My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-11-2019 Council Packet
Orono
>
City Council
>
2019
>
03-11-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 12:16:46 PM
Creation date
5/22/2019 12:14:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FILE #LA19-000006 <br />February 19, 2019 <br />Page 3 of 4 <br /> <br />3 Sewer availability No. Sewer is available and <br />the density is greater than 1 <br />unit or 2 acres <br />4 Density. Each development in the <br />RPUD district shall have a <br />density within the range specified <br />in the comprehensive plan for the <br />specific site. <br />No, assuming approval of <br />2040 Plan <br />5 Incentives. The city may utilize <br />incentives to encourage the <br />construction of projects which are <br />consistent with the city's housing <br />goals. <br />None requested <br />6 Floor Ratio Ration, up to 1.0 No. Not final, but <br />approximately 0.62 <br />7a Setbacks No. Setbacks met <br />7b Height, stories, roof style No. Height will meet 30 feet, <br />3 stories or less, and a <br />residential style roof is <br />proposed. <br />7c Outside storage No. None proposed. <br />11 10% Private Recreational Area <br />(Active and/or Passive) <br />No, none yet shown <br />12 Common Ownership No. Property to remain in <br />common ownership <br />13 Signage No. Signage plans not yet <br />developed <br />14 Landscaping No. Landscaping Plans not <br />yet developed <br />15 Architectural Standards Plans not developed, but are <br />anticipate dot be based on <br />Stonebay palette. <br />16 Flexibility from standards None requested at this time <br />17 Traffic Studies Not suggested <br />18 Building Permits Expected <br />19 General regulations applicability Expected <br />20 Lighting No. Lighting plan not yet <br />developed <br />21 Trails No. Shown <br /> <br />Though additional information is necessary to complete a comprehensive review (Landscaping, <br />Lighting, Signage, Building elevation, etc.), the applicant is not requesting flexibility from current <br />standards. <br /> <br />LOT ANALYSIS WORKSHEET <br /> <br />Section 78-622 - Setbacks: <br /> <br />DISTRICT Required Proposed (approximate) <br />Front (Willow) 35 40 <br />Rear 35 40
The URL can be used to link to this page
Your browser does not support the video tag.