My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-28-2019 Council Packet
Orono
>
City Council
>
2019
>
01-28-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2019 10:23:53 AM
Creation date
5/23/2019 10:22:28 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SHEET <br />OF <br />DRAWN BY <br />11 <br />DESIGNED BY <br />CHECKED BY <br />NO DATE BY CKD APPR REVISION <br />Date License # <br />Print Name: <br />H <br />: <br />\ <br />P <br />r <br />o <br />j <br />e <br />c <br />t <br />s <br />\ <br />1 <br />1 <br />0 <br />0 <br />0 <br />\ <br />1 <br />1 <br />4 <br />0 <br />0 <br />\ <br />C <br />A <br />D <br />_ <br />B <br />I <br />M <br />\ <br />P <br />l <br />a <br />n <br />\ <br />1 <br />1 <br />4 <br />0 <br />0 <br />_ <br />l <br />n <br />d <br />0 <br />2 <br />. <br />d <br />g <br />n <br />1 <br />0 <br />/ <br />1 <br />8 <br />/ <br />2 <br />0 <br />1 <br />8 <br />1 <br />0 <br />: <br />1 <br />0 <br />: <br />3 <br />1 <br /> <br />A <br />M <br />...\CAD_BIM\Plan\11400_lnd02.dgn CITY PROJECT NO. X <br /> <br /> <br /> <br />X <br />COUNTY PROJECT NO. <br />X <br />STATE PROJECT NO. <br />X <br />X <br />STATE AID PROJECT NO. <br />the laws of the State of Minnesota. <br />that I am a duly Licensed Landscape Architect under <br />was prepared by me or under my direct supervision and <br />I hereby certify that this plan, specification, or report CITY OF ORONO <br />MICHAEL JISCHKE <br />JONATHAN FILLMORE <br />AMY ELIAS <br />MICHAEL JISCHKE <br />COMM. NO. 1140042191 <br />CSAH 112 PHASE 2 LANDSCAPE PLANS <br />ACCEPTABLE PLANT STOCK GROWING RANGE LIMITS <br />SOURCE: USDA PLANT HARDINESS ZONE MAP <br />o <br />o o <br />o <br />CANADA <br />ND <br />SD <br />NE <br />MN <br />IA <br />KS MO <br />IL IN <br />OH <br />MI <br />WI <br />MT <br />WY <br />CO <br />PA <br />NY <br />MINNESOTA ZONE WHERE THE PROJECT SITE IS LOCATED, AS FOLLOWS: <br />FOR ALL PLANT STOCK, DOCUMENT ACCEPTABILITY FOR HARDINESS IN THE <br />YEARS WITHIN THE ACCEPTABLE LIMITS SHOWN. <br />A.PLANT STOCK CONTINUOUSLY GROWN FOR AT LEAST THE LAST TWO <br />OR <br />ORIGINATING FROM THE ACCEPTABLE LIMITS SHOWN. <br />LIMITS, HAVING SEED SOURCE OR ROOT AND GRAFT STOCK <br />B.PLANT STOCK, GROWN OUTSIDE THE ACCEPTABLE GROWING RANGE <br />(MnDOT 3861.2C) <br />o o -26.1 TO -28.9 F5a <br />LAKE <br />L <br />A K <br />E <br />L <br />A <br />K <br />E <br />LAKE <br />LAKE <br />SUPERIOR <br />M <br />I C <br />H <br />I G <br />A N <br />H <br />U <br />R <br />O <br />N <br />ERIE <br />ONTANO4 <br />5a <br />5b <br />4 <br />3 <br />4 <br />2 <br />5a <br />ZONES LEGEND <br />UNACCEPTABLE ZONES <br />2 <br />1 <br />1 0 <br />L A K <br />E <br />W <br />I N <br />N <br />I P <br />E <br />G BAY <br />HUDSON <br />6 <br />6 <br />5b5b <br />5b and 6 <br />0, 1, 2, <br />PLANT INSTALLATION PERIOD <br />PROJECT LOCATION <br />FALL DECIDUOUS PLANTING DATES. <br />SPRING NO LATER THAN JUNE 1ST OR FOLLOW THE <br />1.BARE ROOT PERENNIALS MUST BE INSTALLED IN THE <br />ENGINEER. <br />SEASONAL CONDITIONS, AS DETERMINED BY THE <br />2.ACTUAL DATES MAY CHANGE DEPENDING UPON <br />CRABAPPLE, PLUM/CHERRY, OAKS, AND SUMAC. <br />HONEYLOCUST, BIRCH, MOUNTAIN ASH, MAPLE, WILLOW, <br />DOGWOOD, POPLAR, HACKBERRY, LINDEN, IRONWOOD, <br />FORM OF THE FOLLOWING SPECIES: HAWTHORN, <br />3.FALL PLANTING IS NOT ALLOWED FOR BARE ROOT <br />OF THE PLANT ESTABLISHMENT PERIOD. <br />DURING THE MONTH OF MAY DURING THE FIRST YEAR <br />4.ALL REPLACEMENT PLANTS MUST BE INSTALLED <br />4 <br />PLANTING DATES BY ZONE <br />KEY SPRING FALL <br />DECIDUOUS CONIFEROUS PERENNIALS SEEDLINGS DECIDUOUS CONIFEROUS <br />3 <br /> APRIL 21 APRIL 21 MAY 1 APRIL 21 OCT. 1 AUG. 25 <br />TO TO TO TO TO TO <br /> JUNE 1 JUNE 1 JUNE 15 JUNE 1 NOV. 1 SEPT. 15 <br /> APRIL 7 APRIL 7 MAY 1 APRIL 7 OCT. 10 AUG. 25 <br />TO TO TO TO TO TO <br /> JUNE 1 MAY 17 JUNE 15 MAY 17 NOV. 15 SEPT. 15 <br />3 <br />4 <br />(MnDOT 2571.3F2) <br />PLANTING SOIL (MnDOT 2571.3D2) <br />CUT <br />PRUNING <br />CORRECT <br />CLOSE <br />TOO <br />LONG <br />TOO <br />SLANTED <br />TOO <br />PRUNING <br />BRANCHES PRUNED TO LIVE BUD <br />BRANCHES PRUNED AT TRUNK <br />(SHIGO METHOD) <br />A A <br />(MnDOT 2571.3K2a9 and 2571.3E1) <br />SAW: <br />STEPS TO PRUNING WITH PRUNING <br />BRANCH AT POINT A. <br />1.CUT PART WAY THROUGH THE <br />BRANCH FROM POINT B TO A. <br />2.CUT COMPLETELY THROUGH <br />POINT C TO D. <br />3.AT BRANCH COLLAR CUT FROM <br />AFTER ONE SEASON OF GROWTH. <br />DISCONTINUOUS CALLUS FORMATION <br /> (TOO CLOSE) WILL RESULT IN <br />INCORRECT CUT FROM POINT C TO X <br />GROWTH. <br />FORMATION AFTER ONE SEASON OF <br />DOUGHNUT SHAPED CALLUS <br />WILL RESULT IN CONTINUOUS <br />THE STUB FROM POINT B TO A) <br />(LEAVING BRANCH COLLAR BUT NOT <br />CORRECT CUT FROM POINT C TO D <br />PRUNING NOTES: <br />OR PRUNING SAW. <br />SHARP SCISSOR-TYPE PRUNER <br />1.PRUNE USING CLEAN AND <br />EARLY SPRING. <br />LATE DORMANT SEASON OR <br />2.THE BEST TIME TO PRUNE IS <br />MAY, JUNE OR JULY. <br />3.AVOID PRUNING OAKS IN APRIL, <br />LATEX PAINT OR SHELLAC. <br />SURFACE OR WOUND WITH <br />JULY, IMMEDIATELY PAINT CUT <br />TREES IN APRIL, MAY, JUNE OR <br />IF WOUNDS OCCUR TO OAK <br />4.IF PRUNING IS NECESSARY OR <br />GENERAL NOTES <br />SEE SPECIAL PROVISIONS FOR SPECIFIC PROJECT REQUIREMENTS. <br />GENERAL REQUIREMENTS. <br />CONTRACT ADMINISTRATION MANUAL FOR MnDOT LANDSCAPE PROJECTS" FOR <br />REFER TO MnDOT SPECIFICATIONS 2571, 3861, AND THE "2016 INSPECTION AND <br />COMPLETE PREPARATORY WORK BEFORE STARTING INITIAL PLANTING OPERATIONS. <br />ACCEPT ALL PLANT STOCK IN ACCORDANCE WITH MnDOT 3861 PRIOR TO PLANTING. <br />OPERATIONS IN ACCORDANCE WITH (MnDOT 2571.3D2 STEP 4) <br />THE CONTRACTOR WILL DEMONSTRATE COMPETENCY FOR SOIL CULTIVATION <br />OPERATIONS IN ACCORDANCE WITH MnDOT 2571.3F1 <br />THE CONTRACTOR WILL DEMONSTRATE COMPETENCY FOR ALL PLANT INSTALLATION <br />PROTECTION <br />RODENT <br />FERTILIZER SEE SPECIAL PROVISIONS <br />COMPOST MnDOT 3890 GRADE 2 UNLESS OTHERWISE SPECIFIED. <br />MATERIAL <br />MULCH MnDOT 3882 TYPE 6 UNLESS OTHERWISE SPECIFIED. <br />BEDS <br />PLANTING <br />MASS <br />PREVENTION) <br />CRACK <br />(FROST <br />PAINTING <br />TREE <br />NO PAINTING OF TREE STEMS SHALL BE REQUIRED. <br />DIMENSIONS <br />PLANTING PLAN <br />STATED DIMENSIONS SUPERCEDE SCALING FROM PLAN. <br />2571.3G) <br />(MnDOT <br />GUIDELINES <br />WATERING PLANT TYPE WATER PER APPLICATION <br />AVERAGE GALLONS OF <br />TREES <br />MACHINE TRANSPLANTED <br />50-100 <br />TREES <br />BALLED AND BURLAPPED 20 <br />TREES <br />BARE ROOT AND CONTAINER <br />15 <br />SHRUBS <br />BALLED AND BURLAPPED 10 <br />SHRUBS <br />BARE ROOT AND CONTAINER <br />7 <br />WOODY SEEDLINGS 4 <br />PERENNIALS AND VINES 3 <br />REQUIREMENTS. <br />LEVELS. THE AMOUNTS LISTED ABOVE ARE GUIDELINES, NOT <br />MAINTAIN SOIL MOISTURE AT ADEQUATE BUT NOT EXCESSIVE <br />IT IS THE CONTRACTOR'S RESPONSIBILITY TO MONITOR AND <br />ZONES LEGEND MIN. TEMP. <br />3 <br />4 <br /> -34.4 TO -40 F <br /> -28.9 TO -34.4 F <br />ACCEPTABLE ZONES <br />QUEBEC <br />ONTARIO <br />SASKATCHEWAN <br />MANITOBA <br />B B <br />C C <br />D <br />D <br />X <br />LIVE BUD <br />BRANCH COLLAR <br />RIDGE <br />BRANCH BARK <br />BRANCH <br />DEAD <br />LIVE BRANCH <br />3 <br />SEE STANDARD PLANTING DETAILS. <br />DEFICIENCY IMMEDIATELY. MULCH ENTIRE MASS PLANTING BED. <br />NOTIFY ENGINEER OF GROSS PLANT QUANTITY SURPLUS OR <br />THE CENTER OF THE TREE TO THE CENTER OF THE SHRUB. <br />AROUND EACH CONIFER TREE. RADIUS WILL BE MEASURED FROM <br />SHRUBS AROUND EACH DECIDUOUS TREE AND 8' CLEAR RADIUS <br />UNLESS SPECIFIED OTHERWISE. PROVIDE 5' RADIUS CLEAR OF <br />FILL IN WITH REMAINING PLANTS. USE TRIANGULAR SPACING, <br />IN STAGGERED ROWS ON THE PERIMETER FIRST, THEN UNIFORMLY <br />LESS, UNLESS OTHERWISE SPECIFIED ON SHEETS. PLANT BEDS <br />PREPARE MASS PLANTING BEDS FOR PLANTS PLACED AT 8' OR <br />SEE SPECIAL PROVISIONS AND STANDARD PLANTING DETAILS. <br />1 6 <br />" <br />1 2 <br />" <br />9STANDARD PLANTING DETAILS <br />INPLACE CULTIVATED SOILS <br />THOROUGHLY MIXED WITH <br />SPECIFIES ADDITIVES <br />COMPOST AND OTHER <br />4 INCHES OF GRADE 2 <br />. <br />(Mn/DOT 2571.3B) <br />SOIL DEPTH <br />INPLACE <br />CULTIVATED <br />. <br />TO PLANTING <br />AMENDMENTS SHALL BE INCIDENTAL <br />COMPOST AND ANY OTHER SOIL <br />DETAIL IS INDICATED IN THE PLANS. <br />WHERE PLANTING SOIL REPLACEMENT <br />USE IN ALL PLANTING BEDS, EXCEPT
The URL can be used to link to this page
Your browser does not support the video tag.