My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-11-2019 Council Packet
Orono
>
City Council
>
2019
>
03-11-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 12:16:46 PM
Creation date
5/22/2019 12:14:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
and Ride; and <br /> <br /> WHEREAS, the County, in consultation with the Park District and the City, completed a <br />concept design for the Navarre Connector that indicated additional design work is necessary to <br />fully determine the impacts on private property and cost; and <br /> <br />WHEREAS, the Park District in consultation with the County and the City will complete <br />design to a 60 percent (%) level and identify estimated project costs and easement acquisition <br />needs to determine if the project is feasible to all Parties; and <br /> <br /> WHEREAS, the County, the Park District and the City agree to cost participate in the <br />project for right of way land acquisition, design, construction administration, and construction of <br />the Navarre Connector, and each party’s cost participation shall be a not to exceed (NTE) <br />amount of One Hundred Thousand Dollars and No Cents ($100,000.00); and <br /> <br /> WHEREAS, once the project is determined feasible and if a temporary construction <br />easement along CR 19 is determined to be needed to construct the project, the County shall <br />acquire the temporary construction easement without incurring extra cost to the County’s cost <br />participation of $100,000; and <br /> <br /> WHEREAS, in an instant in which a permanent easement or right of way is determined to <br />be needed to successfully construct the project, and the cost of which would drive total project <br />cost to exceed each party’s cost participation NTE of $100,000, the Parties will re-negotiate the <br />terms of the agreement to either enter into an amendment or to terminate this agreement; and <br /> <br /> WHEREAS, once temporary and/or permanent construction easements are obtained, the <br />Park District, in consultation with the County and the City, will finalize the design and construct <br />the Navarre Connector if the project is determined feasible by all Parties; and <br /> <br /> WHEREAS, the Parties desire one agency to own, operate and maintain the Navarre <br />Connector and the City is willing to accept ownership, operations and maintenance <br />responsibilities of the trail segment; and <br /> <br /> WHEREAS, the City shall own, operate and maintain the Navarre Connector and Park <br />and Ride; and <br /> <br /> WHEREAS, the City shall designate 10 parking stalls at the Navarre Park and Ride for <br />regional trail users; and <br /> <br /> WHEREAS, at any point the project is determined to be terminated, the Parties agree to <br />split one-third (1/3) of the costs incurred to date for any design, acquisition, construction <br />administration, and construction. <br /> <br /> WHEREAS, it is contemplated that the work will be carried out by the parties under the <br />provisions of Minnesota Statutes, Section 162.17, Subdivision 1, and Section 471.59. <br />
The URL can be used to link to this page
Your browser does not support the video tag.