Laserfiche WebLink
SHEET <br />OF <br />DRAWN BY <br />11 <br />DESIGNED BY <br />CHECKED BY <br />NO DATE BY CKD APPR REVISION <br />Date License # <br />Print Name: <br />H <br />: <br />\ <br />P <br />r <br />o <br />j <br />e <br />c <br />t <br />s <br />\ <br />1 <br />1 <br />0 <br />0 <br />0 <br />\ <br />1 <br />1 <br />4 <br />0 <br />0 <br />\ <br />C <br />A <br />D <br />_ <br />B <br />I <br />M <br />\ <br />P <br />l <br />a <br />n <br />\ <br />1 <br />1 <br />4 <br />0 <br />0 <br />_ <br />t <br />b <br />0 <br />1 <br />. <br />d <br />g <br />n <br />1 <br />0 <br />/ <br />1 <br />8 <br />/ <br />2 <br />0 <br />1 <br />8 <br />1 <br />0 <br />: <br />1 <br />0 <br />: <br />2 <br />5 <br /> <br />A <br />M <br />...\CAD_BIM\Plan\11400_tb01.dgn CITY PROJECT NO. X <br /> <br /> <br /> <br />X <br />COUNTY PROJECT NO. <br />X <br />STATE PROJECT NO. <br />X <br />X <br />STATE AID PROJECT NO. <br />the laws of the State of Minnesota. <br />that I am a duly Licensed Landscape Architect under <br />was prepared by me or under my direct supervision and <br />I hereby certify that this plan, specification, or report CITY OF ORONO <br />MICHAEL JISCHKE <br />JONATHAN FILLMORE <br />AMY ELIAS <br />MICHAEL JISCHKE <br />COMM. NO. 1140042191 <br />CSAH 112 PHASE 2 LANDSCAPE PLANS <br />2 <br />STATEMENT OF ESTIMATED QUANTITIES <br />STATEMENT OF ESTIMATED QUANTITIES AND CONSTRUCTION NOTES <br />CONSTRUCTION NOTES <br /> CONTACTSPROJECT <br /> DURING AND BEFORE BMPS CONTROL SEDIMENT AND PREVENTION EROSION THE OF MAINTENANCE ANDINSPECTION <br /> PERMANENT THE OF MAINTENANCE AND OPERATION TERM LONG FOR RESPONSIBLE IS COUNTY HENNEPINCONSTRUCTION. <br /> SYSTEM. MANAGEMENTSTORMWATER <br />AGENCY/ORGANIZATION NAME NUMBERPHONE <br /> NOTIFICATION: EMERGENCY HOUR 24MPCA <br /> NOTESCONSTRUCTION <br /> NOTES CONTROL SEDIMENT AND EROSION TEMPORARY AND ESTABLISHMENT TURFGENERAL <br /> AS DAYS 7 WITHIN ACCOMPLISHED BE CANNOT STABILIZATION TEMPORARY THAT EVENT THEIN <br /> THAT TIME SUCH UNTIL USED BE SHALL 1 METHOD STABILIZATION RAPID PLAN, THE ININDICATED <br /> ARE STABILIZATION RAPID THIS FOR COSTS ALL ACCOMPLISHED. BE CAN STABILIZATION PLANTHE <br />INCIDENTAL. <br /> WARRANT. CONDITIONS AS NEEDED BE MAY MEASURES CONTROL SEDIMENT / EROSIONADDITIONAL <br /> COUNTY THE BY ACCEPTANCE FINAL TO PRIOR DEBRIS ALL OF CLEANED BE SHALL SEWER STORMTHE <br /> INCIDENTAL. BE SHALL CLEANING SEWER STORM THE CITY.AND <br /> ACCOMPLISH TO NECESSARY BE WILL MOBILIZATIONS MULTIPLE THAT ADVISED IS CONTRACTORTHE <br /> BE WILL THIS ESTABLISHMENT. TURF AND STABILIZATION TEMPORARY ANDPERMANENT <br /> INCIDENTAL.CONSIDERED <br />THE PROJECT ENGINEER AND CONTRACTOR ARE RESPONSIBLE FOR INSTALLATION, <br />EROSION PREVENTION AND SEDIMENT CONTROL BMPS SHALL BE INSTALLED AS NECESSARY TO MINIMIZE <br />EROSION FROM DISTURBED SURFACES AND CAPTURE SEDIMENT ONSITE AND SHALL MEET <br />ALL LOCAL REQUIREMENTS. <br />ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED. <br />STREETS SHALL BE SWEPT CLEAN WITH A PICK UP STYLE STREET SWEEPER AS DEEMED NECESSARY BY THE ENGINEER. <br />THIS WILL BE PAID FOR BY THE HOUR AT THE CONTRACT UNIT PRICE FOR STREET SWEEPER (WITH PICKUP BROOM). <br />MINNESOTA POLLUTION CONTROL AGENCY <br />ALTERNATE SWEEPING SCHEDULE WILL BE REQUIRED PER NPDES PERMIT PART IV.C.6 <br />TRACKED SEDIMENT MUST BE REMOVED WITHIN 24 HOURS OF DISCOVERY OF TRACKING ONTO PAVED SURFACES. <br />THE HEIGHT AND/OR DEPTH OF THE DEVICE. <br />INLET PROTECTION DEVICES SHOULD BE REPAIRED WHEN THEY BECOME NON-FUNCTIONAL OR SEDIMENT REACHES 1/3 <br />IN THE FIELD, AND AS DEEMED NECESSARY BY THE EROSION CONTROL SUPERVISOR. <br />INLET PROTECTION SHALL BE PROVIDED FOR USE AS SHOWN IN THE PLANS, WHERE INDICATED BY THE ENGINEER <br />DAN SULLIVAN 651-757-2768 <br />651-649-5451 <br />800-422-0798 <br />ALL DISTURBED AREAS SHALL BE EITHER PERMANENTLY STABILIZED IN ACCORDANCE WITH THE PLANTING AND <br />TURF ESTABLISHMENT PLAN, OR SHALL BE TEMPORARILY STABILIZED WITHIN 7 DAYS AFTER THE CONSTRUCTION <br />THE APPROPRIATE SEED MIX AND EROSION CONTROL REQUIRED WITH THE ENGINEER. <br />CONTRACTOR SHALL REPAIR AND RESTORE ALL DISTURBED TURF AREAS AT NO COST TO OWNER. VERIFY 5. <br />REPORT ANY DISCREPANCIES IN THE PLANS IMMEDIATELY TO THE ENGINEER.4. <br />CALL GOPHER STATE ONE FOR FIELD UTILITY LOCATIIONS AS REQUIRED BY STATE LAW BEFORE DIGGING.3. <br />CONTRACTOR SHALL STAKE ALL WORK IN THE FIELD FOR APPROVAL BY THE ENGINEER.2. <br />PROVISIONS. THE CONTRACTOR SHALL KEEP THE INSPECTION AND MAINTENANCE LOG. <br />CONSTRUCTION SHALL BE GOVERNED BY THE 2018 EDITION OF THE MnDOT SPEC BOOK AND THE SPECIAL 1. <br />CITY OF ORONO <br />CITY OF LONG LAKE <br />HENNEPIN COUNTY <br />ADAM EDWARDS 952-249-4661 <br />952-476-2855SEAN DIERCKS <br />TIM BRUERS 612-596-0393 <br />ITEM NO.ITEM DESCRIPTION UNIT <br />QUANTITIES <br />TOTAL PROJECT <br />NOTES <br />2021.501 MOBILIZATION LUMP SUM 1 <br />2123.610 STREET SWEEPER (WITH PICKUP BROOM)HOUR 10 <br />1 2563.601 TRAFFIC CONTROL LUMP SUM 1 <br />2571.501 CONIFEROUS TREE 6' HT. B&B TREE 8 <br />2571.502 DECIDUOUS TREE 1" CAL. BARE ROOT TREE 36 <br />2571.502 DECIDUOUS TREE 1.5" CAL. CONT.TREE 4 <br />2571.502 DECIDUOUS TREE 1.5" CAL. B&B TREE 19 <br />2571.505 DECIDUOUS SHRUB NO. 2 CONT.SHRB 80 <br />2571.507 PERENNIAL NO 1 CONT PLNT 73 <br />2573.530 STORM DRAIN INLET PROTECTION EACH 5 <br />2573.601 TEMPORARY EROSION CONTROL LUMP SUM 1 <br />2557.501 WIRE FENCE DESIGN SPECIAL VINYL COATED LF 135 <br />1 <br />FOR TRAFFIC CONTROL BY THE ENGINEER <br />INCLUDES ALL ITEMS FOR TRAFFIC CONTROL, DETOURS, AND ANY OTHER ITEMS AS DEEMED NECESSARY