAN <br /> <br />Introduction 4A-2 <br />Purpose and Scope 4A-2 <br />Roadways 4A-3 <br /> Table 4A-1 Roadways Classification Summary 4A-4 <br /> Table 4A-2 A Minor Arterials 4A-5 <br /> Table 4A-3 Collectors 4A-6 <br /> Table 4A-4 MSA Roads 4A-7 <br /> Table 4A-5 Road Design Capacity 4A-8 <br /> Table 4A-6 Road Capacity 4A-9 <br /> Fig. 4A-2 Ring Road Concept 4A-10 <br /> Table 4A-7 Future Capacity 4A-11 <br /> Fig 3 Access Curve 4A-11 <br /> Fig. 4 Maintenance/ Cost Curve 4A-12 <br /> Table 4A-8 Maintenance 4A-13 <br />Trails 4A-14 <br />Lake Access 4A-16 <br /> Table 4A-9 Lake Access Points 4A-17 <br />Transit 4A-20 <br />Freight 4A-20 <br />Aviation 4A-21 <br />Implementation Plan. 4A-21 <br /> Table 4A-10 Goals and Objectives 4A-22 <br /> Table 4A-11 Transportation History 4A-25 <br /> <br />Appendices <br />4A-A. TAZ Zones <br />Map 4A-1 Functional Classification <br />Map 4A-2 Jurisdiction Classifications <br />Map 4A-3 Traffic Analysis zones <br />Map 4A-4 Traffic and Crash Information <br />Map 4A-5 Forecasted Traffic Information <br />Map 4A-6 Non-motorized facilities and Points of Interest <br />Map 4A-7 Existing and Planned Transit Infrastructure <br />Map 4A-8 Freight, Rail, and Heavy Commercial Corridors